| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HARD ROCK CONSTRUCTION CO. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - CYCLE CONSTRUCTION CO. L.L.C. |
- 4 - COMMAND CONSTRUCTION INDUSTRIES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
40,000.00 |
40,000.00 |
40,716.73 |
40,716.73 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
150,000.00 |
150,000.00 |
64,000.00 |
64,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
8,709   |
SQYD |
10.00 |
87,090.00 |
6.00 |
52,254.00 |
7.00 |
60,963.00 |
15.00 |
130,635.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,578   |
SQYD |
10.00 |
15,780.00 |
5.00 |
7,890.00 |
7.50 |
11,835.00 |
15.00 |
23,670.00 |
| 203-04 |
nonplastic embankment
|
1,500   |
CUYD |
10.00 |
15,000.00 |
25.00 |
37,500.00 |
18.00 |
27,000.00 |
1.00 |
1,500.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
200,000.00 |
200,000.00 |
125,000.00 |
125,000.00 |
110,000.00 |
110,000.00 |
100,000.00 |
100,000.00 |
| 203-08 |
geotextile fabric
|
20,580   |
SQYD |
1.00 |
20,580.00 |
1.50 |
30,870.00 |
1.00 |
20,580.00 |
2.00 |
41,160.00 |
| 204-06 |
temporary silt fencing
|
3,258   |
LNFT |
1.75 |
5,701.50 |
2.00 |
6,516.00 |
2.00 |
6,516.00 |
1.50 |
4,887.00 |
| 302-02-C-01 |
class ii base course (8" thick)(crushed stone)(net
section) |
9,876.6 |
SQYD |
20.00 |
197,532.00 |
15.00 |
148,149.00 |
19.00 |
187,655.40 |
25.00 |
246,915.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
25.00 |
12,500.00 |
80.00 |
40,000.00 |
55.00 |
27,500.00 |
30.00 |
15,000.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
7,397.1 |
SQYD |
60.00 |
443,826.00 |
55.00 |
406,840.50 |
65.00 |
480,811.50 |
67.00 |
495,605.70 |
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
1,864.6 |
SQYD |
65.00 |
121,199.00 |
70.00 |
130,522.00 |
67.00 |
124,928.20 |
72.00 |
134,251.20 |
| 706-01-A |
concrete walk (4" thick)
|
1,234.2 |
SQYD |
65.00 |
80,223.00 |
60.00 |
74,052.00 |
45.00 |
55,539.00 |
55.00 |
67,881.00 |
| 706-02-C |
concrete drive (6" thick)
|
64.2 |
SQYD |
75.00 |
4,815.00 |
65.00 |
4,173.00 |
60.00 |
3,852.00 |
60.00 |
3,852.00 |
| 706-02-D |
concrete drive (8" thick)
|
207.3 |
SQYD |
75.00 |
15,547.50 |
75.00 |
15,547.50 |
70.00 |
14,511.00 |
65.00 |
13,474.50 |
| 706-03-C-01 |
incidental concrete paving (h.c. ramps)(6" thick)
|
46.8 |
SQYD |
100.00 |
4,680.00 |
170.00 |
7,956.00 |
100.00 |
4,680.00 |
150.00 |
7,020.00 |
| 707-01 |
concrete curb
|
6,041.0 |
LNFT |
7.00 |
42,287.00 |
10.00 |
60,410.00 |
16.00 |
96,656.00 |
6.00 |
36,246.00 |
| 710-01 |
flowable fill
|
94   |
CUYD |
200.00 |
18,800.00 |
250.00 |
23,500.00 |
175.00 |
16,450.00 |
250.00 |
23,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
52,000.00 |
52,000.00 |
48,000.00 |
48,000.00 |
100,000.00 |
100,000.00 |
| 714-01 |
slab sodding
|
1,956   |
SQYD |
6.00 |
11,736.00 |
6.00 |
11,736.00 |
5.00 |
9,780.00 |
12.00 |
23,472.00 |
| 715-01 |
topsoil
|
326   |
CUYD |
35.00 |
11,410.00 |
6.50 |
2,119.00 |
50.00 |
16,300.00 |
25.00 |
8,150.00 |
| 717-01 |
seeding
|
38   |
LB |
14.00 |
532.00 |
15.00 |
570.00 |
4.00 |
152.00 |
20.00 |
760.00 |
| 718-01 |
fertilizer
|
1,273   |
LB |
1.00 |
1,273.00 |
1.00 |
1,273.00 |
1.00 |
1,273.00 |
1.00 |
1,273.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
12,000.00 |
12,000.00 |
1,000.00 |
1,000.00 |
| 723-01-A |
granular material for subbase (12" thick) (net section)
|
3,292   |
CUYD |
30.00 |
98,760.00 |
27.00 |
88,884.00 |
18.00 |
59,256.00 |
30.00 |
98,760.00 |
| 723-01-B |
granular material beneath sidewalks (4" thick) (net
section) |
172   |
CUYD |
