DBE GOAL FED
Lead Project: 319-01-0018
Parish: JACKSON
Routes: LA 542
Description: LA 542 CREEK BRIDGES
Type Const: grading, class ii base course, drainage structures, superpave asphaltic concrete
pavement, concrete approach slab, concrete quad beam bridge and related work
Estimated Construction Cost: $1,643,894.35
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $1,548,628.70
2 14422 T. L. WALLACE CONSTRUCTION, INC. $1,724,471.73
3 18546 C W & W CONTRACTORS, INC. $2,096,308.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
C W & W CONTRACTORS, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 40,000.00 40,000.00 150,000.00 150,000.00 25,000.00 25,000.00    
202-02-A-01 removal of bridges (sta. 112+66.78: 24' x 38' timber
trestle bridge)
1      EACH 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00    
202-02-A-02 removal of bridges (sta. 121+66: 24'x 78' timber
trestle bridge)
1      EACH 20,000.00 20,000.00 11,000.00 11,000.00 15,000.00 15,000.00    
202-02-G removal of surfacing & stabilized base 3,618.5    SQYD 6.00 21,711.00 4.50 16,283.25 5.00 18,092.50    
202-02-H removal of guard rail 726      LNFT 4.00 2,904.00 3.40 2,468.40 15.00 10,890.00    
203-02 drainage excavation 849      CUYD 10.00 8,490.00 6.60 5,603.40 20.00 16,980.00    
203-05 excavation & embankment lump      LUMP 130,000.00 130,000.00 90,000.00 90,000.00 200,000.00 200,000.00    
204-05-A temporary sediment check dams (hay) 11      EACH 150.00 1,650.00 124.00 1,364.00 250.00 2,750.00    
204-06 temporary silt fencing 1,400      LNFT 3.00 4,200.00 1.50 2,100.00 3.00 4,200.00    
302-02-C class ii base course (8" thick) 5,000.9    SQYD 24.00 120,021.60 31.50 157,528.35 22.00 110,019.80    
401-02 aggregate surface course (adjusted vehicular
measurement)
209      CUYD 70.00 14,630.00 90.00 18,810.00 100.00 20,900.00    
402-01 traffic maintenance aggregate (vehicular measurement) 200.0    CUYD 70.00 14,000.00 75.00 15,000.00 100.00 20,000.00    
502-01 superpave asphaltic concrete 768.4    TON 155.00 119,102.00 225.00 172,890.00 200.00 153,680.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
313.6    TON 180.00 56,448.00 225.00 70,560.00 200.00 62,720.00    
701-05-G side drain pipe (18")(erosion control) 116      LNFT 75.00 8,700.00 60.00 6,960.00 50.00 5,800.00    
704-03 blocked out guard rail 250.0    LNFT 20.00 5,000.00 28.00 7,000.00 40.00 10,000.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 67.50 6,750.00 75.00 7,500.00    
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00 3,000.00 12,000.00 4,000.00 16,000.00    
708-01 right-of-way monument 19      EACH 300.00 5,700.00 157.50 2,992.50 300.00 5,700.00    
708-02 right-of-way monument witness post 19      EACH 150.00 2,850.00 56.25 1,068.75 300.00 5,700.00    
711-01-D riprap (55 lb, 12" thick) 900      SQYD 60.00 54,000.00 50.60 45,540.00 85.00 76,500.00    
711-04 geotextile fabric 900      SQYD 3.00 2,700.00 3.50 3,150.00 3.00 2,700.00    
712-04 flexible revetment 735      SQYD 55.00 40,425.00 65.25 47,958.75 90.00 66,150.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 15,500.00 15,500.00 50,000.00 50,000.00    
716-01-A mulch (vegetative) 0.10   ACRE 6,000.00 600.00 1,700.00 170.00 15,000.00 1,500.00    
717-01 seeding 151      LB 8.50 1,283.50 9.50 1,434.50 50.00 7,550.00    
718-01 fertilizer 3,753      LB 0.50 1,876.50 0.34 1,276.02 3.00 11,259.00    
720-01-A erosion control system, slope protection (type a) 928      SQYD 1.50 1,392.00 1.40 1,299.20 4.00 3,712.00    
720-01-D erosion control system, flexible channel liner (type d) 511      SQYD 2.60 1,328.60 2.80 1,430.80 5.00 2,555.00    
722-01 project site laboratory 1      EACH 7,000.00 7,000.00 5,000.00 5,000.00 20,000.00 20,000.00    
726-01 bedding material 139.8    CUYD 90.00 12,582.00 100.00 13,980.00 125.00 17,475.00    
727-01 mobilization lump      LUMP 145,000.00 145,000.00 175,000.00 175,000.00 175,000.00 175,000.00    
729-16-B object marker assembly (type 2) 4      EACH 70.00 280.00 73.00 292.00 100.00 400.00    
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 84.00 336.00 100.00 400.00    
731-02 reflectorized raised pavement markers 45      EACH 5.00 225.00 5.60 252.00 50.00 2,250.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.946  MILE 5,000.00 4,730.00 5,625.00 5,321.25 10,000.00 9,460.00    
732-03-A plastic pavement striping (broken line)(4" width) 0.328  MILE 2,000.00 656.00 2,250.00 738.00 5,000.00 1,640.00    
740-01 construction layout lump      LUMP 25,000.00 25,000.00 26,500.00 26,500.00 20,000.00 20,000.00    
804-01-F precast concrete piles (24") 960      LNFT 125.00 120,000.00 107.00 102,720.00 200.00 192,000.00    
804-12 loading permanent piles 1      EACH 2,500.00 2,500.00 20,000.00 20,000.00 1.00 1.00    
805-01-B class a concrete (box culvert headwalls) 18.41   CUYD 1,500.00 27,615.00 1,200.00 22,092.00 1,200.00 22,092.00    
805-01-F class a concrete (bents) 41.27   CUYD 1,200.00 49,524.00 1,500.00 61,905.00 1,200.00 49,524.00    
805-04 class aa(m) concrete 72.88   CUYD 1,000.00 72,880.00 1,000.00 72,880.00 1,000.00 72,880.00    
805-08-H precast-prestressed concrete girders (type quad beam) 553.0    LNFT 100.00 55,300.00 65.00 35,945.00 150.00 82,950.00    
805-11 strip seal joints 68.00   LNFT 235.00 15,980.00 215.00 14,620.00 300.00 20,400.00    
805-12-H reinforced concrete box culverts (7'x 4') 256.0    LNFT 550.00 140,800.00 591.00 151,296.00 800.00 204,800.00    
806-01 deformed reinforcing steel 29,467      LB 1.00 29,467.00 1.04 30,645.68 3.00 88,401.00    
807-08 structural metalwork lump      LUMP 7,500.00 7,500.00 9,300.00 9,300.00 30,000.00 30,000.00    
810-01 concrete railing (barrier) 160.00   LNFT 100.00 16,000.00 67.50 10,800.00 100.00 16,000.00    
813-01 concrete approach slabs 311.11   SQYD 250.00 77,777.50 208.00 64,710.88 250.00 77,777.50    
S-001 dynamic message sign unit 2      EACH 10,000.00 20,000.00 11,000.00 22,000.00 25,000.00 50,000.00    
                       
 CONTRACTOR TOTAL       1,548,628.70   1,724,471.73   2,096,308.80    