| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - AUSTIN BRIDGE & ROAD, LP |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
925,000.00 |
925,000.00 |
465,000.00 |
465,000.00 |
500,000.00 |
500,000.00 |
1,392,000.00 |
1,392,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
35,500.00 |
35,500.00 |
40,820.00 |
40,820.00 |
| 202-02-B-01 |
removal of concrete box culverts (sta. 13+295, 1890mm
x 1520mm) |
1   |
ea |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
2,800.00 |
2,800.00 |
5,100.00 |
5,100.00 |
| 202-02-B-02 |
removal of concrete box culverts (sta. 13+850, 1830mm
x 2050mm) |
1   |
ea |
7,500.00 |
7,500.00 |
8,000.00 |
8,000.00 |
2,800.00 |
2,800.00 |
7,150.00 |
7,150.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
7,346.3 |
sq m |
4.00 |
29,385.20 |
10.00 |
73,463.00 |
7.00 |
51,424.10 |
11.00 |
80,809.30 |
| 202-02-H |
removal of guard rail
|
354   |
ln m |
16.00 |
5,664.00 |
20.00 |
7,080.00 |
15.00 |
5,310.00 |
30.00 |
10,620.00 |
| 203-01 |
general excavation
|
206,695   |
cu m |
3.05 |
630,419.75 |
4.00 |
826,780.00 |
5.00 |
1,033,475.00 |
6.00 |
1,240,170.00 |
| 203-02 |
drainage excavation
|
1,494   |
cu m |
12.00 |
17,928.00 |
16.00 |
23,904.00 |
20.00 |
29,880.00 |
24.00 |
35,856.00 |
| 203-03 |
embankment
|
211,103   |
cu m |
5.20 |
1,097,735.60 |
6.00 |
1,266,618.00 |
6.00 |
1,266,618.00 |
9.40 |
1,984,368.20 |
| 204-02 |
temporary hay or straw bales
|
161   |
ea |
15.00 |
2,415.00 |
30.00 |
4,830.00 |
18.00 |
2,898.00 |
10.00 |
1,610.00 |
| 204-03 |
temporary slope drains
|
1,035   |
ln m |
25.00 |
25,875.00 |
5.00 |
5,175.00 |
50.00 |
51,750.00 |
5.00 |
5,175.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
37   |
ea |
220.00 |
8,140.00 |
250.00 |
9,250.00 |
130.00 |
4,810.00 |
150.00 |
5,550.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
63   |
ea |
400.00 |
25,200.00 |
600.00 |
37,800.00 |
380.00 |
23,940.00 |
200.00 |
12,600.00 |
| 204-06 |
temporary silt fencing
|
2,655   |
ln m |
3.60 |
9,558.00 |
20.00 |
53,100.00 |
8.00 |
21,240.00 |
6.00 |
15,930.00 |
| 302-02-E |
class ii base course (250 mm thick)(soil cement)
|
116,585.1 |
sq m |
11.80 |
1,375,704.18 |
11.25 |
1,311,582.38 |
10.00 |
1,165,851.00 |
12.96 |
1,510,942.90 |
| 302-02-G-01 |
class ii base course (100 mm thick)(crushed stone or
recycled pccp) |
116,770.3 |
sq m |
11.00 |
1,284,473.30 |
10.00 |
1,167,703.00 |
15.00 |
1,751,554.50 |
14.74 |
1,721,194.22 |
| 304-05 |
lime treatment (type e)
|
1,344.20 |
Mg |
1.00 |
1,344.20 |
1.00 |
1,344.20 |
1.00 |
1,344.20 |
525.58 |
706,484.64 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
110   |
cu m |
115.00 |
12,650.00 |
35.00 |
3,850.00 |
150.00 |
16,500.00 |
128.33 |
14,116.30 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
800.0 |
cu m |
58.00 |
46,400.00 |
72.00 |
57,600.00 |
140.00 |
112,000.00 |
85.00 |
68,000.00 |
| 502-01 |
superpave asphaltic concrete
|
29,850.3 |
Mg |
74.00 |
2,208,922.20 |
72.00 |
2,149,221.60 |
76.50 |
2,283,547.95 |
82.00 |
2,447,724.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
5,550.5 |
Mg |
100.00 |
555,050.00 |
93.00 |
516,196.50 |
98.00 |
543,949.00 |
108.00 |
599,454.00 |
| 510-01-C |
pavement patching (480 mm thickness)
|
1,220   |
sq m |
130.00 |
158,600.00 |
108.00 |
131,760.00 |
185.00 |
225,700.00 |
175.00 |
213,500.00 |
| 701-01-F |
