| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - KEY CONSTRUCTORS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
250,000.00 |
250,000.00 |
235,000.00 |
235,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
35,000.00 |
35,000.00 |
13,000.00 |
13,000.00 |
10,000.00 |
10,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 1+450.21: 23.8m x 5.8m treated
timber trestle) |
1   |
ea |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| 202-02-A-02 |
removal of bridge (sta. 1+621.80: 35.4m x 5.8m treated
timber trestle) |
1   |
ea |
52,000.00 |
52,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-03 |
removal of bridge (sta. 2+369.52: 11.9m x 7.6m treated
timber trestle) |
1   |
ea |
7,000.00 |
7,000.00 |
20,000.00 |
20,000.00 |
8,000.00 |
8,000.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
3,911.4 |
sq m |
6.25 |
24,446.25 |
10.00 |
39,114.00 |
8.00 |
31,291.20 |
|
|
| 203-01 |
general excavation (plan quantity)
|
4,276   |
cu m |
12.00 |
51,312.00 |
12.00 |
51,312.00 |
10.00 |
42,760.00 |
|
|
| 203-03 |
embankment (plan quantity)
|
18,637   |
cu m |
17.00 |
316,829.00 |
26.00 |
484,562.00 |
36.00 |
670,932.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
25   |
ea |
330.00 |
8,250.00 |
80.00 |
2,000.00 |
150.00 |
3,750.00 |
|
|
| 204-06 |
temporary silt fencing
|
3,000   |
ln m |
24.00 |
72,000.00 |
5.00 |
15,000.00 |
10.00 |
30,000.00 |
|
|
| 302-02-D |
class ii base course (220 mm thick)
|
12,098.5 |
sq m |
32.00 |
387,152.00 |
30.00 |
362,955.00 |
42.00 |
508,137.00 |
|
|
| 304-05 |
lime treatment (type e)
|
936.92 |
Mg |
100.00 |
93,692.00 |
10.00 |
9,369.20 |
225.00 |
210,807.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
21   |
cu m |
100.00 |
2,100.00 |
150.00 |
3,150.00 |
100.00 |
2,100.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
cu m |
100.00 |
5,000.00 |
100.00 |
5,000.00 |
115.00 |
5,750.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,875.1 |
Mg |
100.00 |
487,510.00 |
105.00 |
511,885.50 |
170.00 |
828,767.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
339.9 |
Mg |
170.00 |
57,783.00 |
165.00 |
56,083.50 |
250.00 |
84,975.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
5,384   |
sq m |
3.00 |
16,152.00 |
5.00 |
26,920.00 |
7.00 |
37,688.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement 50%
|
- 135   |
cu m |
0.10 |
- 13.50 |
1.00 |
- 135.00 |
0.00 |
0.00 |
|
|
| 510-01-B |
pavement patching (300 mm minimum thickness)
|
100   |
sq m |
150.00 |
15,000.00 |
165.00 |
16,500.00 |
300.00 |
30,000.00 |
|
|
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
19.4 |
ln m |
400.00 |
7,760.00 |
560.00 |
10,864.00 |
550.00 |
10,670.00 |
|
|
| 701-02-H |
cross drain pipe arch (1200 mm equiv. rcpa)
|
16.5 |
ln m |
900.00 |
14,850.00 |
1,450.00 |
23,925.00 |
850.00 |
14,025.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
89.4 |
ln m |
155.00 |
13,857.00 |
225.00 |
20,115.00 |
215.00 |
19,221.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
35.6 |
ln m |
190.00 |
6,764.00 |
270.00 |
9,612.00 |
250.00 |
8,900.00 |
|
|
| 702-07-A |
cross drain safety end (type 1)
|
2   |
ea |
5,550.00 |
11,100.00 |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
|
|
| 702-07-B |
cross drain safety end (type 2)
|
2   |
ea |
2,250.00 |
4,500.00 |
5,000.00 |
10,000.00 |
5,700.00 |
11,400.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
7   |
ea |
2,000.00 |
14,000.00 |
2,000.00 |
14,000.00 |
2,500.00 |
17,500.00 |
|
|
| 704-03 |
blocked out guard rail
|
323.61 |
ln m |
65.00 |
21,034.65 |
80.00 |
25,888.80 |
66.00 |
21,358.26 |
|
|
| 704-08-B |
guard rail transition (double thrie beam)
|
60.96 |
ln m |
175.00 |
10,668.00 |
200.00 |
12,192.00 |
195.00 |
11,887.20 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
each |
2,750.00 |
11,000.00 |
3,500.00 |
14,000.00 |
2,500.00 |
10,000.00 |
|
|
| 705-06-A |
chain link fence (1200 mm height)
|
94   |
ln m |
70.00 |
6,580.00 |
80.00 |
7,520.00 |
72.00 |
6,768.00 |
|
|
| 705-08-A |
1.5-meter double gates for chain link fence (1200 mm
height) |
1   |
dbgt |
550.00 |
550.00 |
600.00 |
600.00 |
800.00 |
800.00 |
|
|
| 708-01 |
right-of-way monument
|
32   |
ea |
150.00 |
4,800.00 |
150.00 |
4,800.00 |
250.00 |
8,000.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
32   |
ea |
55.00 |
1,760.00 |
100.00 |
3,200.00 |
200.00 |
6,400.00 |
|
|
| 711-01-C |
riprap (15 kg, 300 mm thick)
