| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - GERACE CONSTRUCTION LLC |
- 3 - R.D. OWENS CONSTRUCTION, INC. |
- 4 - CAMO CONSTRUCTION CO. INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
75,000.00 |
75,000.00 |
12,000.00 |
12,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
5,500.00 |
5,500.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
16,333.3 |
SQYD |
3.30 |
53,899.89 |
2.50 |
40,833.25 |
4.00 |
65,333.20 |
9.00 |
146,999.70 |
| 203-01 |
general excavation
|
5,044   |
CUYD |
6.00 |
30,264.00 |
5.00 |
25,220.00 |
6.00 |
30,264.00 |
5.50 |
27,742.00 |
| 203-03 |
embankment
|
23,981   |
CUYD |
13.25 |
317,748.25 |
17.00 |
407,677.00 |
16.00 |
383,696.00 |
25.00 |
599,525.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
225.00 |
2,250.00 |
75.00 |
750.00 |
200.00 |
2,000.00 |
112.00 |
1,120.00 |
| 204-06 |
temporary silt fencing
|
9,922   |
LNFT |
1.50 |
14,883.00 |
2.00 |
19,844.00 |
2.00 |
19,844.00 |
2.50 |
24,805.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
3,000.00 |
6,000.00 |
12,000.00 |
24,000.00 |
| 302-02-D |
class ii base course (8 1/2" thick)
|
24,286.0 |
SQYD |
23.75 |
576,792.50 |
21.00 |
510,006.00 |
18.00 |
437,148.00 |
17.35 |
421,362.10 |
| 305-01 |
subgrade layer (12" thick)
|
19,876   |
SQYD |
10.00 |
198,760.00 |
12.00 |
238,512.00 |
11.50 |
228,574.00 |
13.25 |
263,357.00 |
| 502-01 |
superpave asphaltic concrete
|
4,130.2 |
TON |
102.00 |
421,280.40 |
115.00 |
474,973.00 |
118.80 |
490,667.76 |
111.00 |
458,452.20 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
21.0 |
TON |
190.00 |
3,990.00 |
375.00 |
7,875.00 |
360.80 |
7,576.80 |
365.00 |
7,665.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
168   |
LNFT |
235.00 |
39,480.00 |
175.00 |
29,400.00 |
150.00 |
25,200.00 |
150.00 |
25,200.00 |
| 701-05-G |
side drain pipe (18")
|
160   |
LNFT |
45.00 |
7,200.00 |
85.00 |
13,600.00 |
38.00 |
6,080.00 |
35.00 |
5,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,000.00 |
9,000.00 |
6,500.00 |
6,500.00 |
20,000.00 |
20,000.00 |
13,900.00 |
13,900.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.341 |
MILE |
500.00 |
170.50 |
1,000.00 |
341.00 |
500.00 |
170.50 |
485.00 |
165.39 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
4.099 |
MILE |
600.00 |
2,459.40 |
2,200.00 |
9,017.80 |
900.00 |
3,689.10 |
971.00 |
3,980.13 |
| 713-06 |
temporary reflectorized raised pavement markers
|
125   |
EACH |
5.00 |
625.00 |
10.00 |
1,250.00 |
6.00 |
750.00 |
6.00 |
750.00 |
| 716-01-A |
mulch (vegetative)
|
24.1 |
TON |
420.00 |
10,122.00 |
500.00 |
12,050.00 |
500.00 |
12,050.00 |
440.00 |
10,604.00 |
| 717-01 |
seeding
|
362   |
LB |
8.00 |
2,896.00 |
9.00 |
3,258.00 |
9.00 |
3,258.00 |
9.00 |
3,258.00 |
| 718-01 |
fertilizer
|
12,060   |
LB |
0.55 |
6,633.00 |
0.65 |
7,839.00 |
0.50 |
6,030.00 |
0.45 |
5,427.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
6,000.00 |
6,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
14,100.00 |
14,100.00 |
| 726-01 |
bedding material
|
76.3 |
CUYD |
95.00 |
7,248.50 |
95.00 |
7,248.50 |
125.00 |
9,537.50 |
45.25 |
3,452.58 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
95,000.00 |
95,000.00 |
90,000.00 |
90,000.00 |
70,788.00 |
70,788.00 |
| 731-02 |
reflectorized raised pavement markers
|
125   |
EACH |
6.00 |
750.00 |
8.00 |
1,000.00 |
6.00 |
750.00 |
6.00 |
750.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.099 |
MILE |
2,500.00 |
10,247.50 |
2,600.00 |
10,657.40 |
3,000.00 |
12,297.00 |
2,790.00 |
11,436.21 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.341 |
MILE |
850.00 |
289.85 |
2,000.00 |
682.00 |