cross drain pipe (375mm rcp/pp)
|
291.1 |
ln m |
200.00 |
58,220.00 |
215.00 |
62,586.50 |
180.00 |
52,398.00 |
210.00 |
61,131.00 |
| 701-01-G |
cross drain pipe (450 mm rcp/pp)
|
93.9 |
ln m |
180.00 |
16,902.00 |
230.00 |
21,597.00 |
160.00 |
15,024.00 |
230.00 |
21,597.00 |
| 701-01-I |
cross drain pipe (600 mm rcp/pp)
|
70.5 |
ln m |
280.00 |
19,740.00 |
260.00 |
18,330.00 |
250.00 |
17,625.00 |
255.00 |
17,977.50 |
| 701-01-K |
cross drain pipe (750 mm rcp/pp)
|
231.6 |
ln m |
305.00 |
70,638.00 |
300.00 |
69,480.00 |
290.00 |
67,164.00 |
290.00 |
67,164.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pp)
|
355.3 |
ln m |
420.00 |
149,226.00 |
410.00 |
145,673.00 |
390.00 |
138,567.00 |
410.00 |
145,673.00 |
| 701-01-O |
cross drain pipe (1200 mm rcp/pp)
|
60.4 |
ln m |
680.00 |
41,072.00 |
600.00 |
36,240.00 |
620.00 |
37,448.00 |
590.00 |
35,636.00 |
| 701-01-Q |
cross drain pipe (1500 mm rcp/pp)
|
114.6 |
ln m |
835.00 |
95,691.00 |
900.00 |
103,140.00 |
790.00 |
90,534.00 |
910.00 |
104,286.00 |
| 701-03-F |
storm drain pipe (375 mm rcp/pp)
|
69.3 |
ln m |
250.00 |
17,325.00 |
205.00 |
14,206.50 |
240.00 |
16,632.00 |
205.00 |
14,206.50 |
| 701-03-F-01 |
storm drain pipe (375 mm rcp/pp) outfall
|
40.0 |
ln m |
125.00 |
5,000.00 |
260.00 |
10,400.00 |
116.00 |
4,640.00 |
255.00 |
10,200.00 |
| 701-05-G |
side drain pipe (450 mm)
|
101.1 |
ln m |
205.00 |
20,725.50 |
260.00 |
26,286.00 |
195.00 |
19,714.50 |
255.00 |
25,780.50 |
| 701-09 |
fabricating pipe fittings
|
8   |
ea |
1,350.00 |
10,800.00 |
1,600.00 |
12,800.00 |
1,200.00 |
9,600.00 |
2,050.00 |
16,400.00 |
| 701-14 |
cleaning existing pipes
|
397.0 |
ln m |
35.00 |
13,895.00 |
11.00 |
4,367.00 |
130.00 |
51,610.00 |
85.00 |
33,745.00 |
| 702-02-F |
manholes (mh-01m)
|
1   |
ea |
3,600.00 |
3,600.00 |
3,650.00 |
3,650.00 |
3,300.00 |
3,300.00 |
3,570.00 |
3,570.00 |
| 702-03-A |
catch basins (cb-01m)
|
23   |
ea |
2,200.00 |
50,600.00 |
2,400.00 |
55,200.00 |
2,000.00 |
46,000.00 |
3,100.00 |
71,300.00 |
| 704-03 |
blocked out guard rail
|
457.20 |
ln m |
65.00 |
29,718.00 |
62.00 |
28,346.40 |
60.00 |
27,432.00 |
60.00 |
27,432.00 |
| 704-08-B |
guard rail transition (double thrie beam)
|
60.96 |
ln m |
170.00 |
10,363.20 |
160.00 |
9,753.60 |
155.00 |
9,448.80 |
155.00 |
9,448.80 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
ea |
2,200.00 |
17,600.00 |
2,100.00 |
16,800.00 |
2,000.00 |
16,000.00 |
2,000.00 |
16,000.00 |
| 705-02 |
combination mesh & barbed wire fence
|
653   |
ln m |
21.00 |
13,713.00 |
20.00 |
13,060.00 |
25.00 |
16,325.00 |
20.00 |
13,060.00 |
| 706-03-A |
incidental concrete paving (100 mm thick)
|
172.5 |
sq m |
55.00 |
9,487.50 |
51.00 |
8,797.50 |
95.00 |
16,387.50 |
102.00 |
17,595.00 |
| 708-01 |
right-of-way monuments
|
14   |
ea |
450.00 |
6,300.00 |
180.00 |
2,520.00 |
140.00 |
1,960.00 |
120.00 |
1,680.00 |
| 708-02 |
right-of-way monument witness posts
|
14   |
ea |
450.00 |
6,300.00 |
70.00 |
980.00 |
20.00 |
280.00 |
120.00 |
1,680.00 |
| 712-04 |
flexible revetment
|
286   |
sq m |
80.00 |
22,880.00 |
80.00 |
22,880.00 |
75.00 |
21,450.00 |
80.00 |
22,880.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
275,000.00 |
275,000.00 |
120,000.00 |
120,000.00 |
50,000.00 |
50,000.00 |
31,605.00 |
31,605.00 |
| 713-02-A |
temporary pavement markings (100mm width)
