| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RMD HOLDINGS LTD |
- 2 - T-MAC, INC. |
- 3 - WALLACE C. DRENNAN, INC. |
COMMAND CONSTRUCTION INDUSTRIES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
30,000.00 |
30,000.00 |
85,000.00 |
85,000.00 |
366,000.00 |
366,000.00 |
150,000.00 |
150,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
2,404   |
SQYD |
12.00 |
28,848.00 |
14.00 |
33,656.00 |
25.00 |
60,100.00 |
25.00 |
60,100.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
2,001.0 |
LNFT |
15.00 |
30,015.00 |
10.00 |
20,010.00 |
3.00 |
6,003.00 |
20.00 |
40,020.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,270.7 |
SQYD |
12.75 |
28,951.43 |
15.00 |
34,060.50 |
55.00 |
124,888.50 |
20.00 |
45,414.00 |
| 204-02 |
temporary hay or straw bales
|
40   |
EACH |
50.00 |
2,000.00 |
15.00 |
600.00 |
20.00 |
800.00 |
15.00 |
600.00 |
| 302-02-C-01 |
class ii base course (8" thick)(stone or recycled pccp)
|
70.7 |
SQYD |
36.00 |
2,545.20 |
75.00 |
5,302.50 |
150.00 |
10,605.00 |
100.00 |
7,070.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
78.00 |
7,800.00 |
65.00 |
6,500.00 |
100.00 |
10,000.00 |
75.00 |
7,500.00 |
| 502-01 |
superpave asphaltic concrete
|
452.6 |
TON |
260.00 |
117,676.00 |
230.00 |
104,098.00 |
260.00 |
117,676.00 |
225.00 |
101,835.00 |
| 509-01 |
cold planing asphaltic pavement
|
3,320   |
SQYD |
10.00 |
33,200.00 |
10.00 |
33,200.00 |
12.00 |
39,840.00 |
10.00 |
33,200.00 |
| 601-01-A |
portland cement concrete pavement (5" thick)
|
317.9 |
SQYD |
100.00 |
31,790.00 |
75.00 |
23,842.50 |
120.00 |
38,148.00 |
100.00 |
31,790.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,400.00 |
5,400.00 |
35,000.00 |
35,000.00 |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
| 713-04-A-01 |
temporary pvmt. markings (solid line)(4" w)(type i
removable) |
1.136 |
MILE |
10,500.00 |
11,928.00 |
18,000.00 |
20,448.00 |
21,000.00 |
23,856.00 |
10,500.00 |
11,928.00 |
| 719-01-A |
plants (savannah holly (llex x attenuata, 2-2.5" cal,
25 gal., 10-12' ht)) |
40   |
EACH |
820.00 |
32,800.00 |
300.00 |
12,000.00 |
500.00 |
20,000.00 |
350.00 |
14,000.00 |
| 719-03 |
bed preparation (14" depth)
|
60   |
SQYD |
36.00 |
2,160.00 |
65.00 |
3,900.00 |
50.00 |
3,000.00 |
50.00 |
3,000.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
1,000.00 |
1,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
400,000.00 |
400,000.00 |
310,000.00 |
310,000.00 |
366,000.00 |
366,000.00 |
250,000.00 |
250,000.00 |
| 729-01 |
sign (type a)
|
42.5 |
SQFT |
20.00 |
850.00 |
23.00 |
977.50 |
24.00 |
1,020.00 |
25.00 |
1,062.50 |
