| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
4,800   |
SQYD |
10.00 |
48,000.00 |
25.00 |
120,000.00 |
20.00 |
96,000.00 |
|
|
| 202-02-D |
removal of concrete walks and drives
|
1,145   |
SQYD |
15.00 |
17,175.00 |
15.00 |
17,175.00 |
20.00 |
22,900.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
384.0 |
LNFT |
10.00 |
3,840.00 |
6.00 |
2,304.00 |
10.00 |
3,840.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,455.1 |
SQYD |
10.00 |
44,551.00 |
8.00 |
35,640.80 |
20.00 |
89,102.00 |
|
|
| 202-02-H |
removal of guard rail
|
101   |
LNFT |
10.00 |
1,010.00 |
10.00 |
1,010.00 |
10.00 |
1,010.00 |
|
|
| 202-02-I |
removal of stabilized base (6" thick)
|
4,800.0 |
SQYD |
8.00 |
38,400.00 |
6.00 |
28,800.00 |
25.00 |
120,000.00 |
|
|
| 202-02-J |
removal of concrete headwalls and wingwalls
|
7   |
EACH |
800.00 |
5,600.00 |
1,000.00 |
7,000.00 |
1,200.00 |
8,400.00 |
|
|
| 202-02-K |
removal of catch basins
|
2   |
EACH |
750.00 |
1,500.00 |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
|
|
| 202-02-L |
removal of side drain pipe (24" rcp)
|
56   |
LNFT |
5.00 |
280.00 |
10.00 |
560.00 |
20.00 |
1,120.00 |
|
|
| 203-01 |
general excavation
|
1,343   |
CUYD |
10.00 |
13,430.00 |
25.00 |
33,575.00 |
20.00 |
26,860.00 |
|
|
| 203-02 |
drainage excavation
|
400   |
CUYD |
10.00 |
4,000.00 |
15.00 |
6,000.00 |
20.00 |
8,000.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,243   |
CUYD |
20.00 |
84,860.00 |
25.00 |
106,075.00 |
30.00 |
127,290.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
343   |
EACH |
10.00 |
3,430.00 |
25.00 |
8,575.00 |
10.00 |
3,430.00 |
|
|
| 204-06 |
temporary silt fencing
|
43,162   |
LNFT |
1.25 |
53,952.50 |
1.20 |
51,794.40 |
2.00 |
86,324.00 |
|
|
| 302-02-B |
class ii base course (6" thick)
|
7,390.4 |
SQYD |
27.50 |
203,236.00 |
24.00 |
177,369.60 |
50.00 |
369,520.00 |
|
|
| 302-02-G |
class ii base course (20" thick)
|
5,830.4 |
SQYD |
76.85 |
448,066.24 |
65.00 |
378,976.00 |
100.00 |
583,040.00 |
|
|
| 303-02 |
removal of existing patches
|
200.0 |
SQYD |
25.00 |
5,000.00 |
30.00 |
6,000.00 |
20.00 |
4,000.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
800.0 |
CUYD |
80.00 |
64,000.00 |
75.00 |
60,000.00 |
40.00 |
32,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
49,508.5 |
TON |
93.00 |
4,604,290.50 |
100.00 |
4,950,850.00 |
115.00 |
5,693,477.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
5,033.2 |
TON |
150.00 |
754,980.00 |
120.00 |
603,984.00 |
150.00 |
754,980.00 |
|
|
| 509-01-A |
cold planing asphaltic pavement (2" avg depth)
|
39,587   |
SQYD |
1.85 |
73,235.95 |
2.50 |
98,967.50 |
4.00 |
158,348.00 |
|
|
| 509-01-B |
cold planing asphaltic pavement (4" avg depth)
|
45,063   |
SQYD |
4.05 |
182,505.15 |
3.50 |
157,720.50 |
5.00 |
225,315.00 |
|
|
| 509-01-C |
cold planing asphaltic pavement (6" avg depth)
|
4,797   |
SQYD |
9.00 |
43,173.00 |
5.00 |
23,985.00 |
9.00 |
43,173.00 |
|
|
| 509-01-D |
cold planing asphaltic pavement (7" avg depth)
|
7,516   |
SQYD |
10.00 |
75,160.00 |
6.00 |
45,096.00 |
10.00 |
75,160.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 7,101   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
1,300   |
SQYD |
45.00 |
58,500.00 |
60.00 |
78,000.00 |
80.00 |
104,000.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
16,767   |
LNFT |
1.55 |
25,988.85 |
2.00 |
33,534.00 |
1.50 |
25,150.50 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
17,569   |
LNFT |
1.55 |
27,231.95 |
2.25 |
39,530.25 |
2.00 |
35,138.00 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
2,060   |
LNFT |
3.00 |
6,180.00 |
4.00 |
8,240.00 |
3.00 |
6,180.00 |
|
|
| 602-05-K-01 |
full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under) |
80.0 |
SQYD |
290.00 |
23,200.00 |
350.00 |
28,000.00 |
300.00 |
24,000.00 |
|
|
| 602-05-K-02 |
full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds) |
85.0 |
SQYD |
285.00 |
24,225.00 |
300.00 |
