| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - T. L. WALLACE CONSTRUCTION, INC. |
- 4 - C W & W CONTRACTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
50,000.00 |
50,000.00 |
70,000.00 |
70,000.00 |
100,000.00 |
100,000.00 |
30,000.00 |
30,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (str. no. 08353620102501 ; sta.
23+82.31 ; 135' x 18' treated timber trestle bridge) |
1   |
EACH |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
12,500.00 |
12,500.00 |
15,000.00 |
15,000.00 |
| 202-02-A-02 |
removal of bridge (str. no. 08353620105301 ; sta.
61+62.02 ; 154' x 18' treated timber trestle bridge) |
1   |
EACH |
25,000.00 |
25,000.00 |
12,000.00 |
12,000.00 |
14,500.00 |
14,500.00 |
20,000.00 |
20,000.00 |
| 202-02-H |
removal of guard rail
|
448   |
LNFT |
12.00 |
5,376.00 |
3.00 |
1,344.00 |
5.00 |
2,240.00 |
15.00 |
6,720.00 |
| 203-02 |
drainage excavation
|
1,999   |
CUYD |
20.00 |
39,980.00 |
14.00 |
27,986.00 |
12.50 |
24,987.50 |
30.00 |
59,970.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
90,000.00 |
90,000.00 |
55,000.00 |
55,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
250.00 |
4,000.00 |
145.00 |
2,320.00 |
64.00 |
1,024.00 |
250.00 |
4,000.00 |
| 204-06 |
temporary silt fencing
|
550   |
LNFT |
2.50 |
1,375.00 |
4.00 |
2,200.00 |
3.00 |
1,650.00 |
3.00 |
1,650.00 |
| 302-02-D-01 |
class ii base course (8 1/2" thick)
|
4,214.3 |
SQYD |
26.00 |
109,571.80 |
28.00 |
118,000.40 |
28.00 |
118,000.40 |
25.00 |
105,357.50 |
| 304-05 |
lime treatment (type e)
|
48.73 |
TON |
250.00 |
12,182.50 |
285.00 |
13,888.05 |
375.00 |
18,273.75 |
250.00 |
12,182.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
74   |
CUYD |
125.00 |
9,250.00 |
115.00 |
8,510.00 |
94.00 |
6,956.00 |
100.00 |
7,400.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
30.00 |
15,000.00 |
100.00 |
50,000.00 |
43.75 |
21,875.00 |
100.00 |
50,000.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
90.0 |
CUYD |
100.00 |
9,000.00 |
108.00 |
9,720.00 |
125.00 |
11,250.00 |
100.00 |
9,000.00 |
| 502-01 |
superpave asphaltic concrete
|
622.5 |
TON |
150.00 |
93,375.00 |
150.00 |
93,375.00 |
250.00 |
155,625.00 |
200.00 |
124,500.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
228.5 |
TON |
250.00 |
57,125.00 |
175.00 |
39,987.50 |
312.50 |
71,406.25 |
200.00 |
45,700.00 |
| 701-05-G |
side drain pipe (18")
|
376   |
LNFT |
115.00 |
43,240.00 |
45.00 |
16,920.00 |
53.75 |
20,210.00 |
60.00 |
22,560.00 |
| 701-05-I |
side drain pipe (24")
|
112   |
LNFT |
185.00 |
20,720.00 |
55.00 |
6,160.00 |
65.00 |
7,280.00 |
70.00 |
7,840.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
168   |
LNFT |
200.00 |
33,600.00 |
50.00 |
8,400.00 |
50.00 |
8,400.00 |
70.00 |
11,760.00 |
| 704-03 |
blocked out guard rail
|
225.0 |
LNFT |
20.00 |
4,500.00 |
25.00 |
5,625.00 |
31.25 |
7,031.25 |
25.00 |
5,625.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
58.00 |
11,600.00 |
65.00 |
13,000.00 |
77.50 |
15,500.00 |
70.00 |
14,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
2,200.00 |
13,200.00 |
2,650.00 |
15,900.00 |
3,000.00 |
18,000.00 |
2,700.00 |
16,200.00 |
| 705-01 |
barbed wire fence
|
1,615   |
LNFT |
7.00 |
11,305.00 |
6.50 |
10,497.50 |
8.00 |
12,920.00 |
20.00 |
32,300.00 |
| 705-02 |
combination mesh & barbed wire fence
|
220   |
LNFT |
8.00 |
1,760.00 |
7.50 |
1,650.00 |
9.50 |
2,090.00 |
25.00 |
5,500.00 |
| 705-04 |
single swinging driveway gates
|
4   |
EACH |
550.00 |
2,200.00 |
500.00 |
2,000.00 |
625.00 |
2,500.00 |
2,000.00 |
8,000.00 |
| 705-05 |
double swinging driveway gates
|
1   |
DBGT |
800.00 |
800.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
| 708-01 |
right-of-way monument
|
16   |
EACH |
425.00 |
6,800.00 |
140.00 |
2,240.00 |
175.00 |
2,800.00 |
300.00 |
4,800.00 |
| 708-02 |
right-of-way monument witness post
|
16   |
EACH |
425.00 |
6,800.00 |
50.00 |
800.00 |
62.50 |
1,000.00 |
300.00 |
4,800.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
56   |
SQYD |
250.00 |
14,000.00 |
50.00 |
2,800.00 |
141.25 |
7,910.00 |
100.00 |
5,600.00 |
| 711-04 |
geotextile fabric
|
56   |
SQYD |
17.00 |
952.00 |
12.00 |
672.00 |
7.00 |
392.00 |
3.00 |
168.00 |
