| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - MERRICK CONSTRUCTION CO. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - PROGRESSIVE CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
28,000.00 |
28,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,500.00 |
3,500.00 |
7,000.00 |
7,000.00 |
2,500.00 |
2,500.00 |
14,000.00 |
14,000.00 |
| 202-02-C |
removal of asphalt drives
|
38   |
SQYD |
25.00 |
950.00 |
3.50 |
133.00 |
25.00 |
950.00 |
9.00 |
342.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,289   |
SQYD |
17.00 |
21,913.00 |
3.50 |
4,511.50 |
8.00 |
10,312.00 |
9.00 |
11,601.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
7,160.5 |
SQYD |
3.00 |
21,481.50 |
10.00 |
71,605.00 |
4.75 |
34,012.38 |
4.35 |
31,148.18 |
| 202-02-01 |
removal of existing trunklines
|
26   |
EACH |
17.00 |
442.00 |
7.00 |
182.00 |
200.00 |
5,200.00 |
35.00 |
910.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
95,000.00 |
95,000.00 |
60,000.00 |
60,000.00 |
100,000.00 |
100,000.00 |
219,000.00 |
219,000.00 |
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
120.00 |
1,200.00 |
5.00 |
50.00 |
25.00 |
250.00 |
18.00 |
180.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
66   |
EACH |
255.00 |
16,830.00 |
53.00 |
3,498.00 |
250.00 |
16,500.00 |
118.00 |
7,788.00 |
| 204-06 |
temporary silt fencing
|
6,000   |
LNFT |
4.00 |
24,000.00 |
2.50 |
15,000.00 |
1.75 |
10,500.00 |
2.50 |
15,000.00 |
| 302-02-D |
class ii base course (8 1/2" thick)
|
11,872.9 |
SQYD |
22.00 |
261,203.80 |
20.00 |
237,458.00 |
20.00 |
237,458.00 |
24.00 |
284,949.60 |
| 304-01 |
lime
|
33.66 |
TON |
1.00 |
33.66 |
250.00 |
8,415.00 |
200.00 |
6,732.00 |
300.00 |
10,098.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
436   |
CUYD |
21.00 |
9,156.00 |
80.00 |
34,880.00 |
90.00 |
39,240.00 |
91.00 |
39,676.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
16.00 |
8,000.00 |
75.00 |
37,500.00 |
80.00 |
40,000.00 |
91.00 |
45,500.00 |
| 502-01 |
superpave asphaltic concrete
|
2,147.8 |
TON |
85.00 |
182,563.00 |
120.00 |
257,736.00 |
95.00 |
204,041.00 |
95.00 |
204,041.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
91.8 |
TON |
185.00 |
16,983.00 |
120.00 |
11,016.00 |
250.00 |
22,950.00 |
210.00 |
19,278.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
88   |
LNFT |
82.00 |
7,216.00 |
40.00 |
3,520.00 |
105.00 |
9,240.00 |
72.00 |
6,336.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
80   |
LNFT |
92.00 |
7,360.00 |
65.00 |
5,200.00 |
115.00 |
9,200.00 |
90.00 |
7,200.00 |
| 701-05-G |
side drain pipe (18")
|
160   |
LNFT |
57.00 |
9,120.00 |
40.00 |
6,400.00 |
57.00 |
9,120.00 |
54.50 |
8,720.00 |
| 701-05-I |
side drain pipe (24")
|
240   |
LNFT |
72.00 |
17,280.00 |
65.00 |
15,600.00 |
65.00 |
15,600.00 |
70.50 |
16,920.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
24   |
LNFT |
127.00 |
3,048.00 |
65.00 |
1,560.00 |
185.00 |
4,440.00 |
150.00 |
3,600.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
24   |
LNFT |
140.00 |
3,360.00 |
85.00 |
2,040.00 |
300.00 |
7,200.00 |
160.00 |
3,840.00 |
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
16   |
LNFT |
240.00 |
3,840.00 |
200.00 |
3,200.00 |
350.00 |
5,600.00 |
200.00 |
3,200.00 |
| 701-15 |
concrete collar
|
3   |
EACH |
775.00 |
2,325.00 |
500.00 |
1,500.00 |
1,600.00 |
4,800.00 |
950.00 |
2,850.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,600.00 |
2,600.00 |
3,500.00 |
3,500.00 |
3,700.00 |
3,700.00 |
6,500.00 |
6,500.00 |
| 705-01 |
barbed wire fence
|
140   |
LNFT |
16.00 |
2,240.00 |
7.00 |
980.00 |
17.00 |
2,380.00 |
17.50 |
2,450.00 |
| 706-02-C |
concrete drive (6" thick)
|
1,059.1 |
SQYD |
65.00 |
68,841.50 |
35.00 |
37,068.50 |
65.00 |
68,841.50 |
59.00 |
62,486.90 |
| 708-01 |
right-of-way monument
|
6   |
EACH |
145.00 |
870.00 |
30.00 |
180.00 |
350.00 |
2,100.00 |
150.00 |
900.00 |
| 708-02 |
right-of-way monument witness post
|
6   |
EACH |
52.00 |
312.00 |
75.00 |
450.00 |
350.00 |
2,100.00 |
150.00 |
900.00 |
| 711-01-C |
riprap (30 lb, 14" thickness)
|
60   |
SQYD |
105.00 |
6,300.00 |
30.00 |
1,800.00 |
88.00 |
5,280.00 |
65.00 |
3,900.00 |
| 711-04 |
geotextile fabric
|
60   |
SQYD |
3.25 |
195.00 |
1.50 |
90.00 |
2.50 |
150.00 |
4.00 |
240.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
16,000.00 |
