Bid Tabulations
Letting of
05/25/2011
LA DOTD Headquarters
| Lead Project: 089-03-0028 | |
| Parish: Bienville | |
| Routes: LA 9 | |
| Description: OTTER CREEK AND DRAIN DRAIN BRIDGES | |
| Type Const: GRADING, DRAIN STRUCT, LIME TREAT, CLASS II BC, SUPERPAVE ACP, CONCRETE SLAB SPANS BRIDGES AND RELATED WORK. | |
| Estimated Construction Cost: $3,069,743.83 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34567 | James Construction Group LLC | $2,381,671.10 |
| 2 | 48925 | David V. Temple | $2,531,204.63 |
| 3 | 01012 | Cecil D. Gassiott, LLC | $2,725,170.53 |
| 4 | 39580 | Gerace Construction Llc | $2,744,775.07 |
| 5 | 12135 | Blount Bros. Construction, Inc. | $2,885,853.40 |
| 6 | 39462 | Jb James Construction Llc | $3,074,793.37 |
| 7 | 12312 | Gilchrist Construction Co. LLC | $3,098,386.16 |
| 8 | 09090 | Guinn Brothers, LLC. | $3,403,047.95 |
| 9 | 18546 | C W & W Contractors, Inc. | $3,529,342.80 |
| 10 | 43371 | RMD Holdings Ltd | $3,986,268.35 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - James Construction Group LLC |
- 2 - David V. Temple |
- 3 - Cecil D. Gassiott, LLC |
- 4 - Gerace Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 | 70,000.00 | 70,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 6,500.00 | 6,500.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 3,000.00 | 3,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 110+10; 28.3 ft x 57 ft Concrete Precast Slab Unit Bridge | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 210+93; 29.0 ft x 37 ft Concrete Deck Girder Bridge | 1 | EACH | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,571.2 | SQYD | 2.00 | 11,142.40 | 4.50 | 25,070.40 | 5.00 | 27,856.00 | 2.00 | 11,142.40 |
| 0006 | 202-03-00010 | Relocation of Existing 84" RCP | 1 | EACH | 3,000.00 | 3,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 3,000.00 | 3,000.00 |
| 0007 | 203-02-00100 | Drainage Excavation | 1,425 | CUYD | 4.00 | 5,700.00 | 11.50 | 16,387.50 | 11.00 | 15,675.00 | 8.00 | 11,400.00 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 100,000.00 | 100,000.00 | 120,644.00 | 120,644.00 | 130,000.00 | 130,000.00 | 150,000.00 | 150,000.00 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 140.00 | 1,820.00 | 137.50 | 1,787.50 | 125.00 | 1,625.00 | 175.00 | 2,275.00 |
| 0010 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 13 | EACH | 380.00 | 4,940.00 | 350.00 | 4,550.00 | 400.00 | 5,200.00 | 550.00 | 7,150.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 4,930 | LNFT | 2.25 | 11,092.50 | 2.20 | 10,846.00 | 2.00 | 9,860.00 | 1.75 | 8,627.50 |
| 0012 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 2,500.00 | 5,000.00 | 1,500.00 | 3,000.00 | 3,000.00 | 6,000.00 | 3,000.00 | 6,000.00 |
| 0013 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 9,155.4 | SQYD | 24.00 | 219,729.60 | 18.19 | 166,536.73 | 23.00 | 210,574.20 | 22.00 | 201,418.80 |
| 0014 | 304-05-00100 | Lime Treatment (Type E) | 64.89 | TON | 200.00 | 12,978.00 | 395.00 | 25,631.55 | 250.00 | 16,222.50 | 450.00 | 29,200.50 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 30.00 | 3,000.00 | 50.00 | 5,000.00 | 95.00 | 9,500.00 | 67.97 | 6,797.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 1,991.2 | TON | 110.00 | 219,032.00 | 145.75 | 290,217.40 | 150.00 | 298,680.00 | 138.81 | 276,398.47 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 465.7 | TON | 150.00 | 69,855.00 | 170.50 | 79,401.85 | 175.00 | 81,497.50 | 164.31 | 76,519.17 |
