| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. J. BURNELL, INC. |
- 2 - S.F.C. CONTRACT SERVICES, INC. |
- 3 - SPECIALTY TRACKHOE & DOZER SERV.INC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
103   |
SQYD |
10.00 |
1,030.00 |
15.00 |
1,545.00 |
8.00 |
824.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
331.0 |
LNFT |
1.00 |
331.00 |
10.00 |
3,310.00 |
10.00 |
3,310.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
40.0 |
SQYD |
20.00 |
800.00 |
15.00 |
600.00 |
25.00 |
1,000.00 |
|
|
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
LUMP |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
|
|
| 203-01 |
general excavation
|
643   |
CUYD |
10.00 |
6,430.00 |
10.00 |
6,430.00 |
12.00 |
7,716.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)(crushed stone or
recycled p.c.c. paveme nt |
530.3 |
SQYD |
20.00 |
10,606.00 |
13.00 |
6,893.90 |
20.15 |
10,685.55 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
530.3 |
SQYD |
65.00 |
34,469.50 |
83.00 |
44,014.90 |
80.00 |
42,424.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
10   |
LNFT |
200.00 |
2,000.00 |
80.00 |
800.00 |
120.00 |
1,200.00 |
|
|
| 702-03-C |
catch basin (cb-06)
|
1   |
EACH |
5,000.00 |
5,000.00 |
4,700.00 |
4,700.00 |
6,000.00 |
6,000.00 |
|
|
| 702-03-G |
catch basin (cb-09)
|
1   |
EACH |
5,000.00 |
5,000.00 |
4,700.00 |
4,700.00 |
7,000.00 |
7,000.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
42.5 |
SQYD |
50.00 |
2,125.00 |
65.00 |
2,762.50 |
85.00 |
3,612.50 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
81.5 |
SQYD |
48.00 |
3,912.00 |
56.00 |
4,564.00 |
85.00 |
6,927.50 |
|
|
| 707-01 |
concrete curb
|
546.0 |
LNFT |
7.00 |
3,822.00 |
13.00 |
7,098.00 |
9.00 |
4,914.00 |
|
|
| 708-01 |
right-of-way monument
|
3   |
EACH |
300.00 |
900.00 |
300.00 |
900.00 |
250.00 |
750.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
3   |
EACH |
300.00 |
900.00 |
300.00 |
900.00 |
175.00 |
525.00 |
|
|
| 713-01 |
temporary signs and barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
17,500.00 |
17,500.00 |
20,000.00 |
20,000.00 |
|
|
| 714-01 |
slab sodding
|
257   |
SQYD |
4.00 |
1,028.00 |
9.00 |
2,313.00 |
7.00 |
1,799.00 |
|
|
| 726-01 |
bedding material
|
5.3 |
CUYD |
150.00 |
795.00 |
20.00 |
106.00 |
150.00 |
795.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
28,500.00 |
28,500.00 |
33,000.00 |
33,000.00 |
|
|
| 729-01 |
sign (type a)
|
29.0 |
SQFT |
66.00 |
1,914.00 |
75.00 |
2,175.00 |
100.00 |
2,900.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
127   |
LNFT |
5.50 |
698.50 |
6.00 |
762.00 |
5.50 |
698.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.088 |
MILE |
7,000.00 |
616.00 |
5,300.00 |
466.40 |
5,800.00 |
510.40 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.047 |
MILE |
7,000.00 |
329.00 |
6,000.00 |
282.00 |
6,600.00 |
310.20 |
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.028 |
MILE |
7,000.00 |
196.00 |
6,000.00 |
168.00 |
6,600.00 |
184.80 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
275.00 |
275.00 |
300.00 |
300.00 |
275.00 |
275.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
275.00 |
275.00 |
300.00 |
300.00 |
275.00 |
275.00 |
|
|
| 732-05 |