16,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
1,776   |
LNFT |
0.21 |
372.96 |
0.30 |
532.80 |
0.50 |
888.00 |
0.25 |
444.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
1,338   |
LNFT |
0.82 |
1,097.16 |
0.90 |
1,204.20 |
1.00 |
1,338.00 |
0.95 |
1,271.10 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.526 |
MILE |
150.00 |
978.90 |
350.00 |
2,284.10 |
330.00 |
2,153.58 |
1,550.00 |
10,115.30 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.526 |
MILE |
610.00 |
3,980.86 |
650.00 |
4,241.90 |
585.00 |
3,817.71 |
706.00 |
4,607.36 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
52.00 |
312.00 |
65.00 |
390.00 |
115.00 |
690.00 |
59.00 |
354.00 |
| 713-05-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
52.00 |
312.00 |
65.00 |
390.00 |
115.00 |
690.00 |
59.00 |
354.00 |
| 716-01-A |
mulch (vegetative)
|
14.0 |
TON |
475.00 |
6,650.00 |
1,000.00 |
14,000.00 |
500.00 |
7,000.00 |
529.00 |
7,406.00 |
| 717-01 |
seeding
|
560   |
LB |
9.00 |
5,040.00 |
12.00 |
6,720.00 |
10.00 |
5,600.00 |
10.00 |
5,600.00 |
| 718-01 |
fertilizer
|
7,000   |
LB |
0.45 |
3,150.00 |
0.80 |
5,600.00 |
0.50 |
3,500.00 |
0.50 |
3,500.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
900   |
SQYD |
1.65 |
1,485.00 |
1.30 |
1,170.00 |
1.75 |
1,575.00 |
1.75 |
1,575.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
2,300   |
SQYD |
2.10 |
4,830.00 |
1.75 |
4,025.00 |
2.25 |
5,175.00 |
2.35 |
5,405.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
2,700   |
SQYD |
2.30 |
6,210.00 |
2.25 |
6,075.00 |
2.50 |
6,750.00 |
2.60 |
7,020.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
7,000.00 |
7,000.00 |
2,400.00 |
2,400.00 |
10,000.00 |
10,000.00 |
8,500.00 |
8,500.00 |
| 726-01 |
bedding material
|
91.9 |
CUYD |
115.00 |
10,568.50 |
40.00 |
3,676.00 |
100.00 |
9,190.00 |
86.50 |
7,949.35 |
| 727-01 |
mobilization
|
lump |
LUMP |
59,500.00 |
59,500.00 |
52,000.00 |
52,000.00 |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
6   |
EACH |
105.00 |
630.00 |
50.00 |
300.00 |
85.00 |
510.00 |
100.00 |
600.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,605   |
EACH |
5.00 |
8,025.00 |
4.25 |
6,821.25 |
6.00 |
9,630.00 |
5.30 |
8,506.50 |
| 732-01-C |
plastic pavement striping (8" width)
|
888   |
LNFT |
1.10 |
976.80 |
1.25 |
1,110.00 |
1.00 |
888.00 |
1.20 |
1,065.60 |
| 732-01-E |
plastic pavement striping (24" width)
|
669   |
LNFT |
3.25 |
2,174.25 |
3.00 |
2,007.00 |
5.00 |
3,345.00 |
3.50 |
2,341.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.263 |
MILE |
2,600.00 |
8,483.80 |
2,750.00 |
8,973.25 |
2,700.00 |
8,810.10 |
2,950.00 |
9,625.85 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
265.00 |
795.00 |
300.00 |
900.00 |
235.00 |
705.00 |
294.00 |
882.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
265.00 |
795.00 |
300.00 |
900.00 |
235.00 |
705.00 |
294.00 |
882.00 |
| 735-01 |
mailboxes
|
11   |
EACH |
1.10 |
12.10 |
5.00 |
55.00 |
1.50 |
16.50 |
13.00 |
143.00 |
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
165.00 |
1,815.00 |
135.00 |
1,485.00 |
140.00 |
1,540.00 |
118.00 |
1,298.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
34,000.00 |
34,000.00 |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
4,500.00 |
4,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,011,357.79 |
|
1,034,333.50 |
|
1,139,913.77 |
|
1,217,500.24 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - T.L. CONSTRUCTION INC |
- 6 - GERACE CONSTRUCTION LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| 202-02-C |
removal of asphalt drives
|
38   |
SQYD |
33.00 |
1,254.00 |
45.00 |
1,710.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,289   |
SQYD |
12.00 |
15,468.00 |
10.00 |
12,890.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
7,160.5 |
SQYD |
12.00 |
85,926.00 |
7.00 |
50,123.50 |
|
|
|
|
| 202-02-01 |
removal of existing trunklines
|
26   |
EACH |
50.00 |
1,300.00 |
25.00 |
650.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
175,000.00 |
175,000.00 |
115,000.00 |
115,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
15.00 |
150.00 |
75.00 |
750.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
66   |
EACH |
125.00 |
8,250.00 |
60.00 |
3,960.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
6,000   |
LNFT |
1.80 |
10,800.00 |
2.00 |
12,000.00 |
|
|
