| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
27,000.00 |
27,000.00 |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta 116+54, 25' x 293' concrete
bridge w/ timber piles) |
1   |
EACH |
200,000.00 |
200,000.00 |
275,000.00 |
275,000.00 |
160,000.00 |
160,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
108   |
SQYD |
19.00 |
2,052.00 |
25.00 |
2,700.00 |
11.00 |
1,188.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
6,561.3 |
SQYD |
4.00 |
26,245.20 |
5.00 |
32,806.50 |
7.00 |
45,929.10 |
|
|
| 202-02-H |
removal of guard rail
|
557   |
LNFT |
7.00 |
3,899.00 |
3.00 |
1,671.00 |
13.00 |
7,241.00 |
|
|
| 203-01 |
general excavation
|
91,450   |
CUYD |
4.00 |
365,800.00 |
5.00 |
457,250.00 |
1.80 |
164,610.00 |
|
|
| 203-03 |
embankment
|
11,915   |
CUYD |
7.00 |
83,405.00 |
10.00 |
119,150.00 |
6.00 |
71,490.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
165.00 |
660.00 |
500.00 |
2,000.00 |
200.00 |
800.00 |
|
|
| 204-06 |
temporary silt fencing
|
837   |
LNFT |
6.00 |
5,022.00 |
2.00 |
1,674.00 |
2.00 |
1,674.00 |
|
|
| 302-02-A-01 |
class ii base course (4" thick) (crushed stone or
recycled pccp) |
12,425.0 |
SQYD |
11.00 |
136,675.00 |
10.00 |
124,250.00 |
12.20 |
151,585.00 |
|
|
| 302-02-D-01 |
class ii base course (8 1/2" thick) (soil cement)
|
11,585.2 |
SQYD |
14.00 |
162,192.80 |
12.00 |
139,022.40 |
11.00 |
127,437.20 |
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
82,593   |
SQYD |
5.75 |
474,909.75 |
6.14 |
507,121.02 |
6.75 |
557,502.75 |
|
|
| 304-01 |
lime
|
1,131.74 |
TON |
1.00 |
1,131.74 |
170.00 |
192,395.80 |
100.00 |
113,174.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
83,452   |
SQYD |
0.10 |
8,345.20 |
3.00 |
250,356.00 |
1.35 |
112,660.20 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
900.0 |
CUYD |
12.00 |
10,800.00 |
1.00 |
900.00 |
25.00 |
22,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
36,258.5 |
TON |
90.00 |
3,263,265.00 |
83.00 |
3,009,455.50 |
87.00 |
3,154,489.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts, and
misc. |
673.3 |
TON |
100.00 |
67,330.00 |
150.00 |
100,995.00 |
165.00 |
111,094.50 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
83,436   |
SQYD |
2.00 |
166,872.00 |
0.50 |
41,718.00 |
0.80 |
66,748.80 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 11,299   |
CUYD |
0.10 |
- 1,129.90 |
0.01 |
- 112.99 |
1.00 |
- 11,299.00 |
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
144   |
LNFT |
120.00 |
17,280.00 |
75.00 |
10,800.00 |
160.00 |
23,040.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
188   |
LNFT |
55.00 |
10,340.00 |
48.00 |
9,024.00 |
80.00 |
15,040.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
56   |
LNFT |
68.00 |
3,808.00 |
56.00 |
3,136.00 |
135.00 |
7,560.00 |
|
|
| 704-03 |
blocked out guard rail
|
225.0 |
LNFT |
45.00 |
10,125.00 |
22.00 |
4,950.00 |
44.00 |
9,900.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
37.00 |
3,700.00 |
57.00 |
5,700.00 |
37.00 |
3,700.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
1,900.00 |
7,600.00 |
2,500.00 |
10,000.00 |
2,000.00 |
8,000.00 |
|
|
| 705-03 |
single swinging walk gates
|
1   |
EACH |
525.00 |
525.00 |
500.00 |
500.00 |
500.00 |
500.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
116   |
LNFT |
25.00 |
2,900.00 |
20.00 |
2,320.00 |
21.00 |
2,436.00 |
|
|
| 708-01 |
right-of-way monument
|
11   |
EACH |
150.00 |
1,650.00 |
250.00 |
2,750.00 |
400.00 |
4,400.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
11   |
EACH |
52.00 |
572.00 |
250.00 |
2,750.00 |
400.00 |
4,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
28,000.00 |
28,000.00 |
125,000.00 |
