| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
106   |
LNFT |
7.00 |
742.00 |
22.00 |
2,332.00 |
12.00 |
1,272.00 |
5.00 |
530.00 |
| 203-07 |
borrow (vehicular measurement)
|
930   |
CUYD |
40.00 |
37,200.00 |
16.00 |
14,880.00 |
25.00 |
23,250.00 |
20.00 |
18,600.00 |
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
3.10 |
3,100.00 |
3.50 |
3,500.00 |
1.00 |
1,000.00 |
2.00 |
2,000.00 |
| 502-01 |
superpave asphaltic concrete
|
5,706.8 |
TON |
78.00 |
445,130.40 |
85.00 |
485,078.00 |
100.00 |
570,680.00 |
95.00 |
542,146.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,176.3 |
TON |
1.00 |
1,176.30 |
140.00 |
164,682.00 |
120.00 |
141,156.00 |
95.00 |
111,748.50 |
| 509-01 |
cold planing asphaltic pavement
|
11,014   |
SQYD |
3.00 |
33,042.00 |
3.00 |
33,042.00 |
3.00 |
33,042.00 |
3.50 |
38,549.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 459   |
CUYD |
10.00 |
- 4,590.00 |
0.10 |
- 45.90 |
0.00 |
0.00 |
0.01 |
- 4.59 |
| 510-01-C |
pavement patching (8" minimum thickness)
|
227   |
SQYD |
90.00 |
20,430.00 |
66.00 |
14,982.00 |
80.00 |
18,160.00 |
80.00 |
18,160.00 |
| 510-01-D |
pavement patching (13.5" minimum thickness)
|
981   |
SQYD |
120.00 |
117,720.00 |
75.00 |
73,575.00 |
100.00 |
98,100.00 |
100.00 |
98,100.00 |
| 701-05-I |
side drain pipe (24")
|
238   |
LNFT |
150.00 |
35,700.00 |
70.00 |
16,660.00 |
85.00 |
20,230.00 |
120.00 |
28,560.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
393.8 |
LNFT |
53.00 |
20,871.40 |
55.00 |
21,659.00 |
60.00 |
23,628.00 |
60.00 |
23,628.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
78.0 |
LNFT |
47.00 |
3,666.00 |
50.00 |
3,900.00 |
55.00 |
4,290.00 |
50.00 |
3,900.00 |
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
20.00 |
4,000.00 |
21.00 |
4,200.00 |
25.00 |
5,000.00 |
21.00 |
4,200.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,250.00 |
18,000.00 |
2,250.00 |
18,000.00 |
2,500.00 |
20,000.00 |
2,300.00 |
18,400.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
7,000.00 |
7,000.00 |
20,000.00 |
20,000.00 |
75,000.00 |
75,000.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
916   |
LNFT |
0.01 |
9.16 |
0.27 |
247.32 |
0.30 |
274.80 |
0.15 |
137.40 |
| 713-02-D |
temporary pavement markings (12" width)
|
3,258   |
LNFT |
0.01 |
32.58 |
0.40 |
1,303.20 |
0.50 |
1,629.00 |
0.20 |
651.60 |
| 713-02-E |
temporary pavement markings (24" width)
|
1,244   |
LNFT |
0.01 |
12.44 |
0.80 |
995.20 |
1.00 |
1,244.00 |
0.35 |
435.40 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.540 |
MILE |
200.00 |
908.00 |
150.00 |
681.00 |
400.00 |
1,816.00 |
600.00 |
2,724.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.620 |
MILE |
1.00 |
4.62 |
300.00 |
1,386.00 |
100.00 |
462.00 |
100.00 |
462.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
11.980 |
MILE |
1.00 |
11.98 |
300.00 |
3,594.00 |
100.00 |
1,198.00 |
100.00 |
1,198.00 |
| 726-01 |
bedding material
|
35.3 |
CUYD |
55.00 |
1,941.50 |
75.00 |
2,647.50 |
10.00 |
353.00 |
0.01 |
0.35 |
| 727-01 |
mobilization
|
lump |
LUMP |
74,000.00 |
74,000.00 |
66,928.20 |
66,928.20 |
60,000.00 |
60,000.00 |
75,000.00 |
75,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
72.00 |
576.00 |
75.00 |
600.00 |
80.00 |
640.00 |
72.97 |
583.76 |
| 731-02 |
reflectorized raised pavement markers
|
350   |
EACH |
5.15 |
1,802.50 |
5.50 |
1,925.00 |
6.00 |
2,100.00 |
6.00 |
2,100.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
458   |
LNFT |
1.00 |
458.00 |
1.00 |
458.00 |
1.25 |
572.50 |
1.25 |
572.50 |
| 732-01-D |
plastic pavement striping (12" width)
|
1,629   |
LNFT |
2.20 |
3,583.80 |
2.25 |
3,665.25 |
2.50 |
4,072.50 |
2.50 |
4,072.50 |
| 732-01-E |
plastic pavement striping (24" width)
|
622   |
LNFT |
4.50 |
2,799.00 |
4.50 |
2,799.00 |
5.00 |
3,110.00 |
5.00 |
3,110.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.990 |
MILE |
2,700.00 |
16,173.00 |
2,650.00 |
15,873.50 |