| 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 30 | LNFT | 45.00 | 1,350.00 | 40.25 | 1,207.50 | 50.00 | 1,500.00 | 80.94 | 2,428.20 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 606.3 | LNFT | 18.00 | 10,913.40 | 19.80 | 12,004.74 | 19.00 | 11,519.70 | 19.00 | 11,519.70 |
| 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 55.00 | 11,000.00 | 60.50 | 12,100.00 | 58.00 | 11,600.00 | 60.00 | 12,000.00 |
| 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,000.00 | 16,000.00 | 2,200.00 | 17,600.00 | 2,100.00 | 16,800.00 | 2,200.00 | 17,600.00 |
| 0022 | 708-01-00100 | Right-of-Way Monument | 27 | EACH | 180.00 | 4,860.00 | 150.00 | 4,050.00 | 450.00 | 12,150.00 | 160.00 | 4,320.00 |
| 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 27 | EACH | 130.00 | 3,510.00 | 150.00 | 4,050.00 | 100.00 | 2,700.00 | 160.00 | 4,320.00 |
| 0024 | 712-04-00100 | Flexible Revetment | 3,051 | SQYD | 58.00 | 176,958.00 | 60.00 | 183,060.00 | 60.00 | 183,060.00 | 40.00 | 122,040.00 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 | 15,000.00 | 15,000.00 |
| 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.723 | MILE | 350.00 | 603.05 | 385.00 | 663.36 | 1,000.00 | 1,723.00 | 375.00 | 646.13 |
| 0027 | 716-01-00100 | Mulch (Vegetative) | 20.4 | TON | 675.00 | 13,770.00 | 740.00 | 15,096.00 | 700.00 | 14,280.00 | 550.00 | 11,220.00 |
| 0028 | 717-01-00100 | Seeding | 404 | LB | 8.50 | 3,434.00 | 9.30 | 3,757.20 | 9.00 | 3,636.00 | 7.50 | 3,030.00 |
| 0029 | 718-01-00100 | Fertilizer | 10,100 | LB | 0.50 | 5,050.00 | 0.55 | 5,555.00 | 0.50 | 5,050.00 | 0.50 | 5,050.00 |
| 0030 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 4,407 | SQYD | 1.20 | 5,288.40 | 1.35 | 5,949.45 | 1.25 | 5,508.75 | 1.40 | 6,169.80 |
| 0031 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 456 | SQYD | 1.95 | 889.20 | 2.20 | 1,003.20 | 2.00 | 912.00 | 1.90 | 866.40 |
| 0032 | 722-01-00100 | Project Site Laboratory | 2 | EACH | 7,300.00 | 14,600.00 | 7,500.00 | 15,000.00 | 8,000.00 | 16,000.00 | 10,000.00 | 20,000.00 |
| 0033 | 725-01-00100 | Temporary Detour Roads | 6,827.3 | SQYD | 50.00 | 341,365.00 | 72.50 | 494,979.25 | 66.00 | 450,601.80 | 70.00 | 477,911.00 |
| 0034 | 725-02-00100 | Temporary Detour Bridging | 60 | LNFT | 1,500.00 | 90,000.00 | 1,000.00 | 60,000.00 | 2,150.00 | 129,000.00 | 3,000.00 | 180,000.00 |
| 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 215,000.00 | 215,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 150,000.00 | 270,000.00 | 270,000.00 |
| 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 75.00 | 600.00 | 82.50 | 660.00 | 85.00 | 680.00 | 80.00 | 640.00 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 88 | EACH | 15.00 | 1,320.00 | 16.50 | 1,452.00 | 10.00 | 880.00 | 16.00 | 1,408.00 |
| 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.75 | MILE | 3,200.00 | 5,600.00 | 3,520.00 | 6,160.00 | 3,200.00 | 5,600.00 | 3,500.00 | 6,125.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 20,000.00 | 20,000.00 |
