| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CHAMBERS CONSTRUCTION CO., INC. |
- 2 - RMD HOLDINGS LTD |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
1,380   |
SQYD |
15.72 |
21,693.60 |
21.00 |
28,980.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
3,469.00 |
3,469.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
661.00 |
661.00 |
2,400.00 |
2,400.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
75.0 |
SQYD |
248.25 |
18,618.75 |
100.00 |
7,500.00 |
|
|
|
|
| 706-04 |
handicapped curb ramps
|
4.0 |
EACH |
2,518.00 |
10,072.00 |
1,800.00 |
7,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,510.00 |
8,510.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 717-01 |
seeding
|
5   |
LB |
108.40 |
542.00 |
75.00 |
375.00 |
|
|
|
|
| 718-01 |
fertilizer
|
110   |
LB |
6.20 |
682.00 |
21.00 |
2,310.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
9,110.00 |
9,110.00 |
23,967.70 |
23,967.70 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
85   |
LNFT |
15.90 |
1,351.50 |
1.05 |
89.25 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
91   |
LNFT |
23.60 |
2,147.60 |
2.10 |
191.10 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,760.00 |
3,760.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| S-001 |
solid trench cover
|
12   |
EACH |
984.00 |
11,808.00 |
1,500.00 |
18,000.00 |
|
|
|
|
| S-002 |
interlocking brick pavers
|
12,017   |
SQFT |
7.23 |
86,882.91 |
12.00 |
144,204.00 |
|
|
|
|
| S-003 |
sawcutting portland cement concrete pavement
|
7,800   |
INLF |
1.40 |
10,920.00 |
1.50 |
11,700.00 |
|
|
|
|
| S-004 |
concrete splash block
|
5   |
EACH |
325.00 |
1,625.00 |
250.00 |
1,250.00 |
|
|
|
|
| S-005 |
remove and replace concrete curb
|
27   |
LNFT |
64.60 |
1,744.20 |
120.00 |
3,240.00 |
|
|
|
|
| S-006 |
paved sidewalk concrete toe
|
776   |
LNFT |
7.32 |
5,680.32 |
9.00 |
6,984.00 |
|
|
|
|
| S-007 |
leveling sand base course
|
150.0 |
CUYD |
106.35 |
15,952.50 |
60.00 |
9,000.00 |
|
|
|
|
| S-008 |
temporary business entrances
|
lump |
LUMP |
3,525.00 |
3,525.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
218,755.38 |
|
288,391.05 |
|
|
|
|
|