| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - T. L. WALLACE CONSTRUCTION, INC. |
- 3 - C W & W CONTRACTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
150,000.00 |
150,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 112+66.78: 24' x 38' timber
trestle bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 121+66: 24'x 78' timber
trestle bridge) |
1   |
EACH |
20,000.00 |
20,000.00 |
11,000.00 |
11,000.00 |
15,000.00 |
15,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,618.5 |
SQYD |
6.00 |
21,711.00 |
4.50 |
16,283.25 |
5.00 |
18,092.50 |
|
|
| 202-02-H |
removal of guard rail
|
726   |
LNFT |
4.00 |
2,904.00 |
3.40 |
2,468.40 |
15.00 |
10,890.00 |
|
|
| 203-02 |
drainage excavation
|
849   |
CUYD |
10.00 |
8,490.00 |
6.60 |
5,603.40 |
20.00 |
16,980.00 |
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
130,000.00 |
130,000.00 |
90,000.00 |
90,000.00 |
200,000.00 |
200,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
11   |
EACH |
150.00 |
1,650.00 |
124.00 |
1,364.00 |
250.00 |
2,750.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,400   |
LNFT |
3.00 |
4,200.00 |
1.50 |
2,100.00 |
3.00 |
4,200.00 |
|
|
| 302-02-C |
class ii base course (8" thick)
|
5,000.9 |
SQYD |
24.00 |
120,021.60 |
31.50 |
157,528.35 |
22.00 |
110,019.80 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
209   |
CUYD |
70.00 |
14,630.00 |
90.00 |
18,810.00 |
100.00 |
20,900.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
70.00 |
14,000.00 |
75.00 |
15,000.00 |
100.00 |
20,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
768.4 |
TON |
155.00 |
119,102.00 |
225.00 |
172,890.00 |
200.00 |
153,680.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
313.6 |
TON |
180.00 |
56,448.00 |
225.00 |
70,560.00 |
200.00 |
62,720.00 |
|
|
| 701-05-G |
side drain pipe (18")(erosion control)
|
116   |
LNFT |
75.00 |
8,700.00 |
60.00 |
6,960.00 |
50.00 |
5,800.00 |
|
|
| 704-03 |
blocked out guard rail
|
250.0 |
LNFT |
20.00 |
5,000.00 |
28.00 |
7,000.00 |
40.00 |
10,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
67.50 |
6,750.00 |
75.00 |
7,500.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
3,000.00 |
12,000.00 |
4,000.00 |
16,000.00 |
|
|
| 708-01 |
right-of-way monument
|
19   |
EACH |
300.00 |
5,700.00 |
157.50 |
2,992.50 |
300.00 |
5,700.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
19   |
EACH |
150.00 |
2,850.00 |
56.25 |
1,068.75 |
300.00 |
5,700.00 |
|
|
| 711-01-D |
riprap (55 lb, 12" thick)
|
900   |
SQYD |
60.00 |
54,000.00 |
50.60 |
45,540.00 |
85.00 |
76,500.00 |
|
|
| 711-04 |
geotextile fabric
|
900   |
SQYD |
3.00 |
2,700.00 |
3.50 |
3,150.00 |
3.00 |
2,700.00 |
|
|
| 712-04 |
flexible revetment
|
735   |
SQYD |
55.00 |
40,425.00 |
65.25 |
47,958.75 |
90.00 |
66,150.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,500.00 |
15,500.00 |
50,000.00 |
50,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.10 |
ACRE |
6,000.00 |
600.00 |
1,700.00 |
170.00 |
15,000.00 |
1,500.00 |
|
|
| 717-01 |
seeding
|
151   |
LB |
8.50 |
1,283.50 |
9.50 |
1,434.50 |
50.00 |
7,550.00 |
|
|
| 718-01 |
fertilizer
|
3,753   |
LB |
0.50 |
1,876.50 |
0.34 |
1,276.02 |
3.00 |
11,259.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
928   |
SQYD |
1.50 |
1,392.00 |
1.40 |
1,299.20 |
4.00 |
3,712.00 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
511   |
SQYD |
2.60 |
1,328.60 |
2.80 |
1,430.80 |
5.00 |
2,555.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 726-01 |
bedding material
|
139.8 |
CUYD |
90.00 |
12,582.00 |
100.00 |
13,980.00 |
125.00 |
17,475.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
145,000.00 |
145,000.00 |
175,000.00 |
175,000.00 |
175,000.00 |
175,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
70.00 |
280.00 |
73.00 |
292.00 |
100.00 |
400.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
84.00 |
336.00 |
100.00 |
400.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
45   |
EACH |
5.00 |
225.00 |
5.60 |
252.00 |
50.00 |
2,250.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.946 |
MILE |
5,000.00 |
4,730.00 |
5,625.00 |
5,321.25 |
10,000.00 |
9,460.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.328 |
MILE |
2,000.00 |
656.00 |
2,250.00 |
738.00 |
5,000.00 |
1,640.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
26,500.00 |
26,500.00 |
20,000.00 |
20,000.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
960   |
LNFT |
125.00 |
120,000.00 |
107.00 |
102,720.00 |
200.00 |
192,000.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
2,500.00 |
2,500.00 |
20,000.00 |
20,000.00 |
1.00 |
1.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.41 |
CUYD |
1,500.00 |
27,615.00 |
1,200.00 |
22,092.00 |
1,200.00 |
22,092.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
41.27 |
CUYD |
1,200.00 |
49,524.00 |
1,500.00 |
61,905.00 |
1,200.00 |
49,524.00 |
|
|
| 805-04 |
class aa(m) concrete
|
72.88 |
CUYD |
1,000.00 |
72,880.00 |
1,000.00 |
72,880.00 |
1,000.00 |
72,880.00 |
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
553.0 |
LNFT |
100.00 |
55,300.00 |
65.00 |
35,945.00 |
150.00 |
82,950.00 |
|
|
| 805-11 |
strip seal joints
|
68.00 |
LNFT |
235.00 |
15,980.00 |
215.00 |
14,620.00 |
300.00 |
20,400.00 |
|
|
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
256.0 |
LNFT |
550.00 |
140,800.00 |
591.00 |
151,296.00 |
800.00 |
204,800.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
29,467   |
LB |
1.00 |
29,467.00 |
1.04 |
30,645.68 |
3.00 |
88,401.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
7,500.00 |
7,500.00 |
9,300.00 |
9,300.00 |
30,000.00 |
30,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
160.00 |
LNFT |
100.00 |
16,000.00 |
67.50 |
10,800.00 |
100.00 |
16,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
311.11 |
SQYD |
250.00 |
77,777.50 |
208.00 |
64,710.88 |
250.00 |
77,777.50 |
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
10,000.00 |
20,000.00 |
11,000.00 |
22,000.00 |
25,000.00 |
50,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,548,628.70 |
|
1,724,471.73 |
|
2,096,308.80 |
|
|
|