Letting of 1/28/2009 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 031-09-0028
Parish: BEAUREGARD
Routes: LA 27
Description: TIMBER ROCK RAILROAD OVERPASS REMOVAL & PAVEMENT REHAB.
Type Const: grading, cold planing, class ii base course, in-place stabilized base course, lime
treatment, superpave asphaltic concrete, and related work.
Estimated Construction Cost: $7,836,287.90
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $5,744,753.44
2 08815 W. E. MCDONALD & SON, LLC. $5,889,488.03
3 12312 GILCHRIST CONSTRUCTION CO. LLC $6,014,572.55
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 27,000.00 27,000.00 100,000.00 100,000.00 75,000.00 75,000.00    
202-01 removal of structures & obstructions lump      LUMP 30,000.00 30,000.00 50,000.00 50,000.00 20,000.00 20,000.00    
202-02-A-01 removal of bridges (sta 116+54, 25' x 293' concrete
bridge w/ timber piles)
1      EACH 200,000.00 200,000.00 275,000.00 275,000.00 160,000.00 160,000.00    
202-02-D removal of concrete walks & drives 108      SQYD 19.00 2,052.00 25.00 2,700.00 11.00 1,188.00    
202-02-G removal of surfacing & stabilized base 6,561.3    SQYD 4.00 26,245.20 5.00 32,806.50 7.00 45,929.10    
202-02-H removal of guard rail 557      LNFT 7.00 3,899.00 3.00 1,671.00 13.00 7,241.00    
203-01 general excavation 91,450      CUYD 4.00 365,800.00 5.00 457,250.00 1.80 164,610.00    
203-03 embankment 11,915      CUYD 7.00 83,405.00 10.00 119,150.00 6.00 71,490.00    
204-05-A temporary sediment check dams (hay) 4      EACH 165.00 660.00 500.00 2,000.00 200.00 800.00    
204-06 temporary silt fencing 837      LNFT 6.00 5,022.00 2.00 1,674.00 2.00 1,674.00    
302-02-A-01 class ii base course (4" thick) (crushed stone or
recycled pccp)
12,425.0    SQYD 11.00 136,675.00 10.00 124,250.00 12.20 151,585.00    
302-02-D-01 class ii base course (8 1/2" thick) (soil cement) 11,585.2    SQYD 14.00 162,192.80 12.00 139,022.40 11.00 127,437.20    
303-01-B in-place cement stabilized base course (8 1/2" thick) 82,593      SQYD 5.75 474,909.75 6.14 507,121.02 6.75 557,502.75    
304-01 lime 1,131.74   TON 1.00 1,131.74 170.00 192,395.80 100.00 113,174.00    
304-04-D lime treatment (type d) (12" thick) 83,452      SQYD 0.10 8,345.20 3.00 250,356.00 1.35 112,660.20    
402-01 traffic maintenance aggregate (vehicular measurement) 900.0    CUYD 12.00 10,800.00 1.00 900.00 25.00 22,500.00    
502-01 superpave asphaltic concrete 36,258.5    TON 90.00 3,263,265.00 83.00 3,009,455.50 87.00 3,154,489.50    
502-01-A superpave asphaltic concrete, drives, turnouts, and
misc.
673.3    TON 100.00 67,330.00 150.00 100,995.00 165.00 111,094.50    
509-01 cold planing asphaltic pavement 83,436      SQYD 2.00 166,872.00 0.50 41,718.00 0.80 66,748.80    
509-02 contractor retained reclaimed asphaltic pavement - 11,299      CUYD 0.10 - 1,129.90 0.01 - 112.99 1.00 - 11,299.00    
701-01-I/K cross drain pipe (24" rcp/pcp or 30" cmp) 144      LNFT 120.00 17,280.00 75.00 10,800.00 160.00 23,040.00    
701-05-G side drain pipe (18") 188      LNFT 55.00 10,340.00 48.00 9,024.00 80.00 15,040.00    
701-05-I side drain pipe (24") 56      LNFT 68.00 3,808.00 56.00 3,136.00 135.00 7,560.00    
704-03 blocked out guard rail 225.0    LNFT 45.00 10,125.00 22.00 4,950.00 44.00 9,900.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 37.00 3,700.00 57.00 5,700.00 37.00 3,700.00    
704-11-B guard rail end treatment (tangent) 4      EACH 1,900.00 7,600.00 2,500.00 10,000.00 2,000.00 8,000.00    
705-03 single swinging walk gates 1      EACH 525.00 525.00 500.00 500.00 500.00 500.00    
705-06-A chain link fence (4-foot height) 116      LNFT 25.00 2,900.00 20.00 2,320.00 21.00 2,436.00    
