DBE GOAL FED
Lead Project: 019-02-0051
Parish: E BATON ROUGE
Routes: US 61
Description: I-110 (AVOCET ST) - LA 964
Type Const: grading, cold planing, class ii bc, cleaning and resealing joints, patching, drain
struct, rubblizing, superpave acp, rap treated interlayer, shoulder drain, and related work
Estimated Construction Cost: $12,240,818.92
 
RankLicenseBidderConstruction Bid
1 00481 COASTAL BRIDGE CO., L.L.C. $10,278,439.89
2 00046 BARBER BROS. CONTRACTING CO., L.L.C $10,577,218.70
3 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $12,738,808.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
COASTAL BRIDGE CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 4,800      SQYD 10.00 48,000.00 25.00 120,000.00 20.00 96,000.00    
202-02-D removal of concrete walks and drives 1,145      SQYD 15.00 17,175.00 15.00 17,175.00 20.00 22,900.00    
202-02-E removal of concrete curbs 384.0    LNFT 10.00 3,840.00 6.00 2,304.00 10.00 3,840.00    
202-02-G removal of surfacing & stabilized base 4,455.1    SQYD 10.00 44,551.00 8.00 35,640.80 20.00 89,102.00    
202-02-H removal of guard rail 101      LNFT 10.00 1,010.00 10.00 1,010.00 10.00 1,010.00    
202-02-I removal of stabilized base (6" thick) 4,800.0    SQYD 8.00 38,400.00 6.00 28,800.00 25.00 120,000.00    
202-02-J removal of concrete headwalls and wingwalls 7      EACH 800.00 5,600.00 1,000.00 7,000.00 1,200.00 8,400.00    
202-02-K removal of catch basins 2      EACH 750.00 1,500.00 1,000.00 2,000.00 1,000.00 2,000.00    
202-02-L removal of side drain pipe (24" rcp) 56      LNFT 5.00 280.00 10.00 560.00 20.00 1,120.00    
203-01 general excavation 1,343      CUYD 10.00 13,430.00 25.00 33,575.00 20.00 26,860.00    
203-02 drainage excavation 400      CUYD 10.00 4,000.00 15.00 6,000.00 20.00 8,000.00    
203-07 borrow (vehicular measurement) 4,243      CUYD 20.00 84,860.00 25.00 106,075.00 30.00 127,290.00    
204-02 temporary hay or straw bales 343      EACH 10.00 3,430.00 25.00 8,575.00 10.00 3,430.00    
204-06 temporary silt fencing 43,162      LNFT 1.25 53,952.50 1.20 51,794.40 2.00 86,324.00    
302-02-B class ii base course (6" thick) 7,390.4    SQYD 27.50 203,236.00 24.00 177,369.60 50.00 369,520.00    
302-02-G class ii base course (20" thick) 5,830.4    SQYD 76.85 448,066.24 65.00 378,976.00 100.00 583,040.00    
303-02 removal of existing patches 200.0    SQYD 25.00 5,000.00 30.00 6,000.00 20.00 4,000.00    
402-01 traffic maintenance aggregate (vehicular measurement) 800.0    CUYD 80.00 64,000.00 75.00 60,000.00 40.00 32,000.00    
502-01 superpave asphaltic concrete 49,508.5    TON 93.00 4,604,290.50 100.00 4,950,850.00 115.00 5,693,477.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
5,033.2    TON 150.00 754,980.00 120.00 603,984.00 150.00 754,980.00    
509-01-A cold planing asphaltic pavement (2" avg depth) 39,587      SQYD 1.85 73,235.95 2.50 98,967.50 4.00 158,348.00    
509-01-B cold planing asphaltic pavement (4" avg depth) 45,063      SQYD 4.05 182,505.15 3.50 157,720.50 5.00 225,315.00    
509-01-C cold planing asphaltic pavement (6" avg depth) 4,797      SQYD 9.00 43,173.00 5.00 23,985.00 9.00 43,173.00    
509-01-D cold planing asphaltic pavement (7" avg depth) 7,516      SQYD 10.00 75,160.00 6.00 45,096.00 10.00 75,160.00    
509-02 contractor retained reclaimed asphaltic pavement - 7,101      CUYD 0.00 0.00 0.00 0.00 0.00 0.00    
510-01-A pavement patching (6" minimum thickness) 1,300      SQYD 45.00 58,500.00 60.00 78,000.00 80.00 104,000.00    
602-02-A cleaning and resealing existing longitudinal pavement
joints
16,767      LNFT 1.55 25,988.85 2.00 33,534.00 1.50 25,150.50    
602-02-B cleaning and resealing existing transverse pavement
joints