20.00 |
3,440.00 |
35.00 |
6,020.00 |
30.00 |
5,160.00 |
45.00 |
7,740.00 |
| 723-01-C |
granular material beneath concrete drives and handicap
ramps (6" thick) (net section) |
53   |
CUYD |
20.00 |
1,060.00 |
50.00 |
2,650.00 |
30.00 |
1,590.00 |
45.00 |
2,385.00 |
| 726-01 |
bedding material
|
1,051.2 |
CUYD |
50.00 |
52,560.00 |
95.00 |
99,864.00 |
51.00 |
53,611.20 |
125.00 |
131,400.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
289,000.00 |
289,000.00 |
320,000.00 |
320,000.00 |
190,000.00 |
190,000.00 |
400,000.00 |
400,000.00 |
| 729-01 |
sign (type a)
|
87.5 |
SQFT |
18.00 |
1,575.00 |
20.00 |
1,750.00 |
20.00 |
1,750.00 |
20.00 |
1,750.00 |
| 729-08-A |
mounting (2 1/2" post)
|
14   |
EACH |
55.00 |
770.00 |
60.00 |
840.00 |
60.00 |
840.00 |
60.00 |
840.00 |
| 731-02 |
reflectorized raised pavement markers
|
5   |
EACH |
7.50 |
37.50 |
5.00 |
25.00 |
6.00 |
30.00 |
50.00 |
250.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
5,990   |
LNFT |
0.50 |
2,995.00 |
0.50 |
2,995.00 |
0.55 |
3,294.50 |
0.50 |
2,995.00 |
| 732-01-B |
plastic pavement striping (6" width)
|
364   |
LNFT |
1.00 |
364.00 |
1.00 |
364.00 |
0.80 |
291.20 |
1.00 |
364.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
194   |
LNFT |
1.00 |
194.00 |
1.00 |
194.00 |
1.00 |
194.00 |
2.00 |
388.00 |
| 732-01-D |
plastic pavement striping (12" width)
|
20   |
LNFT |
3.00 |
60.00 |
1.25 |
25.00 |
1.20 |
24.00 |
3.00 |
60.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
105   |
LNFT |
5.00 |
525.00 |
4.00 |
420.00 |
4.45 |
467.25 |
5.00 |
525.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
35,000.00 |
35,000.00 |
80,000.00 |
80,000.00 |
36,000.00 |
36,000.00 |
1,000.00 |
1,000.00 |
| S-001 |
saw cut concrete curb, pavement, sidewalk, driveway,
etc. according to plans (full depth) |
568.1 |
LNFT |
6.00 |
3,408.60 |
10.00 |
5,681.00 |
14.00 |
7,953.40 |
12.00 |
6,817.20 |
| S-002 |
utility excavation (up to 6' deep)
|
10   |
EACH |
500.00 |
5,000.00 |
1,000.00 |
10,000.00 |
800.00 |
8,000.00 |
800.00 |
8,000.00 |
| S-003 |
utility excavation (over 6' deep)
|
10   |
EACH |
600.00 |
6,000.00 |
1,200.00 |
12,000.00 |
2,000.00 |
20,000.00 |
900.00 |
9,000.00 |
| S-004 |
unsuitable subgrade excavation and sand filling
(vehicular measurement) |
500   |
CUYD |
25.00 |
12,500.00 |
50.00 |
25,000.00 |
38.00 |
19,000.00 |
75.00 |
37,500.00 |
| S-005 |
compact existing subgrade
|
lump |
LUMP |
11,000.00 |
11,000.00 |
35,000.00 |
35,000.00 |
15,000.00 |
15,000.00 |
1,000.00 |
1,000.00 |
| S-006 |
plug existing 42" diameter drain line
|
1   |
EACH |
600.00 |
600.00 |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
750.00 |
750.00 |
| S-007 |
tap and connect storm drain (up to 18") to 60"
equivalent rcpa |
4   |
EACH |
1,000.00 |
4,000.00 |
2,500.00 |
10,000.00 |
1,500.00 |
6,000.00 |
400.00 |
1,600.00 |
| S-008 |
hand-formed and poured in place concrete curb
|
60   |
LNFT |
30.00 |
1,800.00 |
60.00 |
3,600.00 |
45.00 |
2,700.00 |
10.00 |
600.00 |
| S-009 |
gravel bed and filter cloth over tree roots
|
100   |
SQYD |
15.00 |
1,500.00 |
16.00 |
1,600.00 |
25.00 |
2,500.00 |
15.00 |
1,500.00 |
| S-010 |
tree removal
|
16   |
EACH |
750.00 |
12,000.00 |
825.00 |
13,200.00 |
750.00 |
12,000.00 |
1,500.00 |
24,000.00 |
| S-011 |
tree trimming
|
lump |
LUMP |
1,900.00 |
1,900.00 |
1,700.00 |
1,700.00 |
5,500.00 |
5,500.00 |
50,000.00 |
50,000.00 |
| S-012 |
root pruning
|
25   |
EACH |
245.00 |
6,125.00 |
250.00 |
6,250.00 |
320.00 |
8,000.00 |
50.00 |
1,250.00 |
| S-013 |
new tree (savannah holly - 2" min. caliper, 12' min.