708-01 right-of-way monument 11      EACH 150.00 1,650.00 250.00 2,750.00 400.00 4,400.00    
708-02 right-of-way monument witness post 11      EACH 52.00 572.00 250.00 2,750.00 400.00 4,400.00    
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 28,000.00 28,000.00 125,000.00 125,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
16.410  MILE 150.00 2,461.50 400.00 6,564.00 200.00 3,282.00    
713-04-A temporary pavement markings (solid line)(4" width) 32.820  MILE 600.00 19,692.00 600.00 19,692.00 400.00 13,128.00    
713-05-D temporary pavement legends and symbols (rr crossing) 2      EACH 100.00 200.00 100.00 200.00 210.00 420.00    
713-06 temporary reflectorized raised pavement markers 57      EACH 5.00 285.00 4.50 256.50 5.50 313.50    
713-07 temporary precast concrete barrier (contractor
furnished)
67      EACH 950.00 63,650.00 700.00 46,900.00 950.00 63,650.00    
722-02 project site laboratory (equipped) 1      EACH 17,500.00 17,500.00 6,000.00 6,000.00 25,000.00 25,000.00    
727-01 mobilization lump      LUMP 284,000.00 284,000.00 100,000.00 100,000.00 500,000.00 500,000.00    
729-16-B object marker assembly (type 2) 8      EACH 52.00 416.00 75.00 600.00 50.00 400.00    
731-02 reflectorized raised pavement markers 722      EACH 5.00 3,610.00 4.50 3,249.00 6.00 4,332.00    
732-01-E plastic pavement striping (24" width) 72      LNFT 3.25 234.00 3.00 216.00 5.00 360.00    
732-02-A plastic pavement striping (solid line) (4" width) 12.069  MILE 2,350.00 28,362.15 2,200.00 26,551.80 2,500.00 30,172.50    
732-03-A plastic pavement striping (broken line)(4" width) 5.470  MILE 625.00 3,418.75 600.00 3,282.00 850.00 4,649.50    
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 400.00 800.00 375.00 750.00 425.00 850.00    
735-01 mailboxes 48      EACH 1.00 48.00 1.00 48.00 1.00 48.00    
735-02 mailbox supports (single) 42      EACH 100.00 4,200.00 120.00 5,040.00 115.00 4,830.00    
735-03 mailbox supports (double) 3      EACH 130.00 390.00 175.00 525.00 130.00 390.00    
739-01 hydro-seeding 8.49   ACRE 1,100.00 9,339.00 1,100.00 9,339.00 1,200.00 10,188.00    
740-01 construction layout lump      LUMP 47,000.00 47,000.00 7,000.00 7,000.00 35,000.00 35,000.00    
741-08 relocating water meter 5      EACH 400.00 2,000.00 500.00 2,500.00 500.00 2,500.00    
741-09 adjusting water house connections 3      EACH 415.00 1,245.00 400.00 1,200.00 400.00 1,200.00    
741-10 adjusting water service lines 300      LNFT 6.00 1,800.00 6.00 1,800.00 25.00 7,500.00    
741-11 adjusting water valve and meter box 3      EACH 500.00 1,500.00 500.00 1,500.00 700.00 2,100.00    
742-02 adjusting sanitary sewer house connections 3      EACH 300.00 900.00 300.00 900.00 500.00 1,500.00    
742-03 adjusting sanitary sewer service lines 300      LNFT 8.00 2,400.00 8.00 2,400.00 25.00 7,500.00    
805-01-B class a concrete (box culvert headwalls) 12.34   CUYD 1,100.00 13,574.00 1,000.00 12,340.00 1,400.00 17,276.00    
805-12-M-01 reinforced concrete box culverts (6'x 6') (extension)
(4 barrell)
144.0    LNFT 600.00 86,400.00 700.00 100,800.00 600.00 86,400.00    
806-01 deformed reinforcing steel 1,141      LB 3.25 3,708.25 2.50 2,852.50 2.00 2,282.00    
S-001 adjusting gas house connections 3      EACH 415.00 1,245.00 400.00 1,200.00 2,000.00 6,000.00    
S-002 adjusting gas service line 100      LNFT 14.00 1,400.00 15.00 1,500.00 25.00 2,500.00    
S-003 impact attenuators (construction zone) 2      EACH 10,000.00 20,000.00 18,000.00 36,000.00 11,500.00 23,000.00    
                       
 CONTRACTOR TOTAL       5,744,753.44   5,889,488.03   6,014,572.55    