Lead Project: 838-03-0023
Parish: PLAQUEMINES
Routes: LA 406
Description: WOODLAND HWY. IMPROVEMENTS (LA 23 TO PLANTERS CANAL)-PHASE 1
Type Const: grading, drain struct, class ii bc, surface preparation, superpave asphaltic concrete
pavement and related work.
Estimated Construction Cost: $2,396,284.13
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $2,477,840.07
2 27634 PHYLWAY CONSTRUCTION LLC $2,631,013.80
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $2,965,734.58
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
PHYLWAY CONSTRUCTION LLC
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 500      SQYD 16.60 8,300.00 15.00 7,500.00 15.00 7,500.00    
202-02-E removal of concrete curbs 180.0    LNFT 14.50 2,610.00 22.00 3,960.00 20.00 3,600.00    
202-02-G removal of surfacing & stabilized base 2,350.0    SQYD 14.50 34,075.00 13.00 30,550.00 10.00 23,500.00    
202-02-H removal of guard rail 712      LNFT 6.00 4,272.00 10.00 7,120.00 8.00 5,696.00    
202-02-I removal of small plants (less than 3 ft. tall) 50      EACH 91.00 4,550.00 40.00 2,000.00 10.00 500.00    
203-01 general excavation 5,317      CUYD 12.50 66,462.50 15.00 79,755.00 30.00 159,510.00    
203-02 drainage excavation 4,525      CUYD 12.00 54,300.00 15.00 67,875.00 30.00 135,750.00    
203-04 nonplastic embankment 21,000      CUYD 23.00 483,000.00 22.00 462,000.00 27.00 567,000.00    
203-07 borrow (vehicular measurement) 2,350      CUYD 29.00 68,150.00 18.00 42,300.00 27.00 63,450.00    
203-07-B borrow (vehicular meas.)(plastic soils) 2,950      CUYD 21.00 61,950.00 28.00 82,600.00 27.00 79,650.00    
302-02-F class ii base course (12" thick) 9,500.0    SQYD 22.50 213,750.00 30.00 285,000.00 30.00 285,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
100      CUYD 100.00 10,000.00 110.00 11,000.00 70.00 7,000.00    
502-01 superpave asphaltic concrete 6,922.0    TON 101.00 699,122.00 110.00 761,420.00 100.00 692,200.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
393.3    TON 204.00 80,233.20 200.00 78,660.00 180.00 70,794.00    
701-01-I cross drain pipe (24" cmp) 80      LNFT 130.00 10,400.00 110.00 8,800.00 180.00 14,400.00    
701-05-M side drain pipe (36") 180      LNFT 148.00 26,640.00 118.00 21,240.00 190.00 34,200.00    
702-03-B catch basins (cb-02) 7      EACH 4,700.00 32,900.00 4,000.00 28,000.00 5,000.00 35,000.00    
704-03 blocked out guard rail 93.8    LNFT 24.25 2,274.65 23.00 2,157.40 25.00 2,345.00    
704-07-A guard rail bridge attachments (single thrie beam) 100.0    LNFT 61.00 6,100.00 60.00 6,000.00 60.00 6,000.00    
704-08-B guard rail transitions (double thrie beam) 193.8    LNFT 73.00 14,147.40 70.00 13,566.00 70.00 13,566.00    
704-11-A guard rail end treatment (flared) 8      EACH 3,030.00 24,240.00 2,700.00 21,600.00 2,800.00 22,400.00    
707-01 concrete curb 180.0    LNFT 37.00 6,660.00 45.00 8,100.00 60.00 10,800.00    
711-04 geotextile fabric 300      SQYD 1.40 420.00 2.50 750.00 5.00 1,500.00    
713-01 temporary signs & barricades lump      LUMP 115,000.00 115,000.00 80,000.00 80,000.00 300,000.00 300,000.00    
713-02-E temporary pavement markings (24" width) 1,195      LNFT 1.16 1,386.20 1.00 1,195.00 1.00 1,195.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.876  MILE 360.00 2,835.36 400.00 3,150.40 10.00 78.76    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.020  MILE 480.00 2,409.60 450.00 2,259.00 15.00 75.30    
713-04-A temporary pavement markings (solid line)(4" width) 11.976  MILE 950.00 11,377.20 850.00 10,179.60 20.00 239.52    
717-01 seeding 141      LB 31.50 4,441.50 15.00 2,115.00 20.00 2,820.00    
718-01 fertilizer 4,700      LB 1.75 8,225.00 1.20 5,640.00 1.00 4,700.00    
726-01 bedding material 80.0    CUYD 66.00 5,280.00 90.00 7,200.00 60.00 4,800.00    
727-01 mobilization lump      LUMP 240,000.00 240,000.00 260,000.00 260,000.00 280,000.00 280,000.00    
729-16-C object marker assembly (type 3) 8      EACH 97.00 776.00 90.00 720.00 100.00 800.00    
731-02 reflectorized raised pavement markers 1,018      EACH 6.20 6,311.60 5.50 5,599.00 6.00 6,108.00    
732-01-E plastic pavement striping (24" width) 654      LNFT 4.80 3,139.20 4.00 2,616.00 4.00 2,616.00    
732-02-A plastic pavement striping (solid line) (4" width) 5.988  MILE 3,500.00 20,958.00 2,800.00 16,766.40 3,000.00 17,964.00    
732-03-A plastic pavement striping (broken line)(4" width) 2.560  MILE 861.00 2,204.16 750.00 1,920.00 700.00 1,792.00    
732-04-A plastic pavement legends & symbols (arrow) 34      EACH 237.00 8,058.00 300.00 10,200.00 200.00 6,800.00    
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 237.00 474.00 300.00 600.00 400.00 800.00    
732-04-C plastic pavement legends & symbols (only) 3      EACH 237.00 711.00 300.00 900.00 300.00 900.00    
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 237.00 237.00 500.00 500.00 450.00 450.00    
735-01 mailboxes 6      EACH 250.00 1,500.00 10.00 60.00 10.00 60.00    
735-02 mailbox supports (single) 6      EACH 6.00 36.00 120.00 720.00 150.00 900.00    
740-01 construction layout lump      LUMP 46,000.00 46,000.00 70,000.00 70,000.00 20,000.00 20,000.00    
S-001 cleaning existing culverts (16 to 48 inches) 200      LNFT 11.00 2,200.00 20.00 4,000.00 15.00 3,000.00    
S-002 relocation of existing landscape lighting 1      EACH 7,200.00 7,200.00 2,500.00 2,500.00 7,000.00 7,000.00    
S-003 full depth saw cut of existing pavement 700      LNFT 11.00 7,700.00 5.00 3,500.00 5.00 3,500.00    
S-004 surface preparation lump      LUMP 26,600.00 26,600.00 42,000.00 42,000.00 30,000.00 30,000.00    
S-005 geotextile fabric 26,200      SQYD 1.40 36,680.00 2.35 61,570.00 1.00 26,200.00    
S-006 rumble strips (ground-in) 3.15   MILE 490.00 1,543.50 1,000.00 3,150.00 500.00 1,575.00    
                       
 CONTRACTOR TOTAL       2,477,840.07   2,631,013.80   2,965,734.58    