| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
272   |
LNFT |
5.50 |
1,496.00 |
6.00 |
1,632.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
200   |
CUYD |
50.00 |
10,000.00 |
70.00 |
14,000.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
527   |
CUYD |
40.00 |
21,080.00 |
40.00 |
21,080.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
7,284.0 |
TON |
100.00 |
728,400.00 |
90.00 |
655,560.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
335.8 |
TON |
160.00 |
53,728.00 |
200.00 |
67,160.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
3,060   |
SQYD |
110.00 |
336,600.00 |
90.00 |
275,400.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
58.00 |
5,800.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
112.5 |
LNFT |
50.00 |
5,625.00 |
48.00 |
5,400.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
28.00 |
1,400.00 |
26.00 |
1,300.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
3,300.00 |
13,200.00 |
3,100.00 |
12,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
145,000.00 |
145,000.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
260   |
LNFT |
2.20 |
572.00 |
2.00 |
520.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.400 |
MILE |
700.00 |
2,380.00 |
137.00 |
465.80 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.970 |
MILE |
400.00 |
388.00 |
420.00 |
407.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
9.750 |
MILE |
5.50 |
53.63 |
525.00 |
5,118.75 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
145,000.00 |
145,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
45.0 |
SQFT |
17.00 |
765.00 |
11.00 |
495.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
60.00 |
120.00 |
68.00 |
136.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
90.00 |
360.00 |
84.00 |
336.00 |
|
|
|
|
| 729-21 |
u-channel post
|
6   |
EACH |
66.00 |
396.00 |
105.00 |
630.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,070   |
EACH |
6.00 |
6,420.00 |
6.00 |
6,420.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
260   |
LNFT |
5.00 |
1,300.00 |
5.00 |
1,300.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.750 |
MILE |
2,700.00 |
26,325.00 |
2,550.00 |
24,862.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.970 |
MILE |
1,000.00 |
970.00 |
892.00 |
865.24 |
|
|
|
|
| 735-01 |
mailboxes
|
92   |
EACH |
5.50 |
506.00 |
1.00 |
92.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
85   |
EACH |
100.00 |
8,500.00 |
100.00 |
8,500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
200.00 |
400.00 |
250.00 |
500.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
250.00 |
250.00 |
300.00 |
300.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
1,000.00 |
1,000.00 |
40.00 |
40.00 |
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
10,000.00 |
10,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| S-002 |
saw cutting asphaltic concrete pavement
|
47,028   |
INFT |
0.60 |
28,216.80 |
0.01 |
470.28 |
|
|
|
|
| S-003 |
tree pruning
|
2   |
EACH |
500.00 |
1,000.00 |
472.00 |
944.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,419,951.43 |
|
1,497,134.97 |
|
|
|
|
|