3,000.00 |
17,970.00 |
2,900.00 |
17,371.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.130 |
MILE |
700.00 |
1,491.00 |
750.00 |
1,597.50 |
800.00 |
1,704.00 |
850.00 |
1,810.50 |
| 735-01 |
mailboxes
|
60   |
EACH |
1.00 |
60.00 |
1.00 |
60.00 |
6.00 |
360.00 |
5.00 |
300.00 |
| 735-02 |
mailbox supports (single)
|
60   |
EACH |
90.00 |
5,400.00 |
100.00 |
6,000.00 |
100.00 |
6,000.00 |
135.00 |
8,100.00 |
| 739-01 |
hydro-seeding
|
2.75 |
ACRE |
1,200.00 |
3,300.00 |
1,200.00 |
3,300.00 |
1,500.00 |
4,125.00 |
1,300.00 |
3,575.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
14,000.00 |
14,000.00 |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
26,000.00 |
26,000.00 |
| S-001 |
surface preparation
|
lump |
LUMP |
70,000.00 |
70,000.00 |
11,495.23 |
11,495.23 |
35,000.00 |
35,000.00 |
50,000.00 |
50,000.00 |
| S-002 |
saw cutting
|
4,000   |
LNFT |
0.25 |
1,000.00 |
1.50 |
6,000.00 |
5.00 |
20,000.00 |
4.00 |
16,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
973,751.68 |
|
1,000,000.00 |
|
1,152,438.80 |
|
1,197,720.92 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
106   |
LNFT |
18.00 |
1,908.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
930   |
CUYD |
35.00 |
32,550.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
3.00 |
3,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,706.8 |
TON |
120.00 |
684,816.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,176.3 |
TON |
175.00 |
205,852.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
11,014   |
SQYD |
4.00 |
44,056.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 459   |
CUYD |
15.00 |
- 6,885.00 |
|
|
|
|
|
|
| 510-01-C |
pavement patching (8" minimum thickness)
|
227   |
SQYD |
100.00 |
22,700.00 |
|
|
|
|
|
|
| 510-01-D |
pavement patching (13.5" minimum thickness)
|
981   |
SQYD |
150.00 |
147,150.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
238   |
LNFT |
100.00 |
23,800.00 |
|
|
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
393.8 |
LNFT |
85.00 |
33,473.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
78.0 |
LNFT |
70.00 |
5,460.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
200.0 |
LNFT |
25.00 |
5,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,400.00 |
19,200.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
916   |
LNFT |
0.20 |
183.20 |
|
|
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
3,258   |
LNFT |
0.35 |
1,140.30 |
|
|
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
1,244   |
LNFT |
0.75 |
933.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.540 |
MILE |
400.00 |
1,816.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.620 |
MILE |
410.00 |
1,894.20 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
11.980 |
MILE |
425.00 |
5,091.50 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
35.3 |
CUYD |
100.00 |
3,530.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
155,000.00 |
155,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
90.00 |
720.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
350   |
EACH |
6.00 |
2,100.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
458   |
LNFT |
1.00 |
458.00 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,629   |
LNFT |
2.00 |
3,258.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
622   |
LNFT |
4.00 |
2,488.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.990 |
MILE |
2,700.00 |
16,173.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.130 |
MILE |
700.00 |
1,491.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
60   |
EACH |
6.00 |
360.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
60   |
EACH |
100.00 |
6,000.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
2.75 |
ACRE |
1,500.00 |
4,125.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-002 |
saw cutting
|
4,000   |
LNFT |
15.00 |
60,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,562,841.70 |
|
|
|
|
|
|
|