25,500.00 |
285.00 |
24,225.00 |
|
|
| 602-05-K-03 |
full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over) |
330.0 |
SQYD |
260.00 |
85,800.00 |
250.00 |
82,500.00 |
235.00 |
77,550.00 |
|
|
| 602-10 |
longitudinal shoulder joints
|
20,570   |
LNFT |
1.10 |
22,627.00 |
2.00 |
41,140.00 |
1.70 |
34,969.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
56   |
LNFT |
150.00 |
8,400.00 |
175.00 |
9,800.00 |
170.00 |
9,520.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
160.00 |
1,280.00 |
200.00 |
1,600.00 |
170.00 |
1,360.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
|
|
| 702-04-B |
adjusting catch basins
|
6   |
EACH |
1,700.00 |
10,200.00 |
2,000.00 |
12,000.00 |
1,900.00 |
11,400.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
1   |
EACH |
2,100.00 |
2,100.00 |
2,500.00 |
2,500.00 |
2,200.00 |
2,200.00 |
|
|
| 702-07-B |
cross drain safety end (type 2)
|
2   |
EACH |
4,500.00 |
9,000.00 |
5,500.00 |
11,000.00 |
4,800.00 |
9,600.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
13   |
EACH |
2,100.00 |
27,300.00 |
2,500.00 |
32,500.00 |
2,300.00 |
29,900.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
3   |
EACH |
4,700.00 |
14,100.00 |
5,500.00 |
16,500.00 |
5,000.00 |
15,000.00 |
|
|
| 703-01 |
shoulder underdrain systems
|
26,770   |
LNFT |
9.25 |
247,622.50 |
10.00 |
267,700.00 |
10.00 |
267,700.00 |
|
|
| 703-02 |
shoulder outlet underdrains
|
106   |
EACH |
625.00 |
66,250.00 |
500.00 |
53,000.00 |
650.00 |
68,900.00 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
481.5 |
LNFT |
45.00 |
21,667.50 |
55.00 |
26,482.50 |
50.00 |
24,075.00 |
|
|
| 704-03 |
blocked out guard rail
|
562.8 |
LNFT |
20.00 |
11,256.00 |
25.00 |
14,070.00 |
20.00 |
11,256.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
4.0 |
LNFT |
75.00 |
300.00 |
100.00 |
400.00 |
100.00 |
400.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,400.00 |
9,600.00 |
3,000.00 |
12,000.00 |
2,500.00 |
10,000.00 |
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
4   |
EACH |
4,500.00 |
18,000.00 |
5,500.00 |
22,000.00 |
4,700.00 |
18,800.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,145.4 |
SQYD |
60.00 |
68,724.00 |
70.00 |
80,178.00 |
65.00 |
74,451.00 |
|
|
| 707-01-A |
concrete curb (mountable)
|
1,384.0 |
LNFT |
12.00 |
16,608.00 |
12.00 |
16,608.00 |
10.00 |
13,840.00 |
|
|
| 707-01-B |
concrete curb (6" barrier)
|
1,000.0 |
LNFT |
15.00 |
15,000.00 |
16.00 |
16,000.00 |
14.00 |
14,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
285,000.00 |
285,000.00 |
750,000.00 |
750,000.00 |
600,000.00 |
600,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
6,802   |
LNFT |
0.20 |
1,360.40 |
0.25 |
1,700.50 |
0.20 |
1,360.40 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
864   |
LNFT |
0.50 |
432.00 |
0.60 |
518.40 |
0.50 |
432.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
25.436 |
MILE |
400.00 |
10,174.40 |
550.00 |
13,989.80 |
600.00 |
15,261.60 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
25.436 |
MILE |
350.00 |
8,902.60 |
400.00 |
10,174.40 |
300.00 |
7,630.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
45.467 |
MILE |
400.00 |
18,186.80 |
500.00 |
22,733.50 |
400.00 |
18,186.80 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
88   |
EACH |
75.00 |
6,600.00 |
90.00 |
7,920.00 |
50.00 |
4,400.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
44   |
EACH |
75.00 |
3,300.00 |
90.00 |
3,960.00 |
50.00 |
2,200.00 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
16   |
EACH |
100.00 |
1,600.00 |
120.00 |
1,920.00 |
80.00 |
1,280.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
|
|
| 726-01 |
bedding material
|
84.7 |
CUYD |
100.00 |
8,470.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
900,000.00 |
900,000.00 |
500,000.00 |
500,000.00 |
800,000.00 |
800,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
65.00 |
650.00 |
60.00 |
600.00 |
70.00 |