height) |
13   |
EACH |
295.00 |
3,835.00 |
300.00 |
3,900.00 |
300.00 |
3,900.00 |
300.00 |
3,900.00 |
| S-014 |
asphaltic concrete for pot hole repair on access route
and for temporary surfacing |
100.00 |
TON |
125.00 |
12,500.00 |
200.00 |
20,000.00 |
185.00 |
18,500.00 |
150.00 |
15,000.00 |
| S-015 |
street name sign on new post
|
4   |
EACH |
185.00 |
740.00 |
200.00 |
800.00 |
200.00 |
800.00 |
200.00 |
800.00 |
| S-016 |
project sign
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
1,300.00 |
1,300.00 |
1,000.00 |
1,000.00 |
| S-017 |
reinforced concrete pipe (15")
|
812   |
LNFT |
75.00 |
60,900.00 |
90.00 |
73,080.00 |
125.00 |
101,500.00 |
90.00 |
73,080.00 |
| S-018 |
reinforced concrete pipe (18")
|
924   |
LNFT |
79.00 |
72,996.00 |
110.00 |
101,640.00 |
135.00 |
124,740.00 |
105.00 |
97,020.00 |
| S-019 |
reinforced concrete pipe (21")
|
295   |
LNFT |
93.00 |
27,435.00 |
150.00 |
44,250.00 |
145.00 |
42,775.00 |
125.00 |
36,875.00 |
| S-020 |
reinforced concrete pipe (36")
|
13   |
LNFT |
184.00 |
2,392.00 |
300.00 |
3,900.00 |
340.00 |
4,420.00 |
200.00 |
2,600.00 |
| S-021 |
reinforced concrete arch pipe (48" equiv.)
|
37   |
LNFT |
199.00 |
7,363.00 |
350.00 |
12,950.00 |
360.00 |
13,320.00 |
300.00 |
11,100.00 |
| S-022 |
reinforced concrete arch pipe (60" equiv.)
|
921   |
LNFT |
250.00 |
230,250.00 |
400.00 |
368,400.00 |
490.00 |
451,290.00 |
400.00 |
368,400.00 |
| S-023 |
yard drain service line (6" pvc)
|
500   |
LNFT |
17.00 |
8,500.00 |
20.00 |
10,000.00 |
30.00 |
15,000.00 |
10.00 |
5,000.00 |
| S-024 |
yard drain service line (10" pvc)
|
500   |
LNFT |
21.00 |
10,500.00 |
25.00 |
12,500.00 |
30.00 |
15,000.00 |
10.00 |
5,000.00 |
| S-025 |
reinforced concrete wye - new (15"x15")
|
2   |
EACH |
385.00 |
770.00 |
450.00 |
900.00 |
700.00 |
1,400.00 |
400.00 |
800.00 |
| S-026 |
reinforced concrete wye - new (18"x15")
|
2   |
EACH |
490.00 |
980.00 |
600.00 |
1,200.00 |
850.00 |
1,700.00 |
500.00 |
1,000.00 |
| S-027 |
reinforced concrete wye - new (21"x15")
|
1   |
EACH |
650.00 |
650.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
750.00 |
750.00 |
| S-028 |
junction box (s&wb of n.o. - dwg. # d-3937)
|
7   |
EACH |
12,000.00 |
84,000.00 |
20,000.00 |
140,000.00 |
24,500.00 |
171,500.00 |
10,000.00 |
70,000.00 |
| S-029 |
no. 1 standard manhole (s&wb of n.o. - dwg. # d-870)
|
10   |
EACH |
3,000.00 |
30,000.00 |
4,200.00 |
42,000.00 |
5,000.00 |
50,000.00 |
3,500.00 |
35,000.00 |
| S-030 |
no. 3 standard manhole (s&wb of n.o. - dwg. # d-870)
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,700.00 |
5,700.00 |
6,200.00 |
6,200.00 |
4,500.00 |
4,500.00 |
| S-031 |
no. 1 standard catch basin (s&wb of n.o. - dwg. #
d-873) |
3   |
EACH |
3,000.00 |
9,000.00 |
5,400.00 |
16,200.00 |
4,000.00 |
12,000.00 |
3,000.00 |
9,000.00 |
| S-032 |
double no. 1 standard catch basin (s&wb of n.o. - dwg.