| 0040 | 804-01-00200 | Precast Concrete Piles (14") | 820 | LNFT | 70.00 | 57,400.00 | 65.00 | 53,300.00 | 68.00 | 55,760.00 | 65.00 | 53,300.00 |
| 0041 | 804-01-00300 | Precast Concrete Piles (16") | 920 | LNFT | 70.00 | 64,400.00 | 75.00 | 69,000.00 | 72.00 | 66,240.00 | 67.50 | 62,100.00 |
| 0042 | 804-05-00200 | Precast Concrete Test Piles (14") | 1 | EACH | 20,000.00 | 20,000.00 | 1,500.00 | 1,500.00 | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 |
| 0043 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 20,000.00 | 20,000.00 | 1,500.00 | 1,500.00 | 25,000.00 | 25,000.00 | 6,500.00 | 6,500.00 |
| 0044 | 804-09-00100 | Loading Test Piles | 2 | EACH | 12,000.00 | 24,000.00 | 1,000.00 | 2,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 |
| 0045 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 2,000.00 | 2,000.00 | 1,000.00 | 1,000.00 | 5,000.00 | 5,000.00 | 2,500.00 | 2,500.00 |
| 0046 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | 1,500.00 | 1,500.00 | 2,500.00 | 2,500.00 |
| 0047 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 10,000.00 | 10,000.00 | 1,000.00 | 1,000.00 | 1,500.00 | 1,500.00 | 2,000.00 | 2,000.00 |
| 0048 | 804-17-00100 | Dynamic Monitoring | 10 | EACH | 600.00 | 6,000.00 | 1,500.00 | 15,000.00 | 500.00 | 5,000.00 | 1,577.82 | 15,778.20 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 76.94 | CUYD | 825.00 | 63,475.50 | 650.00 | 50,011.00 | 1,100.00 | 84,634.00 | 1,100.00 | 84,634.00 |
| 0050 | 805-03-00100 | Class AA Concrete | 284.72 | CUYD | 600.00 | 170,832.00 | 700.00 | 199,304.00 | 850.00 | 242,012.00 | 650.00 | 185,068.00 |
| 0051 | 806-01-00100 | Deformed Reinforcing Steel | 66,020 | LB | 0.85 | 56,117.00 | 1.25 | 82,525.00 | 0.75 | 49,515.00 | 0.85 | 56,117.00 |
| 0052 | 810-01-00100 | Concrete Railing (Standard Barrier) | 320 | LNFT | 85.00 | 27,200.00 | 75.00 | 24,000.00 | 68.00 | 21,760.00 | 110.00 | 35,200.00 |
| 0053 | 813-01-00100 | Concrete Approach Slabs | 728.88 | SQYD | 210.00 | 153,064.80 | 220.00 | 160,353.60 | 210.00 | 153,064.80 | 175.00 | 127,554.00 |
| 0054 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.752 | MILE | 374.00 | 281.25 | 7,700.00 | 5,790.40 | 390.00 | 293.28 | 400.00 | 300.80 |
| CONTRACTOR TOTAL | 2,381,671.10 | 2,531,204.63 | 2,725,170.53 | 2,744,775.07 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Blount Bros. Construction, Inc. |
- 6 - Jb James Construction Llc |
- 7 - Gilchrist Construction Co. LLC |
- 8 - Guinn Brothers, LLC. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 | 250,000.00 | 250,000.00 | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 30,000.00 | 30,000.00 | 16,000.00 | 16,000.00 | 4,000.00 | 4,000.00 | 8,000.00 | 8,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 110+10; 28.3 ft x 57 ft Concrete Precast Slab Unit Bridge | 1 | EACH | 30,000.00 | 30,000.00 | 18,000.00 | 18,000.00 | 20,000.00 | 20,000.00 | 12,000.00 | 12,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 210+93; 29.0 ft x 37 ft Concrete Deck Girder Bridge | 1 | EACH | 30,000.00 | 30,000.00 | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,571.2 | SQYD | 4.00 | 22,284.80 | 3.60 | 20,056.32 | 4.30 | 23,956.16 | 5.00 | 27,856.00 |