removal of existing markings
|
0.068 |
MILE |
7,000.00 |
476.00 |
6,000.00 |
408.00 |
6,600.00 |
448.80 |
|
|
| 736-01 |
trenching and backfilling
|
445   |
LNFT |
4.50 |
2,002.50 |
4.00 |
1,780.00 |
3.00 |
1,335.00 |
|
|
| 736-03-A |
jacked or bored conduit (1" sch. 80, pec)
|
945   |
LNFT |
22.00 |
20,790.00 |
20.00 |
18,900.00 |
20.00 |
18,900.00 |
|
|
| 736-03-B |
jacked or bored conduit (3" sch. 80, pec)
|
80   |
LNFT |
48.00 |
3,840.00 |
43.00 |
3,440.00 |
25.00 |
2,000.00 |
|
|
| 736-04-B |
signal support (30' steel strain pole)
|
1   |
EACH |
13,000.00 |
13,000.00 |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
|
|
| 736-05-B |
signal heads (3-section, 12" led lenses, r, y, g)
|
8   |
EACH |
1,250.00 |
10,000.00 |
1,250.00 |
10,000.00 |
1,600.00 |
12,800.00 |
|
|
| 736-05-C |
signal heads (5-section, 12" led lenses, r, lt.y, y,
lt.g, g) |
4   |
EACH |
2,000.00 |
8,000.00 |
1,800.00 |
7,200.00 |
2,300.00 |
9,200.00 |
|
|
| 736-08-A |
signal controller (nema ts-2, type 2 w/type 6 cabinet)
|
1   |
EACH |
24,000.00 |
24,000.00 |
22,000.00 |
22,000.00 |
20,000.00 |
20,000.00 |
|
|
| 736-09 |
loop detector
|
200   |
LNFT |
22.00 |
4,400.00 |
20.00 |
4,000.00 |
15.00 |
3,000.00 |
|
|
| 736-10-A |
underground junction box (type e)
|
6   |
EACH |
750.00 |
4,500.00 |
800.00 |
4,800.00 |
450.00 |
2,700.00 |
|
|
| 736-10-B |
underground junction box (type f)
|
1   |
EACH |
1,000.00 |
1,000.00 |
900.00 |
900.00 |
550.00 |
550.00 |
|
|
| 736-10-C |
underground junction box (type h)
|
1   |
EACH |
1,800.00 |
1,800.00 |
1,600.00 |
1,600.00 |
1,800.00 |
1,800.00 |
|
|
| 736-11-A |
conduit (1/2" sch. 80, pec)
|
75   |
LNFT |
7.00 |
525.00 |
6.00 |
450.00 |
5.00 |
375.00 |
|
|
| 736-11-B |
conduit (1" sch. 80, pec)
|
305   |
LNFT |
7.70 |
2,348.50 |
7.00 |
2,135.00 |
5.00 |
1,525.00 |
|
|
| 736-11-C |
conduit (3" sch. 80, pec)
|
65   |
LNFT |
19.00 |
1,235.00 |
17.00 |
1,105.00 |
10.00 |
650.00 |
|
|
| 736-12-A |
conductor (2c, loop lead-in, imsa 50-2)
|
1,720   |
LNFT |
1.10 |
1,892.00 |
1.00 |
1,720.00 |
2.00 |
3,440.00 |
|
|
| 736-12-B |
conductor (6c, signal, 14 awg, stranded)
|
70   |
LNFT |
4.00 |
280.00 |
3.00 |
210.00 |
10.00 |
700.00 |
|
|
| 736-12-C |
conductor (10c, signal, 14 awg, stranded)
|
1,825   |
LNFT |
3.40 |
6,205.00 |
3.50 |
6,387.50 |
3.50 |
6,387.50 |
|
|
| 736-13-A |
cable (3/8", astm a-475, 7 strand siemens-martin grade
with class a coating) |
490   |
LNFT |
4.50 |
2,205.00 |
4.00 |
1,960.00 |
2.00 |
980.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
|
|
| S-001 |
relocate traffic signal pole and control box
|
lump |
lump |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
| S-002 |
convert catch basin to manhole
|
1   |
EACH |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
3,600.00 |
3,600.00 |
|
|
| S-003 |
saw cutting
|
465   |
LNFT |
15.00 |
6,975.00 |
6.00 |
2,790.00 |
15.00 |
6,975.00 |
|
|
| S-004 |
video detection system
|
1   |
EACH |
4,600.00 |
4,600.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
| S-005 |
video detector device and connection
|
4   |
EACH |
7,700.00 |
30,800.00 |
8,000.00 |
32,000.00 |
7,000.00 |
28,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
289,826.00 |
|
308,876.20 |
|
329,002.75 |
|
|
|