| Type Const: Grading, Cold Planing Asphatic Concrete Pavement, Superpave Asphaltic Concrete Pavement, Guardrail, Pavement Markings and Related Work | |
| Estimated Construction Cost: $2,740,224.74 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $2,662,044.45 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $3,009,643.84 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 18 | SQYD | 25.00 | 450.00 | 35.00 | 630.00 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 992 | LNFT | 6.50 | 6,448.00 | 7.00 | 6,944.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 40,000.00 | 40,000.00 | 50,000.00 | 50,000.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 10,000 | CUYD | 1.50 | 15,000.00 | 12.00 | 120,000.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 400 | CUYD | 1.00 | 400.00 | 100.00 | 40,000.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 22,812.1 | TON | 90.00 | 2,053,089.00 | 92.00 | 2,098,713.20 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 900 | TON | 60.00 | 54,000.00 | 180.00 | 162,000.00 |
| 0008 | 509-01-00100 | Cold Planing Asphaltic Pavement | 3,963 | SQYD | 4.00 | 15,852.00 | 5.70 | 22,589.10 |
| 0009 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -110 | CUYD | 0.10 | -11.00 | 1.00 | -110.00 |
| 0010 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 2,000 | SQYD | 42.50 | 85,000.00 | 65.00 | 130,000.00 |
| 0011 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 200 | LNFT | 37.00 | 7,400.00 | 40.00 | 8,000.00 |
| 0012 | 704-01-01020 | Guard Rail (Single Thrie Beam) (6'-3" post spacing) | 304 | LNFT | 56.00 | 17,024.00 | 60.00 | 18,240.00 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 250 | LNFT | 17.90 | 4,475.00 | 20.00 | 5,000.00 |
| 0014 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 50 | LNFT | 38.00 | 1,900.00 | 40.00 | 2,000.00 |
| 0015 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 54.00 | 5,400.00 | 60.00 | 6,000.00 |
| 0016 | 704-11-00200 | Guard Rail End Treatment (Tangent) | 12 | EACH | 2,400.00 | 28,800.00 | 2,600.00 | 31,200.00 |
| 0017 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 98,500.00 | 98,500.00 | 25,000.00 | 25,000.00 |
| 0018 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 44 | LNFT | 0.10 | 4.40 | 1.65 | 72.60 |
| 0019 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 12.078 | MILE | 325.00 | 3,925.35 | 350.00 | 4,227.30 |
| 0020 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 3.548 | MILE | 1.00 | 3.55 | 195.00 | 691.86 |
| 0021 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 44.014 | MILE | 475.00 | 20,906.65 | 1.00 | 44.01 |
| 0022 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 4 | EACH | 1.00 | 4.00 | 55.00 | 220.00 |
| 0023 | 716-01-00100 | Mulch (Vegetative) | 17.426 | TON | 600.00 | 10,455.60 | 565.00 | 9,845.69 |
| 0024 | 717-01-00100 | Seeding | 349 | LB | 10.00 | 3,490.00 | 9.00 | 3,141.00 |
| 0025 | 718-01-00100 | Fertilizer | 8,713 | LB | 0.50 | 4,356.50 | 0.85 | 7,406.05 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 98,500.00 | 98,500.00 | 180,000.00 | 180,000.00 |
| 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 12 | EACH | 70.00 | 840.00 | 75.00 | 900.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 798 | EACH | 5.00 | 3,990.00 | 5.65 | 4,508.70 |
| 0029 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 22 | LNFT | 3.00 | 66.00 | 7.85 | 172.70 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 22.007 | MILE | 2,600.00 | 57,218.20 | 2,800.00 | 61,619.60 |
| 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.774 | MILE | 800.00 | 1,419.20 | 845.00 | 1,499.03 |
| 0032 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 2 | EACH | 400.00 | 800.00 | 565.00 | 1,130.00 |
| 0033 | 735-01-00100 | Mailboxes | 14 | EACH | 1.00 | 14.00 | 12.00 | 168.00 |
| 0034 | 735-02-00100 | Mailbox Supports (Single) | 12 | EACH | 139.00 | 1,668.00 | 100.00 | 1,200.00 |
| 0035 | 735-03-00100 | Mailbox Supports (Double) | 1 | EACH | 200.00 | 200.00 | 135.00 | 135.00 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 6,000.00 | 6,000.00 |
| 0037 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 228 | INLF | 2.00 | 456.00 | 2.00 | 456.00 |
| CONTRACTOR TOTAL | 2,662,044.45 | 3,009,643.84 | ||||||