| 729-08-A |
mounting (2 1/2" post)
|
10   |
EACH |
875.00 |
8,750.00 |
200.00 |
2,000.00 |
1,100.00 |
11,000.00 |
150.00 |
1,500.00 |
| 730-04 |
jacking or bored casing (4" pvc, communication)
|
4,050   |
LNFT |
16.00 |
64,800.00 |
20.00 |
81,000.00 |
20.00 |
81,000.00 |
15.00 |
60,750.00 |
| 730-09 |
electrical system
|
lump |
LUMP |
103,000.00 |
103,000.00 |
60,000.00 |
60,000.00 |
80,000.00 |
80,000.00 |
100,000.00 |
100,000.00 |
| 730-11 |
removal and disposal of electrical equipment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
2,500.00 |
2,500.00 |
19,000.00 |
19,000.00 |
25,000.00 |
25,000.00 |
| 730-16 |
underground junction box (type g, communications)
|
5   |
EACH |
2,356.00 |
11,780.00 |
1,000.00 |
5,000.00 |
7,000.00 |
35,000.00 |
7,500.00 |
37,500.00 |
| 731-02 |
reflectorized raised pavement markers
|
20   |
EACH |
5.50 |
110.00 |
5.50 |
110.00 |
10.00 |
200.00 |
10.00 |
200.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
2,765   |
LNFT |
0.55 |
1,520.75 |
0.55 |
1,520.75 |
1.00 |
2,765.00 |
1.00 |
2,765.00 |
| 732-01-B |
plastic pavement striping (6" width)
|
81   |
LNFT |
0.90 |
72.90 |
0.90 |
72.90 |
1.00 |
81.00 |
4.00 |
324.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
163   |
LNFT |
4.50 |
733.50 |
4.50 |
733.50 |
5.00 |
815.00 |
5.00 |
815.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
200.00 |
600.00 |
220.00 |
660.00 |
250.00 |
750.00 |
300.00 |
900.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
225.00 |
225.00 |
240.00 |
240.00 |
300.00 |
300.00 |
300.00 |
300.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
200.00 |
400.00 |
250.00 |
500.00 |
350.00 |
700.00 |
300.00 |
600.00 |
| 732-04-F |
plastic pavement legends & symbols (bike lane)
|
4   |
EACH |
300.00 |
1,200.00 |
400.00 |
1,600.00 |
450.00 |
1,800.00 |
400.00 |
1,600.00 |
| 736-10-A |
underground junction box (type "e")
|
1   |
EACH |
824.00 |
824.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 736-11-B |
conduit (2" pvc schedule 80)
|
60   |
LNFT |
12.00 |
720.00 |
9.00 |
540.00 |
9.00 |
540.00 |
5.00 |
300.00 |
| 736-12-A |
conductor (14 awg stranded)
|
635   |
LNFT |
3.30 |
2,095.50 |
3.50 |
2,222.50 |
3.00 |
1,905.00 |
3.00 |
1,905.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
60,000.00 |
60,000.00 |
70,000.00 |
70,000.00 |
150,000.00 |
150,000.00 |
| S-001 |
brick pavers (sidewalk & 5" pcc base/mortar set)
|
1,822.5 |
SQYD |
365.00 |
665,212.50 |
300.00 |
546,750.00 |
375.00 |
683,437.50 |
250.00 |
455,625.00 |
| S-002 |
brick pavers (parking, 8" pcc & base / hot mixed
asphalt set) |
916.6 |
SQYD |