| 712-04 |
flexible revetment
|
950   |
SQYD |
52.00 |
49,400.00 |
54.00 |
51,300.00 |
140.00 |
133,000.00 |
90.00 |
85,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
40,000.00 |
40,000.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
3.279 |
MILE |
750.00 |
2,459.25 |
725.00 |
2,377.28 |
750.00 |
2,459.25 |
1,000.00 |
3,279.00 |
| 716-01-A |
mulch (vegetative)
|
7.50 |
TON |
550.00 |
4,125.00 |
595.00 |
4,462.50 |
750.00 |
5,625.00 |
1,500.00 |
11,250.00 |
| 717-01 |
seeding
|
450   |
LB |
8.50 |
3,825.00 |
7.00 |
3,150.00 |
8.75 |
3,937.50 |
15.00 |
6,750.00 |
| 718-01 |
fertilizer
|
5,000   |
LB |
0.65 |
3,250.00 |
0.60 |
3,000.00 |
0.72 |
3,600.00 |
1.00 |
5,000.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
2,600   |
SQYD |
1.75 |
4,550.00 |
1.30 |
3,380.00 |
1.62 |
4,212.00 |
1.65 |
4,290.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
40,000.00 |
40,000.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
| 725-01 |
temporary detour roads
|
2,274.2 |
SQYD |
75.00 |
170,565.00 |
100.00 |
227,420.00 |
52.00 |
118,258.40 |
77.00 |
175,113.40 |
| 725-02 |
temporary detour bridging
|
160.00 |
LNFT |
1,200.00 |
192,000.00 |
1,500.00 |
240,000.00 |
2,500.00 |
400,000.00 |
1,600.00 |
256,000.00 |
| 725-03 |
low profile runaround
|
1   |
EACH |
180,000.00 |
180,000.00 |
245,000.00 |
245,000.00 |
150,000.00 |
150,000.00 |
115,000.00 |
115,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
285,000.00 |
285,000.00 |
320,000.00 |
320,000.00 |
225,000.00 |
225,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
75.00 |
600.00 |
140.00 |
1,120.00 |
95.00 |
760.00 |
| 731-02 |
reflectorized raised pavement markers
|
32   |
EACH |
5.25 |
168.00 |
5.10 |
163.20 |
6.30 |
201.60 |
10.00 |
320.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.964 |
MILE |
3,000.00 |
2,892.00 |
2,904.00 |
2,799.46 |
7,500.00 |
7,230.00 |
7,600.00 |
7,326.40 |
| 735-01 |
mailboxes
|
3   |
EACH |
50.00 |
150.00 |
10.00 |
30.00 |
31.25 |
93.75 |
200.00 |
600.00 |
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
150.00 |
450.00 |
150.00 |
450.00 |
200.00 |
600.00 |
200.00 |
600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
40,000.00 |
40,000.00 |
37,000.00 |
37,000.00 |
65,000.00 |
65,000.00 |
| 804-01-B |
precast concrete piles (14")
|
2,160   |
LNFT |
46.00 |
99,360.00 |
65.00 |
140,400.00 |
45.50 |
98,280.00 |
80.00 |
172,800.00 |
| 804-01-F |
precast concrete piles (24")
|
690   |
LNFT |
120.00 |
82,800.00 |
170.00 |
117,300.00 |
115.73 |
79,853.70 |
220.00 |
151,800.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
7,500.00 |
15,000.00 |
5,000.00 |
10,000.00 |
21,000.00 |
42,000.00 |
1.00 |
2.00 |
| 805-01-F |
class a concrete (bents)
|
124.29 |
CUYD |
1,000.00 |
124,290.00 |
890.00 |
110,618.10 |
800.00 |
99,432.00 |
1,200.00 |
149,148.00 |
| 805-03 |
class aa concrete
|
217.20 |
CUYD |
700.00 |
152,040.00 |
850.00 |
184,620.00 |
700.00 |
152,040.00 |
1,000.00 |
217,200.00 |
| 805-04 |
class aa(m) concrete
|
129.48 |
CUYD |
1,100.00 |
142,428.00 |
1,075.00 |
139,191.00 |
750.00 |
97,110.00 |
1,000.00 |
129,480.00 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
948.0 |
LNFT |
75.00 |
71,100.00 |
90.00 |
85,320.00 |
68.00 |
64,464.00 |
125.00 |
118,500.00 |
| 805-11 |
strip seal joints
|
74.28 |
LNFT |
225.00 |
16,713.00 |
180.00 |
13,370.40 |
185.00 |
13,741.80 |
300.00 |
22,284.00 |
| 806-01 |
deformed reinforcing steel
|
95,174   |
LB |
1.30 |
123,726.20 |
0.90 |
85,656.60 |
1.15 |
109,450.10 |
3.00 |
285,522.00 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
11,000.00 |
11,000.00 |
12,000.00 |
12,000.00 |
11,000.00 |
11,000.00 |
55,000.00 |
55,000.00 |
| 810-01 |
concrete railing (type)
|
640.00 |
LNFT |
65.00 |
41,600.00 |
70.00 |
44,800.00 |
75.00 |
48,000.00 |
100.00 |
64,000.00 |
| 813-01 |
concrete approach slabs
|
550.68 |
SQYD |
260.00 |
143,176.80 |
260.00 |
143,176.80 |
750.00 |
413,010.00 |
225.00 |
123,903.00 |
| S-101 |
special anchor section
|
2   |
EACH |
1,200.00 |
2,400.00 |
950.00 |
1,900.00 |
2,500.00 |
5,000.00 |
15,000.00 |
30,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,727,820.55 |
|
2,839,280.79 |
|
3,163,540.25 |
|
3,294,560.80 |
|