| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-07 |
borrow (vehicular measurement)
|
34   |
CUYD |
35.00 |
1,190.00 |
100.00 |
3,400.00 |
100.00 |
3,400.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
200   |
CUYD |
90.00 |
18,000.00 |
75.00 |
15,000.00 |
100.00 |
20,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
521.6 |
TON |
150.00 |
78,240.00 |
150.00 |
78,240.00 |
150.00 |
78,240.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
573   |
SQYD |
80.00 |
45,840.00 |
95.00 |
54,435.00 |
100.00 |
57,300.00 |
|
|
| 702-04-A |
adjusting manholes
|
6   |
EACH |
300.00 |
1,800.00 |
100.00 |
600.00 |
500.00 |
3,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
65,000.00 |
65,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
576   |
LNFT |
0.35 |
201.60 |
0.10 |
57.60 |
0.50 |
288.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
832   |
LNFT |
1.00 |
832.00 |
1.00 |
832.00 |
1.20 |
998.40 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.820 |
MILE |
400.00 |
1,528.00 |
85.00 |
324.70 |
400.00 |
1,528.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.424 |
MILE |
375.00 |
534.00 |
10.00 |
14.24 |
1.00 |
1.42 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
14.577 |
MILE |
525.00 |
7,652.93 |
10.00 |
145.77 |
1.00 |
14.58 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
8   |
EACH |
30.00 |
240.00 |
10.00 |
80.00 |
30.00 |
240.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
30.00 |
60.00 |
10.00 |
20.00 |
30.00 |
60.00 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
16   |
EACH |
55.00 |
880.00 |
50.00 |
800.00 |
60.00 |
960.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.2 |
TON |
5,000.00 |
1,000.00 |
5,000.00 |
1,000.00 |
6,000.00 |
1,200.00 |
|
|
| 717-01 |
seeding
|
2   |
LB |
10.00 |
20.00 |
125.00 |
250.00 |
60.00 |
120.00 |
|
|
| 718-01 |
fertilizer
|
73   |
LB |
10.00 |
730.00 |
6.00 |
438.00 |
6.00 |
438.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
65,000.00 |
65,000.00 |
75,000.00 |
75,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
256   |
EACH |
5.50 |
1,408.00 |
6.00 |
1,536.00 |
6.00 |
1,536.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
288   |
LNFT |
1.00 |
288.00 |
1.00 |
288.00 |
1.25 |
360.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
416   |
LNFT |
4.65 |
1,934.40 |
5.00 |
2,080.00 |
5.00 |
2,080.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.285 |
MILE |
3,250.00 |
23,676.25 |
2,800.00 |
20,398.00 |
3,200.00 |
23,312.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.710 |
MILE |
800.00 |
568.00 |
800.00 |
568.00 |
1,000.00 |
710.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
250.00 |
1,000.00 |
200.00 |
800.00 |
220.00 |
880.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
250.00 |
250.00 |
225.00 |
225.00 |
240.00 |
240.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
8   |
EACH |
250.00 |
2,000.00 |
250.00 |
2,000.00 |
250.00 |
2,000.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
8   |
EACH |
450.00 |
3,600.00 |
450.00 |
3,600.00 |
500.00 |
4,000.00 |
|
|
| 735-01 |
mailboxes
|
49   |
EACH |
1.10 |
53.90 |
1.00 |
49.00 |
2.00 |
98.00 |
|
|
| 735-02 |
mailbox supports (single)
|
26   |
EACH |
110.00 |
2,860.00 |
150.00 |
3,900.00 |
125.00 |
3,250.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
4   |
EACH |
250.00 |
1,000.00 |
450.00 |
1,800.00 |
260.00 |
1,040.00 |
|
|
| 736-09 |
loop detector
|
2,400   |
LNFT |
15.00 |
36,000.00 |
14.00 |
33,600.00 |
15.00 |
36,000.00 |
|
|
| 736-10 |
underground junction box
|
3   |
EACH |
600.00 |
1,800.00 |
575.00 |
1,725.00 |
600.00 |
1,800.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
23,000.00 |
23,000.00 |
10,000.00 |
10,000.00 |
|
|
| 741-11 |
adjusting water valve and meter box
|
2   |
EACH |
300.00 |
600.00 |
35.00 |
70.00 |
800.00 |
1,600.00 |
|
|
| S-003 |
detectable warning tiles
|
4.0 |
LNFT |
250.00 |
1,000.00 |
500.00 |
2,000.00 |
100.00 |
400.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
331,787.08 |
|
383,276.31 |
|
362,094.40 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,135.8 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
110.00 |
344,938.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
23,565   |
SQYD |
0.00 |
0.00 |
0.00 |
0.00 |
3.50 |
82,477.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 982   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
0.00 |
0.00 |
0.00 |
0.00 |
10,000.00 |
10,000.00 |
|
|
| | SUBTOTAL ALT A1 |
|
|
|
|
|
|
|
437,415.50 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
|
|
|
|
|
|
|
|
|
|
|
| S-002 |
ultra-thin hmac wearing course system (0.75 inch thick)
|
28,278   |
SQYD |
9.35 |
264,399.30 |
9.60 |
271,468.80 |
0.00 |
0.00 |
|
|
| | SUBTOTAL ALT A2 |
|
|
|
264,399.30 |
|
271,468.80 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
596,186.38 |
|
654,745.11 |
|
799,509.90 |
|
|
|