447.00 |
409,720.20 |
350.00 |
320,810.00 |
450.00 |
412,470.00 |
275.00 |
252,065.00 |
| S-003 |
brick pavers (crosswalk, 8" pcc & base / hot mixed
asphalt set) |
404.2 |
SQYD |
447.00 |
180,677.40 |
350.00 |
141,470.00 |
475.00 |
191,995.00 |
275.00 |
111,155.00 |
| S-004 |
brick pavers (bus pad, 8" pcc & base / hot mixed
asphalt set) |
55.1 |
SQYD |
447.00 |
24,629.70 |
350.00 |
19,285.00 |
525.00 |
28,927.50 |
275.00 |
15,152.50 |
| S-005 |
precast detectable warning pavers
|
224.0 |
SQFT |
33.00 |
7,392.00 |
60.00 |
13,440.00 |
50.00 |
11,200.00 |
50.00 |
11,200.00 |
| S-006 |
stone curb including backing (straight&circular,
granite 6" x 18") |
1,755   |
LNFT |
59.00 |
103,545.00 |
450.00 |
789,750.00 |
125.00 |
219,375.00 |
125.00 |
219,375.00 |
| S-007 |
standard driveways (pcc & brick)
|
244.7 |
SQYD |
366.00 |
89,560.20 |
195.00 |
47,716.50 |
175.00 |
42,822.50 |
250.00 |
61,175.00 |
| S-008 |
heavy duty driveways (pcc & brick)
|
163.3 |
SQYD |
573.00 |
93,570.90 |
320.00 |
52,256.00 |
325.00 |
53,072.50 |
275.00 |
44,907.50 |
| S-009 |
specialty pavement (colored concrete and decorative
paving, pcc) |
291.7 |
SQYD |
128.00 |
37,337.60 |
195.00 |
56,881.50 |
800.00 |
233,360.00 |
325.00 |
94,802.50 |
| S-020 |
removal of trees (less than 6" diameter)
|
2   |
EACH |
250.00 |
500.00 |
230.00 |
460.00 |
500.00 |
1,000.00 |
750.00 |
1,500.00 |
| S-021 |
uplight
|
85   |
EACH |
1,358.00 |
115,430.00 |
1,800.00 |
153,000.00 |
1,700.00 |
144,500.00 |
1,000.00 |
85,000.00 |
| S-022 |
ddd pedestrian lightpoles
|
22   |
EACH |
15,600.00 |
343,200.00 |
18,000.00 |
396,000.00 |
19,000.00 |
418,000.00 |
5,000.00 |
110,000.00 |
| S-023 |
tree planter
|
40   |
EACH |
636.00 |
25,440.00 |
500.00 |
20,000.00 |
900.00 |
36,000.00 |
200.00 |
8,000.00 |
| S-024 |
pay and display parking meter
|
1   |
EACH |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
18,000.00 |
18,000.00 |
2,000.00 |
2,000.00 |
| S-025 |
irrigation system
|
lump |
LUMP |
3,000.00 |
3,000.00 |
38,000.00 |
38,000.00 |
15,000.00 |
15,000.00 |
1,000.00 |
1,000.00 |
| S-030 |
removal of existing signal equipment
|
lump |
LUMP |
10,690.00 |
10,690.00 |
2,500.00 |
2,500.00 |
7,000.00 |
7,000.00 |
25,000.00 |
25,000.00 |
| S-031 |
signal support (new orleans historic w/ 20' dual mast
arms) |
1   |
EACH |
34,550.00 |
34,550.00 |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
| S-032 |
signal support (new orleans historic pedestal pole)
|
3   |
EACH |
4,221.00 |
12,663.00 |
2,500.00 |
7,500.00 |
4,000.00 |
12,000.00 |
3,000.00 |
9,000.00 |
| S-033 |
signal heads (3-section, r/y/g) l.e.d.
