Bid Tabulations
Letting of
02/10/2010
LA DOTD Headquarters
| Lead Project: 085-08-0031 | |
| Parish: Claiborne | |
| Routes: LA 146 | |
| Description: WEST JUNCTION LA 518 TO LINCOLN PARISH LINE | |
| Type Const: ASPHALTIC CONCRETE PAVEMENT WIDENING AND OVERLAY | |
| Estimated Construction Cost: $1,578,657.71 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $1,533,846.65 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 21.4 | SQYD | 1.00 | 21.40 |
| 0002 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0003 | 203-07-00100 | Borrow (Vehicular Measurement) | 5,200 | CUYD | 1.00 | 5,200.00 |
| 0004 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 100 | CUYD | 30.00 | 3,000.00 |
| 0005 | 502-01-00100 | Superpave Asphaltic Concrete | 14,982 | TON | 80.00 | 1,198,560.00 |
| 0006 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 500 | TON | 60.00 | 30,000.00 |
| 0007 | 509-01-00100 | Cold Planing Asphaltic Pavement | 750 | SQYD | 1.00 | 750.00 |
| 0008 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -24 | CUYD | 1.00 | -24.00 |
| 0009 | 510-01-00100 | Pavement Patching (6" Minimum Thickness) | 150 | SQYD | 110.00 | 16,500.00 |
| 0010 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 48,500.00 | 48,500.00 |
| 0011 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 5.24 | MILE | 325.00 | 1,703.00 |
| 0012 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 2.881 | MILE | 1.00 | 2.88 |
| 0013 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.673 | MILE | 1.00 | 16.67 |
| 0014 | 716-01-00100 | Mulch (Vegetative) | 25.28 | TON | 600.00 | 15,168.00 |
| 0015 | 717-01-00100 | Seeding | 505.6 | LB | 10.00 | 5,056.00 |
| 0016 | 718-01-00100 | Fertilizer | 12,640 | LB | 1.00 | 12,640.00 |
| 0017 | 727-01-00100 | Mobilization | 1 | LUMP | 48,500.00 | 48,500.00 |
| 0018 | 731-02-00100 | Reflectorized Raised Pavement Markers | 693 | EACH | 4.50 | 3,118.50 |
| 0019 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.673 | MILE | 2,500.00 | 41,682.50 |
| 0020 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 2.881 | MILE | 700.00 | 2,016.70 |
| 0021 | 735-01-00100 | Mailboxes | 5 | EACH | 1.00 | 5.00 |
| 0022 | 735-02-00100 | Mailbox Supports (Single) | 5 | EACH | 250.00 | 1,250.00 |
| 0023 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 |
| 0024 | NS-500-00280 | Surface Preparation | 1 | LUMP | 65,000.00 | 65,000.00 |
| 0025 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 180 | INLF | 1.00 | 180.00 |
| CONTRACTOR TOTAL | 1,533,846.65 | |||||