| 0006 | 202-03-00010 | Relocation of Existing 84" RCP | 1 | EACH | 4,000.00 | 4,000.00 | 8,000.00 | 8,000.00 | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 |
| 0007 | 203-02-00100 | Drainage Excavation | 1,425 | CUYD | 12.00 | 17,100.00 | 11.00 | 15,675.00 | 12.00 | 17,100.00 | 10.00 | 14,250.00 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 90,000.00 | 90,000.00 | 250,000.00 | 250,000.00 | 305,000.00 | 305,000.00 | 206,000.00 | 206,000.00 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 150.00 | 1,950.00 | 125.00 | 1,625.00 | 150.00 | 1,950.00 | 100.00 | 1,300.00 |
| 0010 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 13 | EACH | 500.00 | 6,500.00 | 800.00 | 10,400.00 | 300.00 | 3,900.00 | 850.00 | 11,050.00 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 4,930 | LNFT | 2.50 | 12,325.00 | 2.30 | 11,339.00 | 1.90 | 9,367.00 | 3.00 | 14,790.00 |
| 0012 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 4,300.00 | 8,600.00 | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 | 1,500.00 | 3,000.00 |
| 0013 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 9,155.4 | SQYD | 21.00 | 192,263.40 | 26.00 | 238,040.40 | 22.00 | 201,418.80 | 19.00 | 173,952.60 |
| 0014 | 304-05-00100 | Lime Treatment (Type E) | 64.89 | TON | 275.00 | 17,844.75 | 300.00 | 19,467.00 | 100.00 | 6,489.00 | 275.00 | 17,844.75 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 40.00 | 4,000.00 | 75.00 | 7,500.00 | 25.00 | 2,500.00 | 50.00 | 5,000.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 1,991.2 | TON | 150.00 | 298,680.00 | 135.00 | 268,812.00 | 105.00 | 209,076.00 | 200.00 | 398,240.00 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 465.7 | TON | 150.00 | 69,855.00 | 160.00 | 74,512.00 | 185.00 | 86,154.50 | 240.00 | 111,768.00 |
| 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 30 | LNFT | 40.00 | 1,200.00 | 50.00 | 1,500.00 | 90.00 | 2,700.00 | 200.00 | 6,000.00 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 606.3 | LNFT | 30.00 | 18,189.00 | 18.00 | 10,913.40 | 20.00 | 12,126.00 | 22.00 | 13,338.60 |
| 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 85.00 | 17,000.00 | 55.00 | 11,000.00 | 60.00 | 12,000.00 | 65.00 | 13,000.00 |
| 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 3,000.00 | 24,000.00 | 2,000.00 | 16,000.00 | 2,200.00 | 17,600.00 | 2,500.00 | 20,000.00 |
| 0022 | 708-01-00100 | Right-of-Way Monument | 27 | EACH | 175.00 | 4,725.00 | 150.00 | 4,050.00 | 240.00 | 6,480.00 | 250.00 | 6,750.00 |
| 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 27 | EACH | 75.00 | 2,025.00 | 150.00 | 4,050.00 | 240.00 | 6,480.00 | 100.00 | 2,700.00 |
| 0024 | 712-04-00100 | Flexible Revetment | 3,051 | SQYD | 55.00 | 167,805.00 | 55.00 | 167,805.00 | 55.00 | 167,805.00 | 80.00 | 244,080.00 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 | 65,000.00 | 65,000.00 | 30,000.00 | 30,000.00 |
| 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.723 | MILE | 150.00 | 258.45 | 350.00 | 603.05 | 600.00 | 1,033.80 | 550.00 | 947.65 |
| 0027 | 716-01-00100 | Mulch (Vegetative) | 20.4 | TON | 600.00 | 12,240.00 | 700.00 | 14,280.00 | 550.00 | 11,220.00 | 650.00 | 13,260.00 |
| 0028 | 717-01-00100 | Seeding | 404 | LB | 10.00 | 4,040.00 | 8.50 | 3,434.00 | 7.50 | 3,030.00 | 15.00 | 6,060.00 |