|
3,353   |
ln m |
2.00 |
6,706.00 |
1.25 |
4,191.25 |
1.20 |
4,023.60 |
1.20 |
4,023.60 |
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
203   |
ea |
740.00 |
150,220.00 |
700.00 |
142,100.00 |
800.00 |
162,400.00 |
780.00 |
158,340.00 |
| 713-10 |
temporary precast concrete barrier movement
|
203   |
ea |
30.00 |
6,090.00 |
40.00 |
8,120.00 |
100.00 |
20,300.00 |
190.00 |
38,570.00 |
| 716-01-A |
mulch (vegetative)
|
136,026.0 |
kg |
0.55 |
74,814.30 |
0.52 |
70,733.52 |
0.50 |
68,013.00 |
1.20 |
163,231.20 |
| 717-01 |
seeding
|
907   |
kg |
23.00 |
20,861.00 |
23.00 |
20,861.00 |
17.50 |
15,872.50 |
21.00 |
19,047.00 |
| 718-01 |
fertilizer
|
136,026   |
kg |
0.65 |
88,416.90 |
0.65 |
88,416.90 |
0.90 |
122,423.40 |
0.20 |
27,205.20 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
92,989   |
sq m |
2.00 |
185,978.00 |
2.00 |
185,978.00 |
1.75 |
162,730.75 |
1.40 |
130,184.60 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
85,000.00 |
85,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
36,000.00 |
36,000.00 |
| 726-01 |
bedding material
|
467.0 |
cu m |
100.00 |
46,700.00 |
100.00 |
46,700.00 |
150.00 |
70,050.00 |
155.00 |
72,385.00 |
| 727-01 |
mobilization
|
lump |
lump |
1,600,000.00 |
1,600,000.00 |
1,700,000.00 |
1,700,000.00 |
1,825,000.00 |
1,825,000.00 |
2,300,000.00 |
2,300,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
43   |
ea |
80.00 |
3,440.00 |
80.00 |
3,440.00 |
75.00 |
3,225.00 |
75.00 |
3,225.00 |
| 729-19-A |
dead end road installation (type a)
|
1   |
ea |
1,500.00 |
1,500.00 |
1,400.00 |
1,400.00 |
1,350.00 |
1,350.00 |
1,350.00 |
1,350.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,252   |
ea |
5.50 |
12,386.00 |
5.00 |
11,260.00 |
4.50 |
10,134.00 |
4.50 |
10,134.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
30.601 |
km |
2,000.00 |
61,202.00 |
1,600.00 |
48,961.60 |
1,500.00 |
45,901.50 |
1,500.00 |
45,901.50 |
| 732-02-C |
plastic pavement striping (solid line)(200 mm width)
|
0.100 |
km |
3,800.00 |
380.00 |
3,300.00 |
330.00 |
3,200.00 |
320.00 |
3,200.00 |
320.00 |
| 732-02-E |
plastic pavement striping (solid line)(600 mm width)
|
0.341 |
km |
13,500.00 |
4,603.50 |
10,000.00 |
3,410.00 |
9,770.00 |
3,331.57 |
9,800.00 |
3,341.80 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
19.299 |
km |
500.00 |
9,649.50 |
625.00 |
12,061.88 |
600.00 |
11,579.40 |
600.00 |
11,579.40 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
ea |
200.00 |
800.00 |
210.00 |
840.00 |
200.00 |
800.00 |
200.00 |
800.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
ea |
220.00 |
880.00 |
210.00 |
840.00 |
200.00 |
800.00 |
200.00 |
800.00 |
| 732-05 |
removal of existing markings
|
9.996 |
km |
3,900.00 |
38,984.40 |
2,500.00 |
24,990.00 |
2,400.00 |
23,990.40 |
2,400.00 |
23,990.40 |
| 740-01 |
construction layout
|
lump |
lump |
300,000.00 |
300,000.00 |
175,000.00 |
175,000.00 |
125,000.00 |
125,000.00 |
270,000.00 |
270,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
784.0 |
ln m |
132.00 |
103,488.00 |
210.00 |
164,640.00 |
200.00 |
156,800.00 |
265.00 |
207,760.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
2,860.0 |
ln m |
250.00 |
715,000.00 |
410.00 |
1,172,600.00 |
400.00 |
1,144,000.00 |
260.00 |
743,600.00 |
| 804-05 |
precast concrete test piles
|
2   |