# d-873-a) |
10   |
EACH |
4,000.00 |
40,000.00 |
8,800.00 |
88,000.00 |
6,000.00 |
60,000.00 |
6,000.00 |
60,000.00 |
| S-033 |
single mountable catch basin (s&wb of n.o. - dwg. #
d-3431-a) |
3   |
EACH |
3,000.00 |
9,000.00 |
3,700.00 |
11,100.00 |
3,100.00 |
9,300.00 |
3,000.00 |
9,000.00 |
| S-034 |
double mountable catch basin (s&wb of n.o. - dwg. #
d-3431-b) |
2   |
EACH |
5,000.00 |
10,000.00 |
7,500.00 |
15,000.00 |
5,100.00 |
10,200.00 |
6,000.00 |
12,000.00 |
| S-035 |
drop inlet (30"x24") (s&wb of n.o. - dwg. # d-3264)
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,800.00 |
2,800.00 |
3,200.00 |
3,200.00 |
3,000.00 |
3,000.00 |
| S-036 |
water main (8") with main line fittings(pvc-c900)
|
229.0 |
LNFT |
115.00 |
26,335.00 |
65.00 |
14,885.00 |
200.00 |
45,800.00 |
100.00 |
22,900.00 |
| S-037 |
water main (12") with main line fittings (pvc-c900)
|
1,642.0 |
LNFT |
58.00 |
95,236.00 |
68.00 |
111,656.00 |
90.00 |
147,780.00 |
110.00 |
180,620.00 |
| S-038 |
water main (12") with main line fittings (ductile iron)
|
27.0 |
LNFT |
300.00 |
8,100.00 |
200.00 |
5,400.00 |
170.00 |
4,590.00 |
200.00 |
5,400.00 |
| S-039 |
water valve (8")
|
1   |
EACH |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
4,900.00 |
4,900.00 |
5,500.00 |
5,500.00 |
| S-040 |
water valve (12")
|
4   |
EACH |
7,000.00 |
28,000.00 |
8,000.00 |
32,000.00 |
8,200.00 |
32,800.00 |
9,000.00 |
36,000.00 |
| S-041 |
valve manhole (s&wb of n.o. dwg. # 6179-f-2)
|
5   |
EACH |
2,000.00 |
10,000.00 |
3,700.00 |
18,500.00 |
3,700.00 |
18,500.00 |
3,000.00 |
15,000.00 |
| S-042 |
fire hydrant (s&wb of n.o. dwg. # 6179-f2)
|
5   |
EACH |
4,000.00 |
20,000.00 |
3,800.00 |
19,000.00 |
4,000.00 |
20,000.00 |
4,300.00 |
21,500.00 |
| S-043 |
replace 1" water house connection (from main to meter)
with reducer as needed |
70   |
EACH |
500.00 |
35,000.00 |
800.00 |
56,000.00 |
700.00 |
49,000.00 |
250.00 |
17,500.00 |
| S-044 |
replace 4" water house connection (from main to meter)
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
5,000.00 |
10,000.00 |
1,250.00 |
2,500.00 |
| S-045 |
replace 8" water house connection (from main to meter)
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
7,800.00 |
7,800.00 |
1,500.00 |
1,500.00 |
| S-046 |
eight (8") inch water main offset (up to 48")
|
5   |
EACH |
2,500.00 |
12,500.00 |
4,900.00 |
24,500.00 |
7,000.00 |
35,000.00 |
4,500.00 |
22,500.00 |
| S-047 |
twelve (12") inch water line offset (up to 48")
|
1   |
EACH |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
6,500.00 |
6,500.00 |
| S-048 |
remove mud and debris from inside of water meter box
|
35   |
EACH |
25.00 |
875.00 |
100.00 |
3,500.00 |
110.00 |
3,850.00 |
0.00 |
0.00 |
| S-049 |
adjust complete water meter box to grade
|
17   |
EACH |
100.00 |
1,700.00 |
200.00 |
3,400.00 |
135.00 |
2,295.00 |
150.00 |
2,550.00 |
| S-050 |
replace broken water meter box
|
17   |
EACH |
500.00 |
8,500.00 |
600.00 |
10,200.00 |
500.00 |
8,500.00 |
400.00 |
6,800.00 |
| S-051 |
plug existing water or sewer main (up to 12" diameter)
|
14   |
EACH |
100.00 |
1,400.00 |
400.00 |
5,600.00 |
550.00 |
7,700.00 |
125.00 |
1,750.00 |
| S-052 |
install eight (8") inch sewer main (8.1' to 10.0' deep)
|
488   |
LNFT |
114.00 |
55,632.00 |
170.00 |
82,960.00 |
210.00 |
102,480.00 |
175.00 |
85,400.00 |
| S-053 |
install eight (8") inch sewer main (10.1' to 12.0'
deep) |
239   |
LNFT |
192.00 |
45,888.00 |
230.00 |
54,970.00 |
265.00 |
63,335.00 |
200.00 |
47,800.00 |
| S-054 |
install ten (10") inch sewer main (8.1' to 10.0' deep)
