Letting of 1/28/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 046-32-0037
Parish: ST BERNARD
Routes: LA 39
Description: JUDGE PEREZ (GUERENGER CANAL TO PARIS RD.)
Type Const: pcc rehabilitation,striping & related work
Estimated Construction Cost: $1,340,116.90
 
RankLicenseBidderConstruction Bid
1 25088 RCS CONTRACTORS, INC. $790,067.62
2 24901 HARD ROCK CONSTRUCTION CO. $807,483.50
3 21982 FORBY CONTRACTING, INC. $949,701.50
4 48896 COMMAND CONSTRUCTION INDUSTRIES LLC $1,073,333.33
5 44302 T-MAC, INC. $1,215,490.00
6 46547 INTERSTATE IMPROVEMENT, INC. $1,273,837.36
 
Item Number Item Description Quantity Unit of Measure - 1 -
RCS CONTRACTORS, INC.
- 2 -
HARD ROCK CONSTRUCTION CO.
- 3 -
FORBY CONTRACTING, INC.
- 4 -
COMMAND CONSTRUCTION INDUSTRIES LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 2,169.0    LNFT 10.00 21,690.00 14.00 30,366.00 5.00 10,845.00 2.00 4,338.00
203-07 borrow (vehicular measurement) 200      CUYD 20.00 4,000.00 20.00 4,000.00 25.00 5,000.00 50.00 10,000.00
601-01-I portland cement concrete pavement (9" thick) 10.0    SQYD 80.00 800.00 150.00 1,500.00 150.00 1,500.00 500.00 5,000.00
602-02-A cleaning and resealing existing longitudinal pavement
joints
21,500      LNFT 1.80 38,700.00 1.50 32,250.00 1.50 32,250.00 1.50 32,250.00
602-02-B cleaning and resealing existing transverse pavement
joints
26,000      LNFT 1.80 46,800.00 1.50 39,000.00 1.75 45,500.00 1.50 39,000.00
602-03 cleaning and sealing cracks 2,000      LNFT 3.00 6,000.00 1.50 3,000.00 3.00 6,000.00 2.50 5,000.00
602-05-I-01 full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under)
1,030.0    SQYD 160.00 164,800.00 185.00 190,550.00 175.00 180,250.00 200.00 206,000.00
602-05-I-02 full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds)
670.0    SQYD 150.00 100,500.00 185.00 123,950.00 155.00 103,850.00 170.00 113,900.00
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
680.0    SQYD 120.00 81,600.00 185.00 125,800.00 150.00 102,000.00 130.00 88,400.00
702-04-A adjusting manholes 38      EACH 500.00 19,000.00 500.00 19,000.00 750.00 28,500.00 1,500.00 57,000.00
702-04-B adjusting catch basins 67      EACH 1,200.00 80,400.00 1,000.00 67,000.00 2,000.00 134,000.00 1,750.00 117,250.00
706-03-C incidental concrete paving (6" thick) 25.0    SQYD 90.00 2,250.00 150.00 3,750.00 125.00 3,125.00 100.00 2,500.00
707-01 concrete curb 2,344.0    LNFT 15.00 35,160.00 15.00 35,160.00 15.00 35,160.00 10.00 23,440.00
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 10,000.00 10,000.00 49,700.00 49,700.00 75,277.83 75,277.83
713-02-C temporary pavement markings (8" width) 5,250      LNFT 0.35 1,837.50 0.00 0.00 0.20 1,050.00 0.25 1,312.50
713-02-E temporary pavement markings (24" width) 360      LNFT 1.05 378.00 0.00 0.00 1.00 360.00 1.25 450.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.020  MILE 360.00 1,447.20 0.00 0.00 325.00 1,306.50 350.00 1,407.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.020  MILE 800.00 3,216.00 0.00 0.00 325.00 1,306.50 350.00 1,407.00
713-04-A temporary pavement markings (solid line)(4" width) 8.040  MILE 800.00 6,432.00 0.00 0.00 400.00 3,216.00 450.00 3,618.00
713-05-A temporary pavement legends and symbols (arrow) 38      EACH 60.00 2,280.00 0.00 0.00 100.00 3,800.00 125.00 4,750.00
713-05-C temporary pavement legends and symbols (only) 21      EACH 60.00 1,260.00 0.00 0.00 100.00 2,100.00 125.00 2,625.00
713-05-E temporary pavement legends and symbols (school
crossing)
1      EACH 82.00 82.00 0.00 0.00 150.00 150.00 175.00 175.00
727-01 mobilization lump      LUMP 25,000.00 25,000.00 25,000.00 25,000.00 90,000.00 90,000.00 100,000.00 100,000.00
731-02 reflectorized raised pavement markers 1,185      EACH 5.80 6,873.00 5.50 6,517.50 5.50 6,517.50 6.00 7,110.00
732-01-C plastic pavement striping (8" width) 5,250      LNFT 1.20 6,300.00 1.25 6,562.50 1.25 6,562.50 1.50 7,875.00
732-01-E plastic pavement striping (24" width) 360      LNFT 4.20 1,512.00 4.00 1,440.00 4.00 1,440.00 4.50 1,620.00
732-02-A plastic pavement striping (solid line) (4" width) 8.040  MILE 3,200.00 25,728.00 2,400.00 19,296.00 2,400.00 19,296.00 2,700.00 21,708.00
732-03-A plastic pavement striping (broken line)(4" width) 4.020  MILE 840.00 3,376.80 825.00 3,316.50 825.00 3,316.50 1,000.00 4,020.00
732-04-A plastic pavement legends & symbols (arrow) 38      EACH 42.00 1,596.00 225.00 8,550.00 225.00 8,550.00 250.00 9,500.00
732-04-C plastic pavement legends & symbols (only) 21      EACH 25.00 525.00 225.00 4,725.00 225.00 4,725.00 250.00 5,250.00
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 500.00 500.00 450.00 450.00 450.00 450.00 500.00 500.00
732-05 removal of existing markings 4.020  MILE 6.00 24.12 0.00 0.00 6,250.00 25,125.00 7,500.00 30,150.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 8,000.00 8,000.00 2,500.00 2,500.00 25,000.00 25,000.00
S-001 grading and sloping median embankment 10,000      SQYD 2.00 20,000.00 1.50 15,000.00 1.00 10,000.00 1.50 15,000.00
S-002 grading and sloping r/w embankment 10,000      SQYD 2.00 20,000.00 1.50 15,000.00 1.00 10,000.00 3.00 30,000.00
S-003 remove existing median 10.0    SQYD 200.00 2,000.00 150.00 1,500.00 25.00 250.00 50.00 500.00
S-004 dynamic message sign unit 2      EACH 4,000.00 8,000.00 3,400.00 6,800.00 5,000.00 10,000.00 10,000.00 20,000.00
                       