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
11,872.9 |
SQYD |
25.00 |
296,822.50 |
26.00 |
308,695.40 |
|
|
|
|
| 304-01 |
lime
|
33.66 |
TON |
550.00 |
18,513.00 |
310.00 |
10,434.60 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
436   |
CUYD |
50.00 |
21,800.00 |
105.00 |
45,780.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
55.00 |
27,500.00 |
75.00 |
37,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,147.8 |
TON |
105.00 |
225,519.00 |
135.00 |
289,953.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
91.8 |
TON |
250.00 |
22,950.00 |
215.00 |
19,737.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
88   |
LNFT |
63.00 |
5,544.00 |
75.00 |
6,600.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
80   |
LNFT |
83.00 |
6,640.00 |
85.00 |
6,800.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
160   |
LNFT |
63.00 |
10,080.00 |
70.00 |
11,200.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
240   |
LNFT |
88.00 |
21,120.00 |
80.00 |
19,200.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
24   |
LNFT |
135.00 |
3,240.00 |
110.00 |
2,640.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
24   |
LNFT |
190.00 |
4,560.00 |
115.00 |
2,760.00 |
|
|
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
16   |
LNFT |
270.00 |
4,320.00 |
205.00 |
3,280.00 |
|
|
|
|
| 701-15 |
concrete collar
|
3   |
EACH |
750.00 |
2,250.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,000.00 |
3,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
140   |
LNFT |
18.00 |
2,520.00 |
8.00 |
1,120.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,059.1 |
SQYD |
60.00 |
63,546.00 |
50.00 |
52,955.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
6   |
EACH |
200.00 |
1,200.00 |
100.00 |
600.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
6   |
EACH |
200.00 |
1,200.00 |
100.00 |
600.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thickness)
|
60   |
SQYD |
75.00 |
4,500.00 |
30.00 |
1,800.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
60   |
SQYD |
9.00 |
540.00 |
5.75 |
345.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
1,776   |
LNFT |
0.25 |
444.00 |
0.25 |
444.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
1,338   |
LNFT |
1.00 |
1,338.00 |
1.00 |
1,338.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.526 |
MILE |
750.00 |
4,894.50 |
700.00 |
4,568.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.526 |
MILE |
750.00 |
4,894.50 |
700.00 |
4,568.20 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
75.00 |
450.00 |
60.00 |
360.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
75.00 |
450.00 |
60.00 |
360.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
14.0 |
TON |
560.00 |
7,840.00 |
550.00 |
7,700.00 |
|
|
|
|
| 717-01 |
seeding
|
560   |
LB |
11.00 |
6,160.00 |
8.50 |
4,760.00 |
|
|
|
|
| 718-01 |
fertilizer
|
7,000   |
LB |
0.50 |
3,500.00 |
0.60 |
4,200.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
900   |
SQYD |
2.00 |
1,800.00 |
1.50 |
1,350.00 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
2,300   |
SQYD |
2.50 |
5,750.00 |
2.00 |
4,600.00 |
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
2,700   |
SQYD |
2.75 |
7,425.00 |
3.75 |
10,125.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
12,000.00 |
12,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
91.9 |
CUYD |
70.00 |
6,433.00 |
95.00 |
8,730.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
6   |
EACH |
100.00 |
600.00 |
95.00 |
570.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,605   |
EACH |
5.50 |
8,827.50 |
5.25 |
8,426.25 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
888   |
LNFT |
1.25 |
1,110.00 |
1.00 |
888.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
669   |
LNFT |
3.75 |
2,508.75 |
3.50 |
2,341.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.263 |
MILE |
3,100.00 |
10,115.30 |
2,750.00 |
8,973.25 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
313.00 |
939.00 |
275.00 |
825.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
313.00 |
939.00 |
275.00 |
825.00 |
|
|
|
|
| 735-01 |
mailboxes
|
11   |
EACH |
5.00 |
55.00 |
35.00 |
385.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
11   |
EACH |
140.00 |
1,540.00 |
150.00 |
1,650.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,265,526.05 |
|
1,296,571.40 |
|
|
|
|
|