|
617   |
LNFT |
139.00 |
85,763.00 |
180.00 |
111,060.00 |
230.00 |
141,910.00 |
200.00 |
123,400.00 |
| S-055 |
install ten (10") inch sewer main (10.1' to 12.0' deep)
|
129   |
LNFT |
227.00 |
29,283.00 |
230.00 |
29,670.00 |
300.00 |
38,700.00 |
225.00 |
29,025.00 |
| S-056 |
install twelve (12") inch sewer main (10.1' to 12.0'
deep) |
58   |
LNFT |
300.00 |
17,400.00 |
240.00 |
13,920.00 |
310.00 |
17,980.00 |
250.00 |
14,500.00 |
| S-057 |
sewage force main (12") with main line fittings
(pvc-c900) |
809.0 |
LNFT |
64.00 |
51,776.00 |
160.00 |
129,440.00 |
160.00 |
129,440.00 |
180.00 |
145,620.00 |
| S-058 |
sewage force main (12") with main line fittings
(ductile iron) |
28.0 |
LNFT |
288.00 |
8,064.00 |
300.00 |
8,400.00 |
250.00 |
7,000.00 |
300.00 |
8,400.00 |
| S-059 |
twelve (12") inch sewage force main offset (up to 48")
|
1   |
EACH |
8,000.00 |
8,000.00 |
8,500.00 |
8,500.00 |
8,500.00 |
8,500.00 |
8,500.00 |
8,500.00 |
| S-060 |
sewer manhole (s&wb of n.o. dwg. # 6178-b6)
|
7   |
EACH |
4,000.00 |
28,000.00 |
4,500.00 |
31,500.00 |
5,400.00 |
37,800.00 |
4,500.00 |
31,500.00 |
| S-061 |
replace existing sewer house connection from new main
to property line (s&wb of n.o. dwg. # 6312-e5-a&b) |
40   |
EACH |
1,000.00 |
40,000.00 |
1,800.00 |
72,000.00 |
1,200.00 |
48,000.00 |
750.00 |
30,000.00 |
| S-062 |
adjust manhole (up to 6") with brick and mortar
|
2   |
EACH |
200.00 |
400.00 |
400.00 |
800.00 |
500.00 |
1,000.00 |
350.00 |
700.00 |
| S-063 |
adjust manhole (over 6" and up to 36") with brick and
mortar |
3   |
EACH |
200.00 |
600.00 |
600.00 |
1,800.00 |
1,200.00 |
3,600.00 |
400.00 |
1,200.00 |
| S-064 |
relocation of existing light standards
|
5   |
EACH |
2,300.00 |
11,500.00 |
3,250.00 |
16,250.00 |
2,500.00 |
12,500.00 |
2,500.00 |
12,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,343,149.10 |
|
3,924,171.00 |
|
4,076,448.65 |
|
4,123,333.33 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - WALLACE C. DRENNAN, INC. |
- 6 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
8,709   |
SQYD |
10.00 |
87,090.00 |
12.00 |
104,508.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,578   |
SQYD |
20.00 |
31,560.00 |
24.00 |
37,872.00 |
|
|
|
|
| 203-04 |
nonplastic embankment
|
1,500   |
CUYD |
10.00 |
15,000.00 |
26.00 |
39,000.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
288,000.00 |
288,000.00 |
190,000.00 |
190,000.00 |
|
|
|
|
| 203-08 |
geotextile fabric
|
20,580   |
SQYD |
1.00 |
20,580.00 |
1.50 |
30,870.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,258   |
LNFT |
1.00 |
3,258.00 |
2.00 |
6,516.00 |
|
|
|
|
| 302-02-C-01 |
class ii base course (8" thick)(crushed stone)(net
section) |
9,876.6 |
SQYD |
22.00 |
217,285.20 |
20.00 |
197,532.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
15.00 |
7,500.00 |
80.00 |
40,000.00 |
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
7,397.1 |
SQYD |
70.00 |
517,797.00 |
70.00 |
517,797.00 |
|
|
|
|
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
1,864.6 |
SQYD |
75.00 |
139,845.00 |
70.00 |
130,522.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,234.2 |
SQYD |
65.00 |
80,223.00 |
75.00 |
92,565.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
64.2 |
SQYD |
70.00 |
4,494.00 |
130.00 |
8,346.00 |
|
|
|
|
| 706-02-D |
concrete drive (8" thick)
|
207.3 |
SQYD |
75.00 |
15,547.50 |
150.00 |
31,095.00 |
|
|
|
|
| 706-03-C-01 |
incidental concrete paving (h.c. ramps)(6" thick)
|
46.8 |
SQYD |
125.00 |
5,850.00 |
250.00 |
11,700.00 |
|
|
|
|
| 707-01 |
concrete curb