| 0029 | 718-01-00100 | Fertilizer | 10,100 | LB | 1.00 | 10,100.00 | 0.50 | 5,050.00 | 0.50 | 5,050.00 | 1.00 | 10,100.00 |
| 0030 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 4,407 | SQYD | 2.00 | 8,814.00 | 1.20 | 5,288.40 | 1.30 | 5,729.10 | 1.25 | 5,508.75 |
| 0031 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 456 | SQYD | 2.25 | 1,026.00 | 2.00 | 912.00 | 1.85 | 843.60 | 2.00 | 912.00 |
| 0032 | 722-01-00100 | Project Site Laboratory | 2 | EACH | 10,000.00 | 20,000.00 | 5,000.00 | 10,000.00 | 5,000.00 | 10,000.00 | 10,000.00 | 20,000.00 |
| 0033 | 725-01-00100 | Temporary Detour Roads | 6,827.3 | SQYD | 80.00 | 546,184.00 | 60.00 | 409,638.00 | 70.00 | 477,911.00 | 100.00 | 682,730.00 |
| 0034 | 725-02-00100 | Temporary Detour Bridging | 60 | LNFT | 4,167.00 | 250,020.00 | 600.00 | 36,000.00 | 1,200.00 | 72,000.00 | 2,500.00 | 150,000.00 |
| 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 80,000.00 | 80,000.00 | 310,000.00 | 310,000.00 | 300,000.00 | 300,000.00 | 225,000.00 | 225,000.00 |
| 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 75.00 | 600.00 | 80.00 | 640.00 | 100.00 | 800.00 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 88 | EACH | 10.00 | 880.00 | 15.00 | 1,320.00 | 5.85 | 514.80 | 25.00 | 2,200.00 |
| 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.75 | MILE | 5,000.00 | 8,750.00 | 3,200.00 | 5,600.00 | 3,000.00 | 5,250.00 | 4,000.00 | 7,000.00 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 40,000.00 |
| 0040 | 804-01-00200 | Precast Concrete Piles (14") | 820 | LNFT | 130.00 | 106,600.00 | 86.00 | 70,520.00 | 94.00 | 77,080.00 | 65.00 | 53,300.00 |
| 0041 | 804-01-00300 | Precast Concrete Piles (16") | 920 | LNFT | 140.00 | 128,800.00 | 90.00 | 82,800.00 | 95.00 | 87,400.00 | 85.00 | 78,200.00 |
| 0042 | 804-05-00200 | Precast Concrete Test Piles (14") | 1 | EACH | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 |
| 0043 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 5,000.00 | 5,000.00 | 15,000.00 | 15,000.00 | 35,000.00 | 35,000.00 | 20,000.00 | 20,000.00 |
| 0044 | 804-09-00100 | Loading Test Piles | 2 | EACH | 10,000.00 | 20,000.00 | 20,000.00 | 40,000.00 | 35,000.00 | 70,000.00 | 500.00 | 1,000.00 |
| 0045 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 6,500.00 | 6,500.00 | 500.00 | 500.00 |
| 0046 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 2,000.00 | 2,000.00 | 100.00 | 100.00 | 1,000.00 | 1,000.00 | 500.00 | 500.00 |
| 0047 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,500.00 | 2,500.00 | 100.00 | 100.00 | 500.00 | 500.00 | 1.00 | 1.00 |
| 0048 | 804-17-00100 | Dynamic Monitoring | 10 | EACH | 1,500.00 | 15,000.00 | 1,200.00 | 12,000.00 | 435.00 | 4,350.00 | 1,500.00 | 15,000.00 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 76.94 | CUYD | 600.00 | 46,164.00 | 1,300.00 | 100,022.00 | 1,200.00 | 92,328.00 | 950.00 | 73,093.00 |
| 0050 | 805-03-00100 | Class AA Concrete | 284.72 | CUYD | 700.00 | 199,304.00 | 560.00 | 159,443.20 | 1,100.00 | 313,192.00 | 850.00 | 242,012.00 |
| 0051 | 806-01-00100 | Deformed Reinforcing Steel | 66,020 | LB | 1.50 | 99,030.00 | 1.00 | 66,020.00 | 0.75 | 49,515.00 | 1.00 | 66,020.00 |
| 0052 | 810-01-00100 | Concrete Railing (Standard Barrier) | 320 | LNFT | 100.00 | 32,000.00 | 80.00 | 25,600.00 | 70.00 | 22,400.00 | 100.00 | 32,000.00 |