 CONTRACTOR TOTAL       790,067.62   807,483.50   949,701.50   1,073,333.33
 
Item Number Item Description Quantity Unit of Measure - 5 -
T-MAC, INC.
- 6 -
INTERSTATE IMPROVEMENT, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-E removal of concrete curbs 2,169.0    LNFT 7.00 15,183.00 6.00 13,014.00        
203-07 borrow (vehicular measurement) 200      CUYD 35.00 7,000.00 25.00 5,000.00        
601-01-I portland cement concrete pavement (9" thick) 10.0    SQYD 250.00 2,500.00 275.00 2,750.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
21,500      LNFT 1.75 37,625.00 1.50 32,250.00        
602-02-B cleaning and resealing existing transverse pavement
joints
26,000      LNFT 2.15 55,900.00 1.75 45,500.00        
602-03 cleaning and sealing cracks 2,000      LNFT 4.00 8,000.00 2.50 5,000.00        
602-05-I-01 full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under)
1,030.0    SQYD 205.00 211,150.00 180.00 185,400.00        
602-05-I-02 full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds)
670.0    SQYD 180.00 120,600.00 180.00 120,600.00        
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
680.0    SQYD 170.00 115,600.00 180.00 122,400.00        
702-04-A adjusting manholes 38      EACH 1,500.00 57,000.00 350.00 13,300.00        
702-04-B adjusting catch basins 67      EACH 2,600.00 174,200.00 350.00 23,450.00        
706-03-C incidental concrete paving (6" thick) 25.0    SQYD 100.00 2,500.00 275.00 6,875.00        
707-01 concrete curb 2,344.0    LNFT 22.00 51,568.00 25.00 58,600.00        
713-01 temporary signs & barricades lump      LUMP 78,000.00 78,000.00 104,851.00 104,851.00        
713-02-C temporary pavement markings (8" width) 5,250      LNFT 0.35 1,837.50 0.30 1,575.00        
713-02-E temporary pavement markings (24" width) 360      LNFT 1.00 360.00 0.95 342.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.020  MILE 400.00 1,608.00 325.00 1,306.50        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.020  MILE 400.00 1,608.00 325.00 1,306.50        
713-04-A temporary pavement markings (solid line)(4" width) 8.040  MILE 850.00 6,834.00 725.00 5,829.00        
713-05-A temporary pavement legends and symbols (arrow) 38      EACH 55.00 2,090.00 50.00 1,900.00        
713-05-C temporary pavement legends and symbols (only) 21      EACH 55.00 1,155.00 50.00 1,050.00        
713-05-E temporary pavement legends and symbols (school
crossing)
1      EACH 100.00 100.00 75.00 75.00        
727-01 mobilization lump      LUMP 115,000.00 115,000.00 66,500.00 66,500.00        
731-02 reflectorized raised pavement markers 1,185      EACH 6.00 7,110.00 5.10 6,043.50        
732-01-C plastic pavement striping (8" width) 5,250      LNFT 1.15 6,037.50 1.05 5,512.50        
732-01-E plastic pavement striping (24" width) 360      LNFT 3.50 1,260.00 3.95 1,422.00        
732-02-A plastic pavement striping (solid line) (4" width) 8.040  MILE 3,000.00 24,120.00 2,904.00 23,348.16        
732-03-A plastic pavement striping (broken line)(4" width) 4.020  MILE 700.00 2,814.00 760.00 3,055.20        
732-04-A plastic pavement legends & symbols (arrow) 38      EACH 220.00 8,360.00 195.00 7,410.00        
732-04-C plastic pavement legends & symbols (only) 21      EACH 250.00 5,250.00 210.00 4,410.00        
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 500.00 500.00 450.00 450.00        
732-05 removal of existing markings 4.020  MILE 6,000.00 24,120.00 5,200.00 20,904.00        
740-01 construction layout lump      LUMP 25,000.00 25,000.00 1,000.00 1,000.00        
S-001 grading and sloping median embankment 10,000      SQYD 1.25 12,500.00 12.00 120,000.00        
S-002 grading and sloping r/w embankment 10,000      SQYD 1.25 12,500.00 25.00 250,000.00        
S-003 remove existing median 10.0    SQYD 150.00 1,500.00 29.00 290.00        
S-004 dynamic message sign unit 2      EACH 8,500.00 17,000.00 5,559.00 11,118.00        
                       
 CONTRACTOR TOTAL       1,215,490.00   1,273,837.36        