675.00 |
230.18 |
670.00 |
228.47 |
| 735-01 |
mailboxes
|
1   |
EACH |
2.00 |
2.00 |
250.00 |
250.00 |
150.00 |
150.00 |
355.00 |
355.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
135.00 |
135.00 |
250.00 |
250.00 |
100.00 |
100.00 |
325.00 |
325.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
90,000.00 |
90,000.00 |
45,661.00 |
45,661.00 |
| S-001 |
plugging existing water wells
|
1   |
EACH |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
8,525.00 |
8,525.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,875,126.79 |
|
1,993,033.95 |
|
2,058,896.04 |
|
2,217,033.78 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - D & J CONSTRUCTION CO., INC. |
- 6 - MERRICK CONSTRUCTION CO. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
16,333.3 |
SQYD |
5.50 |
89,833.15 |
1.00 |
16,333.30 |
|
|
|
|
| 203-01 |
general excavation
|
5,044   |
CUYD |
7.00 |
35,308.00 |
2.00 |
10,088.00 |
|
|
|
|
| 203-03 |
embankment
|
23,981   |
CUYD |
16.00 |
383,696.00 |
40.00 |
959,240.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
200.00 |
2,000.00 |
20.00 |
200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
9,922   |
LNFT |
2.00 |
19,844.00 |
0.50 |
4,961.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
1,000.00 |
2,000.00 |
500.00 |
1,000.00 |
|
|
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
24,286.0 |
SQYD |
20.00 |
485,720.00 |
20.00 |
485,720.00 |
|
|
|
|
| 305-01 |
subgrade layer (12" thick)
|
19,876   |
SQYD |
15.00 |
298,140.00 |
18.00 |
357,768.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,130.2 |
TON |
112.00 |
462,582.40 |
110.00 |
454,322.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
21.0 |
TON |
400.00 |
8,400.00 |
400.00 |
8,400.00 |
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
168   |
LNFT |
175.00 |
29,400.00 |
150.00 |
25,200.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
160   |
LNFT |
50.00 |
8,000.00 |
50.00 |
8,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
75,000.00 |
75,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.341 |
MILE |
260.00 |
88.66 |
400.00 |
136.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
4.099 |
MILE |
350.00 |
1,434.65 |
800.00 |
3,279.20 |
|
|
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
125   |
EACH |
8.00 |
1,000.00 |
5.00 |
625.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
24.1 |
TON |
400.00 |
9,640.00 |
1,000.00 |
24,100.00 |
|
|
|
|
| 717-01 |
seeding
|
362   |
LB |
8.00 |
2,896.00 |
10.00 |
3,620.00 |
|
|
|
|
| 718-01 |
fertilizer
|
12,060   |
LB |
0.45 |
5,427.00 |
1.00 |
12,060.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
12,000.00 |
12,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
76.3 |
CUYD |
130.00 |
9,919.00 |
35.00 |
2,670.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
225,000.00 |
225,000.00 |
270,000.00 |
270,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
125   |
EACH |
10.00 |
1,250.00 |
5.00 |
625.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.099 |
MILE |
4,000.00 |
16,396.00 |
2,400.00 |
9,837.60 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.341 |
MILE |
3,350.00 |
1,142.35 |
600.00 |
204.60 |
|
|
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
25.00 |
25.00 |
5.00 |
5.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
125.00 |
125.00 |
150.00 |
150.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
80,000.00 |
80,000.00 |
27,000.00 |
27,000.00 |
|
|
|
|
| S-001 |
plugging existing water wells
|
1   |
EACH |
6,000.00 |
6,000.00 |
500.00 |
500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,382,267.21 |
|
2,713,045.60 |
|
|
|
|
|