| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. J. BURNELL, INC. |
- 2 - S.F.C. CONTRACT SERVICES, INC. |
- 3 - SPECIALTY TRACKHOE & DOZER SERV.INC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
59   |
SQYD |
20.00 |
1,180.00 |
12.00 |
708.00 |
20.00 |
1,180.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
229   |
SQYD |
10.00 |
2,290.00 |
12.00 |
2,748.00 |
6.00 |
1,374.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
447.8 |
LNFT |
3.00 |
1,343.40 |
10.00 |
4,478.00 |
3.00 |
1,343.40 |
|
|
| 202-02-I |
removal of existing traffic signal equipment
|
1   |
EACH |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
|
|
| 203-01 |
general excavation
|
76   |
CUYD |
20.00 |
1,520.00 |
17.00 |
1,292.00 |
12.00 |
912.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
300   |
CUYD |
4.00 |
1,200.00 |
13.00 |
3,900.00 |
14.00 |
4,200.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
281.1 |
SQYD |
20.00 |
5,622.00 |
19.00 |
5,340.90 |
21.00 |
5,903.10 |
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
351.8 |
SQYD |
65.00 |
22,867.00 |
85.00 |
29,903.00 |
80.00 |
28,144.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
142   |
LNFT |
125.00 |
17,750.00 |
75.00 |
10,650.00 |
70.00 |
9,940.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
3   |
EACH |
5,000.00 |
15,000.00 |
4,700.00 |
14,100.00 |
5,200.00 |
15,600.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
43.7 |
SQYD |
50.00 |
2,185.00 |
65.00 |
2,840.50 |
85.00 |
3,714.50 |
|
|
| 707-01 |
concrete curb
|
305.0 |
LNFT |
7.00 |
2,135.00 |
13.00 |
3,965.00 |
11.50 |
3,507.50 |
|
|
| 708-01 |
right-of-way monument
|
3   |
EACH |
300.00 |
900.00 |
300.00 |
900.00 |
250.00 |
750.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
3   |
EACH |
300.00 |
900.00 |
300.00 |
900.00 |
175.00 |
525.00 |
|
|
| 710-01 |
flowable fill
|
15   |
CUYD |
100.00 |
1,500.00 |
120.00 |
1,800.00 |
175.00 |
2,625.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
17,500.00 |
17,500.00 |
18,000.00 |
18,000.00 |
|
|
| 714-01 |
slab sodding
|
93   |
SQYD |
5.00 |
465.00 |
9.00 |
837.00 |
7.00 |
651.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
23,000.00 |
23,000.00 |
30,000.00 |
30,000.00 |
|
|
| 729-01 |
sign (type a)
|
42.5 |
SQFT |
48.00 |
2,040.00 |
53.00 |
2,252.50 |
100.00 |
4,250.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
11   |
EACH |
15.00 |
165.00 |
13.00 |
143.00 |
11.00 |
121.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
61   |
LNFT |
10.00 |
610.00 |
6.00 |
366.00 |
5.50 |
335.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.070 |
MILE |
7,000.00 |
490.00 |
5,300.00 |
371.00 |
5,900.00 |
413.00 |
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.012 |
MILE |
7,000.00 |
84.00 |
6,000.00 |
72.00 |
6,600.00 |
79.20 |
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.030 |
MILE |
7,000.00 |
210.00 |
6,000.00 |
180.00 |
6,600.00 |
198.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
275.00 |
275.00 |
300.00 |
300.00 |
275.00 |
275.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
275.00 |
275.00 |
300.00 |
300.00 |
275.00 |
275.00 |
|
|
| 732-05 |
removal of existing markings
|
0.048 |
MILE |
7,000.00 |
336.00 |
5,300.00 |
254.40 |
5,900.00 |
283.20 |
|
|
| 736-01 |
trenching and backfilling
|
50   |
LNFT |
4.00 |
200.00 |
4.00 |
200.00 |
3.00 |
150.00 |
|
|
| 736-03-B |
jacked or bored conduit (3" sch. 80, pec)
|
100   |
LNFT |
48.00 |
4,800.00 |
54.00 |
5,400.00 |
25.00 |
2,500.00 |
|
|
| 736-04-C |
signal support (50' single mast arm)
|
1   |
EACH |
19,000.00 |
19,000.00 |
20,000.00 |
20,000.00 |
16,000.00 |
16,000.00 |
|
|
| 736-05-B |
signal heads (3 section, 12" led lenses, r,y,g)
|
8   |
EACH |
1,250.00 |
10,000.00 |
1,200.00 |
9,600.00 |
1,600.00 |
12,800.00 |
|
|
| 736-05-C |
signal heads (5 section, 12" led lenses,
r,lt.y,y,lt.g,g) |
4   |
EACH |
2,000.00 |
8,000.00 |
1,800.00 |
7,200.00 |
2,300.00 |
9,200.00 |
|
|
| 736-10-A |
underground junction box (type e)
|
5   |
EACH |
750.00 |
3,750.00 |
800.00 |
4,000.00 |
450.00 |
2,250.00 |
|
|
| 736-11-C |
conduit (3" sch.80, pec)
|
150   |
LNFT |
11.00 |
1,650.00 |
12.00 |
1,800.00 |
10.00 |
1,500.00 |
|
|
| 736-12-A |
conductor (2c, loop lead-in, imsa 50-2)
|
70   |
LNFT |
6.00 |
420.00 |
6.00 |
420.00 |
5.00 |
350.00 |
|
|
| 736-12-B |
conductor (6c, signal, 14 awg, stranded)
|
340   |
LNFT |
3.85 |
1,309.00 |
4.00 |
1,360.00 |
3.00 |
1,020.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
15,000.00 |
15,000.00 |
|
|
| 741-06 |
relocating fire hydrant
|
1   |
EACH |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
2,000.00 |
2,000.00 |
|
|
| 741-07 |
relocating water valve
|
1   |
EACH |
2,500.00 |
2,500.00 |
6,000.00 |
6,000.00 |
3,850.00 |
3,850.00 |
|
|
| S-001 |
sawcutting
|
482   |
LNFT |
15.00 |
7,230.00 |
6.00 |
2,892.00 |
15.00 |
7,230.00 |
|
|
| S-002 |
converting catch basin to manhole
|
3   |
EACH |
2,000.00 |
6,000.00 |
3,900.00 |
11,700.00 |
3,600.00 |
10,800.00 |
|
|
| S-003 |
relocate traffic signal pole and junction box
|
lump |
LUMP |
4,500.00 |
4,500.00 |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
|
|
| S-004 |
video detector (mvp) system
|
1   |
EACH |
4,600.00 |
4,600.00 |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
|
|
| S-005 |
video detection (mvp) device
|
4   |
EACH |
7,600.00 |
30,400.00 |
7,000.00 |
28,000.00 |
7,000.00 |
28,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
229,701.40 |
|
251,173.30 |
|
259,249.40 |
|
|
|