| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BENTON & BROWN, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
8,314   |
SQYD |
21.00 |
174,594.00 |
6.00 |
49,884.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,102.6 |
SQYD |
10.00 |
61,026.00 |
10.25 |
62,551.65 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
18,458   |
CUYD |
14.00 |
258,412.00 |
18.00 |
332,244.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
50,033.6 |
TON |
95.00 |
4,753,192.00 |
95.00 |
4,753,192.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,500.0 |
TON |
50.00 |
175,000.00 |
125.00 |
437,500.00 |
|
|
|
|
| 508-01 |
asphalt concrete (sma) wearing course
|
7,370.9 |
TON |
95.00 |
700,235.50 |
130.00 |
958,217.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
30,417   |
SQYD |
2.25 |
68,438.25 |
2.50 |
76,042.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,744   |
CUYD |
1.00 |
- 1,744.00 |
0.10 |
- 174.40 |
|
|
|
|
| 703-01 |
shoulder underdrain systems
|
24,722   |
LNFT |
8.80 |
217,553.60 |
15.00 |
370,830.00 |
|
|
|
|
| 703-02 |
shoulder outlet underdrains
|
83   |
EACH |
400.00 |
33,200.00 |
385.00 |
31,955.00 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
172.3 |
SQYD |
80.00 |
13,784.00 |
85.00 |
14,645.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
245,000.00 |
245,000.00 |
423,000.00 |
423,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.449 |
MILE |
500.00 |
2,224.50 |
330.00 |
1,468.17 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
36.588 |
MILE |
735.00 |
26,892.18 |
800.00 |
29,270.40 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
13.7 |
TON |
600.00 |
8,220.00 |
930.00 |
12,741.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
245,000.00 |
245,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
600   |
EACH |
5.10 |
3,060.00 |
5.60 |
3,360.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
18.839 |
MILE |
2,904.00 |
54,708.46 |
3,200.00 |
60,284.80 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.011 |
MILE |
20,856.00 |
229.42 |
20,860.00 |
229.46 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.960 |
MILE |
790.00 |
3,918.40 |
870.00 |
4,315.20 |
|
|
|
|
| 732-05 |
removal of existing markings
|
4.952 |
MILE |
5,400.00 |
26,740.80 |
5,900.00 |
29,216.80 |
|
|
|
|
| 734-01 |
rubblizing portland cement concrete pavement
|
67,033   |
SQYD |
4.00 |
268,132.00 |
2.85 |
191,044.05 |
|
|
|
|
| 739-01 |
hydro-seeding
|
9.14 |
ACRE |
1,500.00 |
13,710.00 |
1,600.00 |
14,624.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
75,000.00 |
75,000.00 |
6,600.00 |
6,600.00 |
|
|
|
|
| S-001 |
hauling and stockpiling p.c.c. pavement
|
lump |
LUMP |
20,000.00 |
20,000.00 |
71,300.00 |
71,300.00 |
|
|
|
|
| S-002 |
rubblization prep.
|
lump |
LUMP |
25,500.00 |
25,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-003 |
pccp joint membrane
|
3,248   |
LNFT |
3.00 |
9,744.00 |
5.75 |
18,676.00 |
|
|
|
|
| S-004 |
pccp sawcutting
|
1,257   |
LNFT |
20.00 |
25,140.00 |
16.50 |
20,740.50 |
|
|
|
|
| S-005 |
dynamic message sign unit
|
10   |
EACH |
10,000.00 |
100,000.00 |
11,250.00 |
112,500.00 |
|
|
|
|
| S-006 |
rumble strips (ground-in)
|
8.8 |
MILE |
1,200.00 |
10,560.00 |
1,300.00 |
11,440.00 |
|
|
|
|
| S-007 |
soil mixing
|
lump |
LUMP |
12,500.00 |
12,500.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| S-008 |
adjusting guardrail
|
lump |
LUMP |
57,600.00 |
57,600.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| S-922 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
3,600   |
LNFT |
1.50 |
5,400.00 |
1.65 |
5,940.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
4,500   |
LNFT |
1.75 |
7,875.00 |
1.40 |
6,300.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,700,846.11 |
|
8,724,937.63 |
|
|
|
|
|