Lead Project: 853-18-0006
Parish: TANGIPAHOA
Routes: LA 1054
Description: JCT.LA 10 - JCT. LA 1058
Type Const: cold planing asphaltic concrete, in-place cement treated base course, pavement widending,
superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $2,236,307.42
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,432,523.69
2 06276 BARRIERE CONSTRUCTION CO., LLC. $1,532,227.47
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 830      LNFT 7.50 6,225.00 7.00 5,810.00        
203-07 borrow (vehicular measurement) 1,121      CUYD 15.00 16,815.00 5.00 5,605.00        
203-07-A borrow (vehicular meas.)(selected soils) 4,740      CUYD 9.00 42,660.00 5.00 23,700.00        
204-02 temporary hay or straw bales 50      EACH 30.00 1,500.00 16.00 800.00        
204-06 temporary silt fencing 17,290      LNFT 2.00 34,580.00 1.00 17,290.00        
303-02 removal of existing patches 1,200      SQYD 7.00 8,400.00 1.00 1,200.00        
308-01-A in-place cement treated base course (12" thick) 58,570      SQYD 5.25 307,492.50 4.75 278,207.50        
402-01 traffic maintenance aggregate (vehicular measurement) 200.0    CUYD 15.00 3,000.00 5.00 1,000.00        
502-01 superpave asphaltic concrete 11,084.5    TON 64.00 709,408.00 80.00 886,760.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,125.4    TON 1.00 1,125.40 1.00 1,125.40        
509-01 cold planing asphaltic pavement 18,740      SQYD 2.00 37,480.00 2.00 37,480.00        
509-02 contractor retained reclaimed asphaltic pavement - 781      CUYD 0.10 - 78.10 20.00 - 15,620.00        
510-02 pavement widening (8" thick) 441.3    SQYD 30.00 13,239.00 35.00 15,445.50        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 100.0    LNFT 36.00 3,600.00 53.00 5,300.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 610.0    LNFT 57.00 34,770.00 47.00 28,670.00        
704-03 blocked out guard rail 150.0    LNFT 21.00 3,150.00 21.00 3,150.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,375.00 9,500.00 2,300.00 9,200.00        
713-01 temporary signs & barricades lump      LUMP 9,000.00 9,000.00 46,400.00 46,400.00        
713-02-E temporary pavement markings (24" width) 66      LNFT 1.00 66.00 0.10 6.60        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
12.120  MILE 147.00 1,781.64 1.00 12.12        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.190  MILE 1.00 5.19 1.00 5.19        
713-04-A temporary pavement markings (solid line)(4" width) 41.610  MILE 1.00 41.61 1.00 41.61        
717-01 seeding 294      LB 11.00 3,234.00 5.00 1,470.00        
718-01 fertilizer 9,794      LB 0.56 5,484.64 0.25 2,448.50        
722-01 project site laboratory 1      EACH 2,000.07 2,000.07 500.00 500.00        
727-01 mobilization lump      LUMP 110,500.00 110,500.00 116,500.00 116,500.00        
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 100.00 400.00        
731-02 reflectorized raised pavement markers 1,463      EACH 5.00 7,315.00 5.25 7,680.75        
732-01-E plastic pavement striping (24" width) 22      LNFT 3.25 71.50 4.40 96.80        
732-02-A plastic pavement striping (solid line) (4" width) 13.870  MILE 2,600.00 36,062.00 2,200.00 30,514.00        
732-03-A plastic pavement striping (broken line)(4" width) 1.730  MILE 650.00 1,124.50 850.00 1,470.50        
735-01 mailboxes 43      EACH 1.18 50.74 1.00 43.00        
735-02 mailbox supports (single) 43      EACH 140.00 6,020.00 105.00 4,515.00        
740-01 construction layout lump      LUMP 16,600.00 16,600.00 15,000.00 15,000.00        
                       
 CONTRACTOR TOTAL       1,432,523.69   1,532,227.47        