700.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
9   |
EACH |
75.00 |
675.00 |
100.00 |
900.00 |
80.00 |
720.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,395   |
EACH |
5.50 |
7,672.50 |
6.50 |
9,067.50 |
6.00 |
8,370.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,267   |
LNFT |
1.10 |
2,493.70 |
1.25 |
2,833.75 |
1.50 |
3,400.50 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
288   |
LNFT |
4.50 |
1,296.00 |
5.50 |
1,584.00 |
5.00 |
1,440.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.156 |
MILE |
2,500.00 |
37,890.00 |
3,000.00 |
45,468.00 |
2,700.00 |
40,921.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.524 |
MILE |
850.00 |
7,245.40 |
1,000.00 |
8,524.00 |
900.00 |
7,671.60 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
44   |
EACH |
225.00 |
9,900.00 |
250.00 |
11,000.00 |
250.00 |
11,000.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
22   |
EACH |
225.00 |
4,950.00 |
280.00 |
6,160.00 |
250.00 |
5,500.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
8   |
EACH |
425.00 |
3,400.00 |
500.00 |
4,000.00 |
500.00 |
4,000.00 |
|
|
| 732-05 |
removal of existing markings
|
3.206 |
MILE |
4,750.00 |
15,228.50 |
6,000.00 |
19,236.00 |
5,000.00 |
16,030.00 |
|
|
| 734-01 |
rubblizing portland cement concrete pavement
|
57,552   |
SQYD |
5.85 |
336,679.20 |
4.00 |
230,208.00 |
5.00 |
287,760.00 |
|
|
| 735-01 |
mailboxes
|
22   |
EACH |
1.00 |
22.00 |
2.00 |
44.00 |
5.00 |
110.00 |
|
|
| 735-02 |
mailbox supports (single)
|
22   |
EACH |
125.00 |
2,750.00 |
120.00 |
2,640.00 |
125.00 |
2,750.00 |
|
|
| 736-01 |
trenching and backfilling
|
55   |
LNFT |
4.50 |
247.50 |
5.00 |
275.00 |
5.00 |
275.00 |
|
|
| 736-02 |
conduit with conductors (1" pec schedule 80, w/2 -
#14 awg conductors) |
145   |
LNFT |
2.00 |
290.00 |
2.50 |
362.50 |
3.00 |
435.00 |
|
|
| 736-09 |
loop detector
|
263   |
LNFT |
11.00 |
2,893.00 |
15.00 |
3,945.00 |
12.00 |
3,156.00 |
|
|
| 736-10 |
underground junction box
|
2   |
EACH |
550.00 |
1,100.00 |
650.00 |
1,300.00 |
600.00 |
1,200.00 |
|
|
| 736-12-A |
conductor, 2c (loop lead-in,#14 awg)
|
335   |
LNFT |
2.00 |
670.00 |
2.00 |
670.00 |
3.00 |
1,005.00 |
|
|
| 739-01 |
hydro-seeding
|
5.95 |
ACRE |
1,250.00 |
7,437.50 |
1,200.00 |
7,140.00 |
1,200.00 |
7,140.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
150,000.00 |
150,000.00 |
100,000.00 |
100,000.00 |
600,000.00 |
600,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
13.2 |
MILE |
400.00 |
5,280.00 |
1,000.00 |
13,200.00 |
70.00 |
924.00 |
|
|
| S-002 |
dynamic message sign unit
|
4   |
EACH |
15,500.00 |
62,000.00 |
35,000.00 |
140,000.00 |
12,000.00 |
48,000.00 |
|
|
| S-003 |
cleaning existing ditches
|
2,000   |
LNFT |
10.00 |
20,000.00 |
12.00 |
24,000.00 |
15.00 |
30,000.00 |
|
|
| S-004 |
saw cutting of portland cement concrete pavement (10"
deep) |
5,544   |
LNFT |
10.00 |
55,440.00 |
8.00 |
44,352.00 |
15.00 |
83,160.00 |
|
|
| S-005 |
cleaning concrete curb
|
4,000   |
LNFT |
5.00 |
20,000.00 |
5.00 |
20,000.00 |
5.00 |
20,000.00 |
|
|
| S-006 |
foreslope repair
|
878.9 |
SQYD |
3.00 |
2,636.70 |
5.00 |
4,394.50 |
4.00 |
3,515.60 |
|
|
| S-007 |
pavement & base repair at rubblized pavement (20"
thick) |
150.0 |
SQYD |
80.00 |
12,000.00 |
150.00 |
22,500.00 |
150.00 |
22,500.00 |
|
|
| S-008 |
rap treated interlayer (4" thick)
|
45,936   |
SQYD |
6.50 |
298,584.00 |
8.50 |
390,456.00 |
5.60 |
257,241.60 |
|
|
| S-009 |
asphalt emulsion for rap treated interlayer
|
55,123   |
GAL |
5.25 |
289,395.75 |
3.50 |
192,930.50 |
5.60 |
308,688.80 |
|
|
| S-010 |
lime for rap treated interlayer
|
1,515.9 |
CWT |
12.00 |
18,190.80 |
12.00 |
18,190.80 |
15.00 |
22,738.50 |
|
|
| S-011 |
saw cutting asphaltic concrete patches (6" deep)
|
5,280   |
LNFT |
2.00 |
10,560.00 |
6.00 |
31,680.00 |
5.00 |
26,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
10,278,439.89 |
|
10,577,218.70 |
|
12,738,808.40 |
|
|
|