125,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
16.410 |
MILE |
150.00 |
2,461.50 |
400.00 |
6,564.00 |
200.00 |
3,282.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
32.820 |
MILE |
600.00 |
19,692.00 |
600.00 |
19,692.00 |
400.00 |
13,128.00 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
210.00 |
420.00 |
|
|
| 713-06 |
temporary reflectorized raised pavement markers
|
57   |
EACH |
5.00 |
285.00 |
4.50 |
256.50 |
5.50 |
313.50 |
|
|
| 713-07 |
temporary precast concrete barrier (contractor
furnished) |
67   |
EACH |
950.00 |
63,650.00 |
700.00 |
46,900.00 |
950.00 |
63,650.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
17,500.00 |
17,500.00 |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
284,000.00 |
284,000.00 |
100,000.00 |
100,000.00 |
500,000.00 |
500,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
52.00 |
416.00 |
75.00 |
600.00 |
50.00 |
400.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
722   |
EACH |
5.00 |
3,610.00 |
4.50 |
3,249.00 |
6.00 |
4,332.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
72   |
LNFT |
3.25 |
234.00 |
3.00 |
216.00 |
5.00 |
360.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.069 |
MILE |
2,350.00 |
28,362.15 |
2,200.00 |
26,551.80 |
2,500.00 |
30,172.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.470 |
MILE |
625.00 |
3,418.75 |
600.00 |
3,282.00 |
850.00 |
4,649.50 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
375.00 |
750.00 |
425.00 |
850.00 |
|
|
| 735-01 |
mailboxes
|
48   |
EACH |
1.00 |
48.00 |
1.00 |
48.00 |
1.00 |
48.00 |
|
|
| 735-02 |
mailbox supports (single)
|
42   |
EACH |
100.00 |
4,200.00 |
120.00 |
5,040.00 |
115.00 |
4,830.00 |
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
130.00 |
390.00 |
175.00 |
525.00 |
130.00 |
390.00 |
|
|
| 739-01 |
hydro-seeding
|
8.49 |
ACRE |
1,100.00 |
9,339.00 |
1,100.00 |
9,339.00 |
1,200.00 |
10,188.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
47,000.00 |
47,000.00 |
7,000.00 |
7,000.00 |
35,000.00 |
35,000.00 |
|
|
| 741-08 |
relocating water meter
|
5   |
EACH |
400.00 |
2,000.00 |
500.00 |
2,500.00 |
500.00 |
2,500.00 |
|
|
| 741-09 |
adjusting water house connections
|
3   |
EACH |
415.00 |
1,245.00 |
400.00 |
1,200.00 |
400.00 |
1,200.00 |
|
|
| 741-10 |
adjusting water service lines
|
300   |
LNFT |
6.00 |
1,800.00 |
6.00 |
1,800.00 |
25.00 |
7,500.00 |
|
|
| 741-11 |
adjusting water valve and meter box
|
3   |
EACH |
500.00 |
1,500.00 |
500.00 |
1,500.00 |
700.00 |
2,100.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connections
|
3   |
EACH |
300.00 |
900.00 |
300.00 |
900.00 |
500.00 |
1,500.00 |
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
300   |
LNFT |
8.00 |
2,400.00 |
8.00 |
2,400.00 |
25.00 |
7,500.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
12.34 |
CUYD |
1,100.00 |
13,574.00 |
1,000.00 |
12,340.00 |
1,400.00 |
17,276.00 |
|
|
| 805-12-M-01 |
reinforced concrete box culverts (6'x 6') (extension)
(4 barrell) |
144.0 |
LNFT |
600.00 |
86,400.00 |
700.00 |
100,800.00 |
600.00 |
86,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
1,141   |
LB |
3.25 |
3,708.25 |
2.50 |
2,852.50 |
2.00 |
2,282.00 |
|
|
| S-001 |
adjusting gas house connections
|
3   |
EACH |
415.00 |
1,245.00 |
400.00 |
1,200.00 |
2,000.00 |
6,000.00 |
|
|
| S-002 |
adjusting gas service line
|
100   |
LNFT |
14.00 |
1,400.00 |
15.00 |
1,500.00 |
25.00 |
2,500.00 |
|
|
| S-003 |
impact attenuators (construction zone)
|
2   |
EACH |
10,000.00 |
20,000.00 |
18,000.00 |
36,000.00 |
11,500.00 |
23,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,744,753.44 |
|
5,889,488.03 |
|
6,014,572.55 |
|
|
|