|
6,041.0 |
LNFT |
7.00 |
42,287.00 |
18.00 |
108,738.00 |
|
|
|
|
| 710-01 |
flowable fill
|
94   |
CUYD |
200.00 |
18,800.00 |
350.00 |
32,900.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
39,000.00 |
39,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 714-01 |
slab sodding
|
1,956   |
SQYD |
10.00 |
19,560.00 |
7.00 |
13,692.00 |
|
|
|
|
| 715-01 |
topsoil
|
326   |
CUYD |
50.00 |
16,300.00 |
48.00 |
15,648.00 |
|
|
|
|
| 717-01 |
seeding
|
38   |
LB |
10.00 |
380.00 |
16.50 |
627.00 |
|
|
|
|
| 718-01 |
fertilizer
|
1,273   |
LB |
1.00 |
1,273.00 |
0.70 |
891.10 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 723-01-A |
granular material for subbase (12" thick) (net section)
|
3,292   |
CUYD |
20.00 |
65,840.00 |
30.00 |
98,760.00 |
|
|
|
|
| 723-01-B |
granular material beneath sidewalks (4" thick) (net
section) |
172   |
CUYD |
25.00 |
4,300.00 |
60.00 |
10,320.00 |
|
|
|
|
| 723-01-C |
granular material beneath concrete drives and handicap
ramps (6" thick) (net section) |
53   |
CUYD |
25.00 |
1,325.00 |
50.00 |
2,650.00 |
|
|
|
|
| 726-01 |
bedding material
|
1,051.2 |
CUYD |
15.00 |
15,768.00 |
20.00 |
21,024.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
400,000.00 |
400,000.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
87.5 |
SQFT |
25.00 |
2,187.50 |
21.00 |
1,837.50 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
14   |
EACH |
70.00 |
980.00 |
66.00 |
924.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
5   |
EACH |
25.00 |
125.00 |
6.20 |
31.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
5,990   |
LNFT |
1.00 |
5,990.00 |
0.65 |
3,893.50 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
364   |
LNFT |
1.00 |
364.00 |
0.90 |
327.60 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
194   |
LNFT |
1.00 |
194.00 |
1.20 |
232.80 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
20   |
LNFT |
2.00 |
40.00 |
1.40 |
28.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
105   |
LNFT |
5.00 |
525.00 |
5.00 |
525.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
80,000.00 |
80,000.00 |
|
|
|
|
| S-001 |
saw cut concrete curb, pavement, sidewalk, driveway,
etc. according to plans (full depth) |
568.1 |
LNFT |
10.00 |
5,681.00 |
5.00 |
2,840.50 |
|
|
|
|
| S-002 |
utility excavation (up to 6' deep)
|
10   |
EACH |
500.00 |
5,000.00 |
1,500.00 |
15,000.00 |
|
|
|
|
| S-003 |
utility excavation (over 6' deep)
|
10   |
EACH |
600.00 |
6,000.00 |
2,500.00 |
25,000.00 |
|
|
|
|
| S-004 |
unsuitable subgrade excavation and sand filling
(vehicular measurement) |
500   |
CUYD |
10.00 |
5,000.00 |
62.00 |
31,000.00 |
|
|
|
|
| S-005 |
compact existing subgrade
|
lump |
LUMP |
1,000.00 |
1,000.00 |
17,000.00 |
17,000.00 |
|
|
|
|
| S-006 |
plug existing 42" diameter drain line
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-007 |
tap and connect storm drain (up to 18") to 60"
equivalent rcpa |
4   |
EACH |
2,500.00 |
10,000.00 |
4,000.00 |
16,000.00 |
|
|
|
|
| S-008 |
hand-formed and poured in place concrete curb
|
60   |
LNFT |
100.00 |
6,000.00 |
30.00 |
1,800.00 |
|
|
|
|
| S-009 |
gravel bed and filter cloth over tree roots
|
100   |
SQYD |
10.00 |
1,000.00 |
18.00 |
1,800.00 |
|
|
|
|
| S-010 |
tree removal
|
16   |
EACH |
2,000.00 |
32,000.00 |
900.00 |
14,400.00 |
|
|
|
|
| S-011 |
tree trimming
|
lump |
LUMP |
25,000.00 |
25,000.00 |
1,900.00 |
1,900.00 |
|
|
|
|
| S-012 |
root pruning
|
25   |
EACH |
600.00 |
15,000.00 |
300.00 |
7,500.00 |
|
|
|
|
| S-013 |
new tree (savannah holly - 2" min. caliper, 12' min.