|
12   |
EACH |
1,375.00 |
16,500.00 |
1,000.00 |
12,000.00 |
1,000.00 |
12,000.00 |
900.00 |
10,800.00 |
| S-034 |
led countdown pedestrian signal modules
|
6   |
EACH |
1,421.00 |
8,526.00 |
9,000.00 |
54,000.00 |
2,500.00 |
15,000.00 |
2,000.00 |
12,000.00 |
| S-035 |
removal and relocation of type "a" sign
|
12   |
EACH |
292.00 |
3,504.00 |
165.00 |
1,980.00 |
1,000.00 |
12,000.00 |
250.00 |
3,000.00 |
| S-036 |
removal and relocation of traffic loop
|
87.5 |
LNFT |
14.00 |
1,225.00 |
12.00 |
1,050.00 |
30.00 |
2,625.00 |
15.00 |
1,312.50 |
| S-040 |
manholes (d-870, type 1)
|
8   |
EACH |
4,800.00 |
38,400.00 |
8,800.00 |
70,400.00 |
5,000.00 |
40,000.00 |
4,000.00 |
32,000.00 |
| S-041 |
catch basin (d-873)
|
5   |
EACH |
4,800.00 |
24,000.00 |
8,800.00 |
44,000.00 |
8,000.00 |
40,000.00 |
4,000.00 |
20,000.00 |
| S-042 |
catch basin (d-3431-a)
|
3   |
EACH |
4,800.00 |
14,400.00 |
10,000.00 |
30,000.00 |
3,500.00 |
10,500.00 |
4,000.00 |
12,000.00 |
| S-043 |
adjusting manholes
|
7   |
EACH |
1,200.00 |
8,400.00 |
1,200.00 |
8,400.00 |
900.00 |
6,300.00 |
100.00 |
700.00 |
| S-044 |
adjusting catch basins
|
5   |
EACH |
1,200.00 |
6,000.00 |
2,200.00 |
11,000.00 |
4,000.00 |
20,000.00 |
100.00 |
500.00 |
| S-045 |
convert manhole to catch basin
|
2   |
EACH |
750.00 |
1,500.00 |
8,700.00 |
17,400.00 |
5,000.00 |
10,000.00 |
2,000.00 |
4,000.00 |
| S-046 |
10"x10"x12" concrete wye
|
3   |
EACH |
750.00 |
2,250.00 |
3,500.00 |
10,500.00 |
500.00 |
1,500.00 |
100.00 |
300.00 |
| S-047 |
15"x15"x12" concrete wye
|
1   |
EACH |
960.00 |
960.00 |
5,500.00 |
5,500.00 |
500.00 |
500.00 |
1,000.00 |
1,000.00 |
| S-048 |
24"x24"x12" concrete wye
|
1   |
EACH |
1,260.00 |
1,260.00 |
6,000.00 |
6,000.00 |
750.00 |
750.00 |
1,000.00 |
1,000.00 |
| S-049 |
fire hydrant relocation
|
2   |
EACH |
2,400.00 |
4,800.00 |
6,000.00 |
12,000.00 |
4,000.00 |
8,000.00 |
3,000.00 |
6,000.00 |
| S-050 |
install sewer mains (8" pvc x 7' depth)
|
544   |
LNFT |
57.00 |
31,008.00 |
100.00 |
54,400.00 |
150.00 |
81,600.00 |
200.00 |
108,800.00 |
| S-051 |
new sewer house connections from main to back of curb
|
4   |
EACH |
1,200.00 |
4,800.00 |
1,200.00 |
4,800.00 |
2,500.00 |
10,000.00 |
1,000.00 |
4,000.00 |
| S-052 |
install 4" and 8" water line
|
lump |
LUMP |
3,600.00 |
3,600.00 |
54,000.00 |
54,000.00 |
40,000.00 |
40,000.00 |
1,000.00 |
1,000.00 |
| S-053 |
storm drain pipe (12" rcp/pcp)
|
29   |
LNFT |
72.00 |
2,088.00 |
125.00 |
3,625.00 |
200.00 |
5,800.00 |
125.00 |
3,625.00 |
| S-054 |
storm drain pipe (15" rcp/pcp)
|
155   |
LNFT |
75.00 |
11,625.00 |
130.00 |
20,150.00 |
150.00 |
23,250.00 |
150.00 |
23,250.00 |
| S-055 |
storm drain pipe (18" rcp/pcp)
|
67   |
LNFT |
84.00 |
5,628.00 |
135.00 |
9,045.00 |
180.00 |
12,060.00 |
175.00 |
11,725.00 |
| S-056 |
storm drain pipe (24" rcp/pcp)
|
262   |
LNFT |
150.00 |
39,300.00 |
150.00 |
39,300.00 |
190.00 |
49,780.00 |
200.00 |
52,400.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,397,187.78 |
|
4,071,163.65 |
|
4,544,617.50 |
|
IRREGULAR |
|