|
282   |
sq m |
90.00 |
25,380.00 |
70.00 |
19,740.00 |
100.00 |
28,200.00 |
|
|
| 711-04 |
geotextile fabric
|
282   |
sq m |
4.00 |
1,128.00 |
3.00 |
846.00 |
4.25 |
1,198.50 |
|
|
| 712-04 |
flexible revetment
|
1,260.0 |
sq m |
95.00 |
119,700.00 |
88.00 |
110,880.00 |
95.00 |
119,700.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
75,000.00 |
75,000.00 |
120,000.00 |
120,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 |
1.800 |
km |
250.00 |
450.00 |
350.00 |
630.00 |
235.00 |
423.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
3.600 |
km |
500.00 |
1,800.00 |
400.00 |
1,440.00 |
480.00 |
1,728.00 |
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
150   |
ea |
3.50 |
525.00 |
6.00 |
900.00 |
3.75 |
562.50 |
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
105   |
ea |
500.00 |
52,500.00 |
400.00 |
42,000.00 |
525.00 |
55,125.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| 726-01 |
bedding material
|
241.9 |
cu m |
135.00 |
32,656.50 |
150.00 |
36,285.00 |
110.00 |
26,609.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
490,000.00 |
490,000.00 |
490,000.00 |
490,000.00 |
325,000.00 |
325,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
65.00 |
260.00 |
55.00 |
220.00 |
65.00 |
260.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
80.00 |
640.00 |
90.00 |
720.00 |
75.00 |
600.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
140   |
ea |
5.50 |
770.00 |
6.00 |
840.00 |
5.10 |
714.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
3.213 |
km |
1,900.00 |
6,104.70 |
2,000.00 |
6,426.00 |
1,810.00 |
5,815.53 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
1.608 |
km |
500.00 |
804.00 |
700.00 |
1,125.60 |
472.00 |
758.98 |
|
|
| 735-01 |
mailboxes
|
5   |
ea |
6.50 |
32.50 |
12.00 |
60.00 |
250.00 |
1,250.00 |
|
|
| 735-02 |
mailbox supports (single)
|
1   |
ea |
170.00 |
170.00 |
200.00 |
200.00 |
250.00 |
250.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
ea |
300.00 |
300.00 |
330.00 |
330.00 |
500.00 |
500.00 |
|
|
| 739-01 |
hydro-seeding
|
2   |
hctr |
3,000.00 |
6,000.00 |
4,000.00 |
8,000.00 |
3,800.00 |
7,600.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
75,000.00 |
75,000.00 |
60,000.00 |
60,000.00 |
75,000.00 |
75,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
2,002.50 |
ln m |
175.00 |
350,437.50 |
185.00 |
370,462.50 |
190.00 |
380,475.00 |
|
|
| 804-05 |
precast concrete test piles (400 mm)
|
1   |
ea |
16,000.00 |
16,000.00 |
16,000.00 |
16,000.00 |
25,000.00 |
25,000.00 |
|
|
| 804-09 |
loading test piles
|
1   |
ea |
18,000.00 |
18,000.00 |
18,000.00 |
18,000.00 |
20,000.00 |
20,000.00 |
|
|
| 804-10 |
reloading test piles
|
1   |
ea |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
|
|
| 804-11 |
redriving test piles
|
1   |
ea |
3,000.00 |
3,000.00 |
3,200.00 |
3,200.00 |
2,000.00 |
2,000.00 |
|
|
| 804-12 |
loading permanent piles
|
3   |
ea |
10,000.00 |
30,000.00 |
11,000.00 |
33,000.00 |
5,000.00 |
15,000.00 |
|
|
| 804-17 |
dynamic monitoring
|
3   |
each |
2,750.00 |
8,250.00 |
2,800.00 |
8,400.00 |
2,500.00 |
7,500.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.84 |
cu m |
3,000.00 |
56,520.00 |
2,000.00 |
37,680.00 |
1,600.00 |
30,144.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
112.08 |
cu m |
1,300.00 |
145,704.00 |
1,450.00 |
162,516.00 |
1,500.00 |
168,120.00 |
|
|
| 805-03 |
class aa concrete
|
506.34 |
cu m |
1,200.00 |
607,608.00 |
1,300.00 |
658,242.00 |
1,200.00 |
607,608.00 |
|
|
| 805-12-L |
reinforced concrete box culverts (2400 mm x 1500 mm)
|
107.20 |
ln m |
2,500.00 |
268,000.00 |
2,000.00 |
214,400.00 |
3,150.00 |
337,680.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
61,342   |
kg |
2.75 |
168,690.50 |
3.00 |
184,026.00 |
3.00 |
184,026.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
216.00 |
ln m |
225.00 |
48,600.00 |
240.00 |
51,840.00 |
250.00 |
54,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
590.40 |
sq m |
275.00 |
162,360.00 |
280.00 |
165,312.00 |
265.00 |
156,456.00 |
|
|
| S-001 |
dynamic message sign unit
|
4   |
ea |
13,000.00 |
52,000.00 |
11,000.00 |
44,000.00 |
16,000.00 |
64,000.00 |
|
|
| S-101 |
dynamic analysis
|
3   |
each |
2,750.00 |
8,250.00 |
2,800.00 |
8,400.00 |
2,500.00 |
7,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,909,077.10 |
|
4,950,554.10 |
|
5,569,690.17 |
|
|
|