height) |
13   |
EACH |
600.00 |
7,800.00 |
350.00 |
4,550.00 |
|
|
|
|
| S-014 |
asphaltic concrete for pot hole repair on access route
and for temporary surfacing |
100.00 |
TON |
200.00 |
20,000.00 |
400.00 |
40,000.00 |
|
|
|
|
| S-015 |
street name sign on new post
|
4   |
EACH |
200.00 |
800.00 |
225.00 |
900.00 |
|
|
|
|
| S-016 |
project sign
|
1   |
EACH |
2,500.00 |
2,500.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| S-017 |
reinforced concrete pipe (15")
|
812   |
LNFT |
120.00 |
97,440.00 |
110.00 |
89,320.00 |
|
|
|
|
| S-018 |
reinforced concrete pipe (18")
|
924   |
LNFT |
125.00 |
115,500.00 |
120.00 |
110,880.00 |
|
|
|
|
| S-019 |
reinforced concrete pipe (21")
|
295   |
LNFT |
135.00 |
39,825.00 |
135.00 |
39,825.00 |
|
|
|
|
| S-020 |
reinforced concrete pipe (36")
|
13   |
LNFT |
290.00 |
3,770.00 |
240.00 |
3,120.00 |
|
|
|
|
| S-021 |
reinforced concrete arch pipe (48" equiv.)
|
37   |
LNFT |
400.00 |
14,800.00 |
350.00 |
12,950.00 |
|
|
|
|
| S-022 |
reinforced concrete arch pipe (60" equiv.)
|
921   |
LNFT |
500.00 |
460,500.00 |
470.00 |
432,870.00 |
|
|
|
|
| S-023 |
yard drain service line (6" pvc)
|
500   |
LNFT |
10.00 |
5,000.00 |
35.00 |
17,500.00 |
|
|
|
|
| S-024 |
yard drain service line (10" pvc)
|
500   |
LNFT |
11.00 |
5,500.00 |
50.00 |
25,000.00 |
|
|
|
|
| S-025 |
reinforced concrete wye - new (15"x15")
|
2   |
EACH |
400.00 |
800.00 |
2,100.00 |
4,200.00 |
|
|
|
|
| S-026 |
reinforced concrete wye - new (18"x15")
|
2   |
EACH |
500.00 |
1,000.00 |
2,400.00 |
4,800.00 |
|
|
|
|
| S-027 |
reinforced concrete wye - new (21"x15")
|
1   |
EACH |
700.00 |
700.00 |
2,400.00 |
2,400.00 |
|
|
|
|
| S-028 |
junction box (s&wb of n.o. - dwg. # d-3937)
|
7   |
EACH |
17,000.00 |
119,000.00 |
24,000.00 |
168,000.00 |
|
|
|
|
| S-029 |
no. 1 standard manhole (s&wb of n.o. - dwg. # d-870)
|
10   |
EACH |
4,700.00 |
47,000.00 |
4,200.00 |
42,000.00 |
|
|
|
|
| S-030 |
no. 3 standard manhole (s&wb of n.o. - dwg. # d-870)
|
1   |
EACH |
6,000.00 |
6,000.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| S-031 |
no. 1 standard catch basin (s&wb of n.o. - dwg. #
d-873) |
3   |
EACH |
5,000.00 |
15,000.00 |
4,500.00 |
13,500.00 |
|
|
|
|
| S-032 |
double no. 1 standard catch basin (s&wb of n.o. - dwg.