| 0053 | 813-01-00100 | Concrete Approach Slabs | 728.88 | SQYD | 200.00 | 145,776.00 | 220.00 | 160,353.60 | 205.00 | 149,420.40 | 245.00 | 178,575.60 |
| 0054 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.752 | MILE | 10,000.00 | 7,520.00 | 7,000.00 | 5,264.00 | 500.00 | 376.00 | 16,500.00 | 12,408.00 |
| CONTRACTOR TOTAL | 2,885,853.40 | 3,074,793.37 | 3,098,386.16 | 3,403,047.95 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - C W & W Contractors, Inc. |
- 10 - RMD Holdings Ltd |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 36,000.00 | 36,000.00 | 76,470.59 | 76,470.59 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 19,394.60 | 19,394.60 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 110+10; 28.3 ft x 57 ft Concrete Precast Slab Unit Bridge | 1 | EACH | 6,000.00 | 6,000.00 | 29,626.16 | 29,626.16 |
| 0004 | 202-02-04000 | Removal of Bridge Sta. 210+93; 29.0 ft x 37 ft Concrete Deck Girder Bridge | 1 | EACH | 6,000.00 | 6,000.00 | 46,588.24 | 46,588.24 |
| 0005 | 202-02-38500 | Removal of Surfacing and Stablized Base | 5,571.2 | SQYD | 5.00 | 27,856.00 | 11.20 | 62,397.44 |
| 0006 | 202-03-00010 | Relocation of Existing 84" RCP | 1 | EACH | 5,000.00 | 5,000.00 | 70,348.87 | 70,348.87 |
| 0007 | 203-02-00100 | Drainage Excavation | 1,425 | CUYD | 15.00 | 21,375.00 | 10.03 | 14,292.75 |
| 0008 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 260,000.00 | 260,000.00 | 204,798.51 | 204,798.51 |
| 0009 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 13 | EACH | 125.00 | 1,625.00 | 147.06 | 1,911.78 |
| 0010 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 13 | EACH | 250.00 | 3,250.00 | 271.93 | 3,535.09 |
| 0011 | 204-06-00100 | Temporary Silt Fencing | 4,930 | LNFT | 3.00 | 14,790.00 | 2.34 | 11,536.20 |
| 0012 | 204-07-00100 | Temporary Stone Construction Entrance | 2 | EACH | 7,000.00 | 14,000.00 | 4,547.72 | 9,095.44 |
| 0013 | 302-02-03120 | Class II Base Course (8" Thick) (Stone or Recycled Portland Cement Concrete) | 9,155.4 | SQYD | 22.00 | 201,418.80 | 38.71 | 354,405.53 |
| 0014 | 304-05-00100 | Lime Treatment (Type E) | 64.89 | TON | 200.00 | 12,978.00 | 470.59 | 30,536.59 |
| 0015 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 100.00 | 10,000.00 | 56.52 | 5,652.00 |
| 0016 | 502-01-00100 | Superpave Asphaltic Concrete | 1,991.2 | TON | 180.00 | 358,416.00 | 197.65 | 393,560.68 |
| 0017 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 465.7 | TON | 280.00 | 130,396.00 | 235.29 | 109,574.55 |
| 0018 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 30 | LNFT | 60.00 | 1,800.00 | 129.41 | 3,882.30 |
| 0019 | 704-03-00100 | Blocked Out Guard Rail | 606.3 | LNFT | 65.00 | 39,409.50 | 24.71 | 14,981.67 |
| 0020 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 100.00 | 20,000.00 | 88.24 | 17,648.00 |
| 0021 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,500.00 | 20,000.00 | 2,941.18 | 23,529.44 |
| 0022 | 708-01-00100 | Right-of-Way Monument | 27 | EACH | 300.00 | 8,100.00 | 247.06 | 6,670.62 |
| 0023 | 708-02-00100 | Right-of-Way Monument Witness Post | 27 | EACH | 300.00 | 8,100.00 | 247.06 | 6,670.62 |
| 0024 | 712-04-00100 | Flexible Revetment | 3,051 | SQYD | 85.00 | 259,335.00 | 70.59 | 215,370.09 |