17,569      LNFT 1.55 27,231.95 2.25 39,530.25 2.00 35,138.00    
602-03 cleaning and sealing random cracks 2,060      LNFT 3.00 6,180.00 4.00 8,240.00 3.00 6,180.00    
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
80.0    SQYD 290.00 23,200.00 350.00 28,000.00 300.00 24,000.00    
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
85.0    SQYD 285.00 24,225.00 300.00 25,500.00 285.00 24,225.00    
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
330.0    SQYD 260.00 85,800.00 250.00 82,500.00 235.00 77,550.00    
602-10 longitudinal shoulder joints 20,570      LNFT 1.10 22,627.00 2.00 41,140.00 1.70 34,969.00    
701-05-K side drain pipe (30") 56      LNFT 150.00 8,400.00 175.00 9,800.00 170.00 9,520.00    
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 160.00 1,280.00 200.00 1,600.00 170.00 1,360.00    
701-15 concrete collar 2      EACH 1,000.00 2,000.00 1,200.00 2,400.00 1,200.00 2,400.00    
702-04-B adjusting catch basins 6      EACH 1,700.00 10,200.00 2,000.00 12,000.00 1,900.00 11,400.00    
702-07-A cross drain safety end (type 1) 1      EACH 2,100.00 2,100.00 2,500.00 2,500.00 2,200.00 2,200.00    
702-07-B cross drain safety end (type 2) 2      EACH 4,500.00 9,000.00 5,500.00 11,000.00 4,800.00 9,600.00    
702-08-A side drain safety end (type 1) 13      EACH 2,100.00 27,300.00 2,500.00 32,500.00 2,300.00 29,900.00    
702-08-B side drain safety end (type 2) 3      EACH 4,700.00 14,100.00 5,500.00 16,500.00 5,000.00 15,000.00    
703-01 shoulder underdrain systems 26,770      LNFT 9.25 247,622.50 10.00 267,700.00 10.00 267,700.00    
703-02 shoulder outlet underdrains 106      EACH 625.00 66,250.00 500.00 53,000.00 650.00 68,900.00    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 481.5    LNFT 45.00 21,667.50 55.00 26,482.50 50.00 24,075.00    
704-03 blocked out guard rail 562.8    LNFT 20.00 11,256.00 25.00 14,070.00 20.00 11,256.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
4.0    LNFT 75.00 300.00 100.00 400.00 100.00 400.00    
704-11-B guard rail end treatment (tangent) 4      EACH 2,400.00 9,600.00 3,000.00 12,000.00 2,500.00 10,000.00    
704-11-C guard rail end treatment (bi-directional) 4      EACH 4,500.00 18,000.00 5,500.00 22,000.00 4,700.00 18,800.00    
706-01-A concrete walk (4" thick) 1,145.4    SQYD 60.00 68,724.00 70.00 80,178.00 65.00 74,451.00    
707-01-A concrete curb (mountable) 1,384.0    LNFT 12.00 16,608.00 12.00 16,608.00 10.00 13,840.00    
707-01-B concrete curb (6" barrier) 1,000.0    LNFT 15.00 15,000.00 16.00 16,000.00 14.00 14,000.00    
713-01 temporary signs & barricades lump      LUMP 285,000.00 285,000.00 750,000.00 750,000.00 600,000.00 600,000.00    
713-02-C temporary pavement markings (8" width) 6,802      LNFT 0.20 1,360.40 0.25 1,700.50 0.20 1,360.40    
713-02-E temporary pavement markings (24" width) 864      LNFT 0.50 432.00 0.60 518.40 0.50 432.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
25.436  MILE 400.00 10,174.40 550.00 13,989.80 600.00 15,261.60    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
25.436  MILE 350.00 8,902.60 400.00 10,174.40 300.00 7,630.80    
713-04-A temporary pavement markings (solid line)(4" width) 45.467  MILE 400.00 18,186.80 500.00 22,733.50 400.00 18,186.80    
713-05-A temporary pavement legends and symbols (arrow) 88      EACH 75.00 6,600.00 90.00 7,920.00 50.00 4,400.00    
713-05-C temporary pavement legends and symbols (only) 44      EACH 75.00 3,300.00 90.00 3,960.00 50.00 2,200.00    
713-05-D temporary pavement legends and symbols (rr crossing) 16      EACH 100.00 1,600.00 120.00 1,920.00 80.00 1,280.00    
722-02 project site laboratory (equipped) 1      EACH 50,000.00 50,000.00 50,000.00 50,000.00 10,000.00 10,000.00    