# d-873-a) |
10   |
EACH |
7,500.00 |
75,000.00 |
6,500.00 |
65,000.00 |
|
|
|
|
| S-033 |
single mountable catch basin (s&wb of n.o. - dwg. #
d-3431-a) |
3   |
EACH |
4,500.00 |
13,500.00 |
4,200.00 |
12,600.00 |
|
|
|
|
| S-034 |
double mountable catch basin (s&wb of n.o. - dwg. #
d-3431-b) |
2   |
EACH |
7,500.00 |
15,000.00 |
7,400.00 |
14,800.00 |
|
|
|
|
| S-035 |
drop inlet (30"x24") (s&wb of n.o. - dwg. # d-3264)
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,600.00 |
3,600.00 |
|
|
|
|
| S-036 |
water main (8") with main line fittings(pvc-c900)
|
229.0 |
LNFT |
200.00 |
45,800.00 |
275.00 |
62,975.00 |
|
|
|
|
| S-037 |
water main (12") with main line fittings (pvc-c900)
|
1,642.0 |
LNFT |
88.00 |
144,496.00 |
72.00 |
118,224.00 |
|
|
|
|
| S-038 |
water main (12") with main line fittings (ductile iron)
|
27.0 |
LNFT |
166.00 |
4,482.00 |
170.00 |
4,590.00 |
|
|
|
|
| S-039 |
water valve (8")
|
1   |
EACH |
5,400.00 |
5,400.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| S-040 |
water valve (12")
|
4   |
EACH |
8,800.00 |
35,200.00 |
13,000.00 |
52,000.00 |
|
|
|
|
| S-041 |
valve manhole (s&wb of n.o. dwg. # 6179-f-2)
|
5   |
EACH |
3,600.00 |
18,000.00 |
5,500.00 |
27,500.00 |
|
|
|
|
| S-042 |
fire hydrant (s&wb of n.o. dwg. # 6179-f2)
|
5   |
EACH |
5,000.00 |
25,000.00 |
6,500.00 |
32,500.00 |
|
|
|
|
| S-043 |
replace 1" water house connection (from main to meter)
with reducer as needed |
70   |
EACH |
600.00 |
42,000.00 |
1,050.00 |
73,500.00 |
|
|
|
|
| S-044 |
replace 4" water house connection (from main to meter)
|
2   |
EACH |
7,500.00 |
15,000.00 |
2,500.00 |
5,000.00 |
|
|
|
|
| S-045 |
replace 8" water house connection (from main to meter)
|
1   |
EACH |
10,000.00 |
10,000.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| S-046 |
eight (8") inch water main offset (up to 48")
|
5   |
EACH |
500.00 |
2,500.00 |
14,000.00 |
70,000.00 |
|
|
|
|
| S-047 |
twelve (12") inch water line offset (up to 48")
|
1   |
EACH |
1,000.00 |
1,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-048 |
remove mud and debris from inside of water meter box
|
35   |
EACH |
50.00 |
1,750.00 |
100.00 |
3,500.00 |
|
|
|
|
| S-049 |
adjust complete water meter box to grade
|
17   |
EACH |
100.00 |
1,700.00 |
400.00 |
6,800.00 |
|
|
|
|
| S-050 |
replace broken water meter box
|
17   |
EACH |
600.00 |
10,200.00 |
1,400.00 |
23,800.00 |
|
|
|
|
| S-051 |
plug existing water or sewer main (up to 12" diameter)
|
14   |
EACH |
100.00 |
1,400.00 |
1,100.00 |
15,400.00 |
|
|
|
|
| S-052 |
install eight (8") inch sewer main (8.1' to 10.0' deep)
|
488   |
LNFT |
175.00 |
85,400.00 |
185.00 |
90,280.00 |
|
|
|
|
| S-053 |
install eight (8") inch sewer main (10.1' to 12.0'
deep) |
239   |
LNFT |
250.00 |
59,750.00 |
230.00 |
54,970.00 |
|
|
|
|
| S-054 |
install ten (10") inch sewer main (8.1' to 10.0' deep)
|
617   |
LNFT |
175.00 |
107,975.00 |
210.00 |
129,570.00 |
|
|
|
|
| S-055 |
install ten (10") inch sewer main (10.1' to 12.0' deep)
|
129   |
LNFT |
350.00 |
45,150.00 |
235.00 |
30,315.00 |
|
|
|
|
| S-056 |
install twelve (12") inch sewer main (10.1' to 12.0'
deep) |
58   |
LNFT |
350.00 |
20,300.00 |
265.00 |
15,370.00 |
|
|
|
|
| S-057 |
sewage force main (12") with main line fittings
(pvc-c900) |
809.0 |
LNFT |
100.00 |
80,900.00 |
160.00 |
129,440.00 |
|
|
|
|
| S-058 |
sewage force main (12") with main line fittings
(ductile iron) |
28.0 |
LNFT |
200.00 |
5,600.00 |
230.00 |
6,440.00 |
|
|
|
|
| S-059 |
twelve (12") inch sewage force main offset (up to 48")
|
1   |
EACH |
2,000.00 |
2,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-060 |
sewer manhole (s&wb of n.o. dwg. # 6178-b6)
|
7   |
EACH |
6,000.00 |
42,000.00 |
5,500.00 |
38,500.00 |
|
|
|
|
| S-061 |
replace existing sewer house connection from new main
to property line (s&wb of n.o. dwg. # 6312-e5-a&b) |
40   |
EACH |
2,500.00 |
100,000.00 |
2,100.00 |
84,000.00 |
|
|
|
|
| S-062 |
adjust manhole (up to 6") with brick and mortar
|
2   |
EACH |
500.00 |
1,000.00 |
350.00 |
700.00 |
|
|
|
|
| S-063 |
adjust manhole (over 6" and up to 36") with brick and
mortar |
3   |
EACH |
1,000.00 |
3,000.00 |
900.00 |
2,700.00 |
|
|
|
|
| S-064 |
relocation of existing light standards
|
5   |
EACH |
3,000.00 |
15,000.00 |
2,500.00 |
12,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,294,387.20 |
|
4,682,002.00 |
|
|
|
|
|