| 0025 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 112,812.55 | 112,812.55 |
| 0026 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.723 | MILE | 2,000.00 | 3,446.00 | 411.76 | 709.46 |
| 0027 | 716-01-00100 | Mulch (Vegetative) | 20.4 | TON | 1,000.00 | 20,400.00 | 794.12 | 16,200.05 |
| 0028 | 717-01-00100 | Seeding | 404 | LB | 30.00 | 12,120.00 | 10.00 | 4,040.00 |
| 0029 | 718-01-00100 | Fertilizer | 10,100 | LB | 2.00 | 20,200.00 | 0.59 | 5,959.00 |
| 0030 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 4,407 | SQYD | 4.00 | 17,628.00 | 3.72 | 16,394.04 |
| 0031 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 456 | SQYD | 10.00 | 4,560.00 | 13.82 | 6,301.92 |
| 0032 | 722-01-00100 | Project Site Laboratory | 2 | EACH | 15,000.00 | 30,000.00 | 32,058.82 | 64,117.64 |
| 0033 | 725-01-00100 | Temporary Detour Roads | 6,827.3 | SQYD | 85.00 | 580,320.50 | 44.67 | 304,975.49 |
| 0034 | 725-02-00100 | Temporary Detour Bridging | 60 | LNFT | 1,500.00 | 90,000.00 | 2,932.81 | 175,968.60 |
| 0035 | 727-01-00100 | Mobilization | 1 | LUMP | 400,000.00 | 400,000.00 | 351,712.88 | 351,712.88 |
| 0036 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 100.00 | 800.00 | 88.24 | 705.92 |
| 0037 | 731-02-00100 | Reflectorized Raised Pavement Markers | 88 | EACH | 100.00 | 8,800.00 | 17.65 | 1,553.20 |
| 0038 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.75 | MILE | 6,000.00 | 10,500.00 | 3,764.71 | 6,588.24 |
| 0039 | 740-01-00100 | Construction Layout | 1 | LUMP | 30,000.00 | 30,000.00 | 21,176.47 | 21,176.47 |
| 0040 | 804-01-00200 | Precast Concrete Piles (14") | 820 | LNFT | 85.00 | 69,700.00 | 108.59 | 89,043.80 |
| 0041 | 804-01-00300 | Precast Concrete Piles (16") | 920 | LNFT | 110.00 | 101,200.00 | 134.91 | 124,117.20 |
| 0042 | 804-05-00200 | Precast Concrete Test Piles (14") | 1 | EACH | 1.00 | 1.00 | 57,777.65 | 57,777.65 |
| 0043 | 804-05-00300 | Precast Concrete Test Piles (16") | 1 | EACH | 1.00 | 1.00 | 60,270.59 | 60,270.59 |
| 0044 | 804-09-00100 | Loading Test Piles | 2 | EACH | 1.00 | 2.00 | 29,396.47 | 58,792.94 |
| 0045 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 1.00 | 1.00 | 30,568.24 | 30,568.24 |
| 0046 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 1.00 | 1.00 | 29,411.76 | 29,411.76 |
| 0047 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 | 29,411.76 | 29,411.76 |
| 0048 | 804-17-00100 | Dynamic Monitoring | 10 | EACH | 300.00 | 3,000.00 | 4,705.88 | 47,058.80 |
| 0049 | 805-01-00700 | Class A Concrete (Bents) | 76.94 | CUYD | 1,000.00 | 76,940.00 | 1,322.57 | 101,758.54 |
| 0050 | 805-03-00100 | Class AA Concrete | 284.72 | CUYD | 800.00 | 227,776.00 | 736.34 | 209,650.72 |
| 0051 | 806-01-00100 | Deformed Reinforcing Steel | 66,020 | LB | 2.00 | 132,040.00 | 1.50 | 99,030.00 |
| 0052 | 810-01-00100 | Concrete Railing (Standard Barrier) | 320 | LNFT | 100.00 | 32,000.00 | 158.89 | 50,844.80 |
| 0053 | 813-01-00100 | Concrete Approach Slabs | 728.88 | SQYD | 200.00 | 145,776.00 | 234.12 | 170,645.39 |
| 0054 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.752 | MILE | 15,000.00 | 11,280.00 | 8,235.29 | 6,192.94 |
| CONTRACTOR TOTAL | 3,529,342.80 | 3,986,268.35 | ||||||