ea |
35,000.00 |
70,000.00 |
57,500.00 |
115,000.00 |
55,000.00 |
110,000.00 |
24,000.00 |
48,000.00 |
| 804-09 |
loading test piles
|
1   |
ea |
20,000.00 |
20,000.00 |
2,600.00 |
2,600.00 |
2,500.00 |
2,500.00 |
50,000.00 |
50,000.00 |
| 804-10 |
reloading test piles
|
1   |
ea |
1,000.00 |
1,000.00 |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
5,500.00 |
5,500.00 |
| 804-11 |
redriving test piles
|
1   |
ea |
100.00 |
100.00 |
1,050.00 |
1,050.00 |
1,000.00 |
1,000.00 |
3,000.00 |
3,000.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
100.00 |
100.00 |
1,050.00 |
1,050.00 |
1,000.00 |
1,000.00 |
22,000.00 |
22,000.00 |
| 804-17 |
dynamic monitoring
|
34   |
ea |
300.00 |
10,200.00 |
1,600.00 |
54,400.00 |
1,500.00 |
51,000.00 |
2,000.00 |
68,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
78.44 |
cu m |
1,400.00 |
109,816.00 |
1,600.00 |
125,504.00 |
1,350.00 |
105,894.00 |
2,604.17 |
204,271.09 |
| 805-01-F |
class a concrete (bents)
|
342.24 |
cu m |
690.00 |
236,145.60 |
1,000.00 |
342,240.00 |
930.00 |
318,283.20 |
1,240.00 |
424,377.60 |
| 805-03 |
class aa concrete
|
1,553.10 |
cu m |
700.00 |
1,087,170.00 |
900.00 |
1,397,790.00 |
840.00 |
1,304,604.00 |
750.00 |
1,164,825.00 |
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
757.50 |
ln m |
230.00 |
174,225.00 |
250.00 |
189,375.00 |
240.00 |
181,800.00 |
340.00 |
257,550.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
1,876.50 |
ln m |
285.00 |
534,802.50 |
350.00 |
656,775.00 |
340.00 |
638,010.00 |
400.00 |
750,600.00 |
| 805-11 |
strip seal joints
|
144.00 |
ln m |
350.00 |
50,400.00 |
525.00 |
75,600.00 |
500.00 |
72,000.00 |
705.00 |
101,520.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
60.00 |
ln m |
1,900.00 |
114,000.00 |
1,700.00 |
102,000.00 |
2,200.00 |
132,000.00 |
2,400.00 |
144,000.00 |
| 805-12-X |
reinforced concrete box culverts (3000 mm x 3000 mm)
|
142.00 |
ln m |
3,000.00 |
426,000.00 |
3,300.00 |
468,600.00 |
3,150.00 |
447,300.00 |
4,700.00 |
667,400.00 |
| 805-12-Y |
reinforced concrete box culverts (3000mm x 2100mm)
(extension) |
46.00 |
ln m |
3,100.00 |
142,600.00 |
3,200.00 |
147,200.00 |
2,800.00 |
128,800.00 |
4,400.00 |
202,400.00 |
| 806-01 |
deformed reinforcing steel
|
254,880   |
kg |
1.85 |
471,528.00 |
2.25 |
573,480.00 |
2.10 |
535,248.00 |
1.96 |
499,564.80 |
| 807-08 |
structural metalwork
|
lump |
lump |
20,000.00 |
20,000.00 |
8,500.00 |
8,500.00 |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
| 810-01 |
concrete railing (standard barrier)
|
1,103.20 |
ln m |
176.00 |
194,163.20 |
180.00 |
198,576.00 |
175.00 |
193,060.00 |
155.00 |
170,996.00 |
| 813-01 |
concrete approach slabs
|
576.00 |
sq m |
240.00 |
138,240.00 |
265.00 |
152,640.00 |
245.00 |
141,120.00 |
220.00 |
126,720.00 |
| S-001 |
rumble strips(ground-in)
|
18.3 |
km |
400.00 |
7,320.00 |
425.00 |
7,777.50 |
300.00 |
5,490.00 |
248.00 |
4,538.40 |
| S-002 |
dynamic message sign unit
|
2   |
ea |
15,000.00 |
30,000.00 |
525.00 |
1,050.00 |
18,000.00 |
36,000.00 |
20,000.00 |
40,000.00 |
| S-003 |
sawcut asphalt pavement (per 25mm depth)
|
16,320   |
ln m |
0.60 |
9,792.00 |
0.85 |
13,872.00 |
1.75 |
28,560.00 |
6.50 |
106,080.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
16,789,962.53 |
|
17,526,904.83 |
|
18,293,645.87 |
|
22,231,354.05 |
|