726-01 bedding material 84.7    CUYD 100.00 8,470.00 0.00 0.00 0.00 0.00    
727-01 mobilization lump      LUMP 900,000.00 900,000.00 500,000.00 500,000.00 800,000.00 800,000.00    
729-16-B object marker assembly (type 2) 10      EACH 65.00 650.00 60.00 600.00 70.00 700.00    
729-16-C object marker assembly (type 3) 9      EACH 75.00 675.00 100.00 900.00 80.00 720.00    
731-02 reflectorized raised pavement markers 1,395      EACH 5.50 7,672.50 6.50 9,067.50 6.00 8,370.00    
732-01-C plastic pavement striping (8" width) 2,267      LNFT 1.10 2,493.70 1.25 2,833.75 1.50 3,400.50    
732-01-E plastic pavement striping (24" width) 288      LNFT 4.50 1,296.00 5.50 1,584.00 5.00 1,440.00    
732-02-A plastic pavement striping (solid line) (4" width) 15.156  MILE 2,500.00 37,890.00 3,000.00 45,468.00 2,700.00 40,921.20    
732-03-A plastic pavement striping (broken line)(4" width) 8.524  MILE 850.00 7,245.40 1,000.00 8,524.00 900.00 7,671.60    
732-04-A plastic pavement legends & symbols (arrow) 44      EACH 225.00 9,900.00 250.00 11,000.00 250.00 11,000.00    
732-04-C plastic pavement legends & symbols (only) 22      EACH 225.00 4,950.00 280.00 6,160.00 250.00 5,500.00    
732-04-D plastic pavement legends & symbols (rr crossing) 8      EACH 425.00 3,400.00 500.00 4,000.00 500.00 4,000.00    
732-05 removal of existing markings 3.206  MILE 4,750.00 15,228.50 6,000.00 19,236.00 5,000.00 16,030.00    
734-01 rubblizing portland cement concrete pavement 57,552      SQYD 5.85 336,679.20 4.00 230,208.00 5.00 287,760.00    
735-01 mailboxes 22      EACH 1.00 22.00 2.00 44.00 5.00 110.00    
735-02 mailbox supports (single) 22      EACH 125.00 2,750.00 120.00 2,640.00 125.00 2,750.00    
736-01 trenching and backfilling 55      LNFT 4.50 247.50 5.00 275.00 5.00 275.00    
736-02 conduit with conductors (1" pec schedule 80, w/2 -
#14 awg conductors)
145      LNFT 2.00 290.00 2.50 362.50 3.00 435.00    
736-09 loop detector 263      LNFT 11.00 2,893.00 15.00 3,945.00 12.00 3,156.00    
736-10 underground junction box 2      EACH 550.00 1,100.00 650.00 1,300.00 600.00 1,200.00    
736-12-A conductor, 2c (loop lead-in,#14 awg) 335      LNFT 2.00 670.00 2.00 670.00 3.00 1,005.00    
739-01 hydro-seeding 5.95   ACRE 1,250.00 7,437.50 1,200.00 7,140.00 1,200.00 7,140.00    
740-01 construction layout lump      LUMP 150,000.00 150,000.00 100,000.00 100,000.00 600,000.00 600,000.00    
S-001 rumble strips (ground-in) 13.2    MILE 400.00 5,280.00 1,000.00 13,200.00 70.00 924.00    
S-002 dynamic message sign unit 4      EACH 15,500.00 62,000.00 35,000.00 140,000.00 12,000.00 48,000.00    
S-003 cleaning existing ditches 2,000      LNFT 10.00 20,000.00 12.00 24,000.00 15.00 30,000.00    
S-004 saw cutting of portland cement concrete pavement (10"
deep)
5,544      LNFT 10.00 55,440.00 8.00 44,352.00 15.00 83,160.00    
S-005 cleaning concrete curb 4,000      LNFT 5.00 20,000.00 5.00 20,000.00 5.00 20,000.00    
S-006 foreslope repair 878.9    SQYD 3.00 2,636.70 5.00 4,394.50 4.00 3,515.60    
S-007 pavement & base repair at rubblized pavement (20"
thick)
150.0    SQYD 80.00 12,000.00 150.00 22,500.00 150.00 22,500.00    
S-008 rap treated interlayer (4" thick) 45,936      SQYD 6.50 298,584.00 8.50 390,456.00 5.60 257,241.60    
S-009 asphalt emulsion for rap treated interlayer 55,123      GAL 5.25 289,395.75 3.50 192,930.50 5.60 308,688.80    
S-010 lime for rap treated interlayer 1,515.9    CWT 12.00 18,190.80 12.00 18,190.80 15.00 22,738.50    
S-011 saw cutting asphaltic concrete patches (6" deep) 5,280      LNFT 2.00 10,560.00 6.00 31,680.00 5.00 26,400.00    
                       
 CONTRACTOR TOTAL       10,278,439.89   10,577,218.70   12,738,808.40    