Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 742-17-0147
Parish: E BATON ROUGE
Routes:
Description: CENTRAL THRUWAY BRIDGES (SULLIVAN AND ICCN RR)
Type Const: concrete girder span bridges, approach slabs and related work.
Estimated Construction Cost: $12,132,825.90
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $9,486,301.80
2 14422 T. L. WALLACE CONSTRUCTION, INC. $9,639,899.65
3 12312 GILCHRIST CONSTRUCTION CO. LLC $10,366,086.30
4 12370 HILL BROTHERS CONSTRUCTION CO., INC $10,686,433.90
5 00755 L & A CONTRACTING CO. $10,793,330.25
6 09476 KEY CONSTRUCTORS, INC. $11,326,587.25
7 02179 BOH BROS. CONSTRUCTION CO., LLC. $13,544,954.30
8 00060 F. MILLER CONSTRUCTION LLC $13,999,882.38
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
T. L. WALLACE CONSTRUCTION, INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
HILL BROTHERS CONSTRUCTION CO., INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
701-05-G-01 side drain pipe (18")(bridge end drain) 415      LNFT 38.00 15,770.00 30.00 12,450.00 55.00 22,825.00 50.00 20,750.00
702-03-A catch basins (cb-01) 6      EACH 4,900.00 29,400.00 3,000.00 18,000.00 4,500.00 27,000.00 3,500.00 21,000.00
712-04 flexible revetment 1,902      SQYD 60.00 114,120.00 62.00 117,924.00 45.00 85,590.00 65.00 123,630.00
727-01 mobilization lump      LUMP 940,000.00 940,000.00 514,000.00 514,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00
729-16-A object marker assembly (type 1) 4      EACH 90.00 360.00 200.00 800.00 200.00 800.00 165.00 660.00
740-01 construction layout lump      LUMP 90,000.00 90,000.00 135,000.00 135,000.00 150,000.00 150,000.00 90,000.00 90,000.00
804-01-B precast concrete piles (14") 310      LNFT 80.00 24,800.00 71.00 22,010.00 65.00 20,150.00 60.00 18,600.00
804-01-F precast concrete piles (24") 19,974      LNFT 86.00 1,717,764.00 87.00 1,737,738.00 83.00 1,657,842.00 85.00 1,697,790.00
804-05 precast concrete test piles 2      EACH 40,000.00 80,000.00 25,000.00 50,000.00 60,000.00 120,000.00 12,000.00 24,000.00
804-09 loading test piles 2      EACH 20,000.00 40,000.00 28,000.00 56,000.00 35,000.00 70,000.00 30,000.00 60,000.00
804-10 reloading test piles 2      EACH 4,000.00 8,000.00 4,000.00 8,000.00 1,000.00 2,000.00 4,000.00 8,000.00
804-11 redriving test piles 2      EACH 4,000.00 8,000.00 4,000.00 8,000.00 1,000.00 2,000.00 10,000.00 20,000.00
804-12 loading permanent piles 2      EACH 6,000.00 12,000.00 15,000.00 30,000.00 5,000.00 10,000.00 30,000.00 60,000.00
804-17 dynamic monitoring 2      EACH 3,000.00 6,000.00 1,500.00 3,000.00 3,000.00 6,000.00 2,500.00 5,000.00
805-01-F class a concrete (bents) 1,056.00   CUYD 580.00 612,480.00 510.00 538,560.00 500.00 528,000.00 550.00 580,800.00
805-03 class aa concrete 4,181.81   CUYD 520.00 2,174,541.20 630.00 2,634,540.30 700.00 2,927,267.00 700.00 2,927,267.00
805-08-C precast-prestressed concrete girders (type iii) 18,850.1    LNFT 80.00 1,508,008.00 102.00 1,922,710.20 95.00 1,790,759.50 95.00 1,790,759.50
805-08-J precast-prestressed concrete girders (type bt-63) 1,314.0    LNFT 215.00 282,510.00 167.00 219,438.00 175.00 229,950.00 165.00 216,810.00
805-11 strip seal joints 336.00   LNFT 155.00 52,080.00 143.00 48,048.00 180.00 60,480.00 150.00 50,400.00
806-01 deformed reinforcing steel 1,255,640      LB 0.80 1,004,512.00 0.72 904,060.80 0.72 904,060.80 0.90 1,130,076.00
807-08 structural metalwork lump      LUMP 70,000.00 70,000.00 50,000.00 50,000.00 60,000.00 60,000.00 85,000.00 85,000.00
810-01-A concrete railing (barrier) 3,814.00   LNFT 45.00 171,630.00 44.50 169,723.00 56.00 213,584.00 60.00 228,840.00
810-01-B concrete railing (median barrier) 1,835.00   LNFT 55.00 100,925.00 72.75 133,496.25 66.00 121,110.00 70.00 128,450.00
813-01 concrete approach slabs 1,493.34   SQYD 240.00 358,401.60 165.00 246,401.10 200.00 298,668.00 210.00 313,601.40
S-101 kinetic impact attenuators 4      EACH 15,000.00 60,000.00 14,000.00 56,000.00 14,000.00 56,000.00 20,000.00 80,000.00
S-102 dynamic analysis 2      EACH 2,500.00 5,000.00 2,000.00 4,000.00 1,000.00 2,000.00 2,500.00 5,000.00
                       
 CONTRACTOR TOTAL       9,486,301.80   9,639,899.65   10,366,086.30   10,686,433.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
L & A CONTRACTING CO.
- 6 -
KEY CONSTRUCTORS, INC.
- 7 -
BOH BROS. CONSTRUCTION CO., LLC.
- 8 -
F. MILLER CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
701-05-G-01 side drain pipe (18")(bridge end drain) 415      LNFT 90.00 37,350.00 50.00 20,750.00 75.00 31,125.00 60.00 24,900.00
702-03-A catch basins (cb-01) 6      EACH 4,200.00 25,200.00 2,850.00 17,100.00 4,500.00 27,000.00 4,000.00 24,000.00
712-04 flexible revetment 1,902      SQYD 66.00 125,532.00 70.00 133,140.00 75.00 142,650.00 75.00 142,650.00
727-01 mobilization lump      LUMP 800,000.00 800,000.00 985,000.00 985,000.00 1,350,000.00 1,350,000.00 1,300,000.00 1,300,000.00
729-16-A object marker assembly (type 1) 4      EACH 250.00 1,000.00 185.00 740.00 100.00 400.00 90.00 360.00
740-01 construction layout lump      LUMP 353,125.00 353,125.00 100,000.00 100,000.00 260,000.00 260,000.00 200,000.00 200,000.00
804-01-B precast concrete piles (14") 310      LNFT 91.00 28,210.00 60.00 18,600.00 45.00 13,950.00 95.00 29,450.00
804-01-F precast concrete piles (24") 19,974      LNFT 86.00 1,717,764.00 110.00 2,197,140.00 118.00 2,356,932.00 100.00 1,997,400.00
804-05 precast concrete test piles 2      EACH 18,212.00 36,424.00 30,000.00 60,000.00 15,500.00 31,000.00 41,000.00 82,000.00
804-09 loading test piles 2      EACH 15,000.00 30,000.00 5,000.00 10,000.00 50,000.00 100,000.00 23,000.00 46,000.00
804-10 reloading test piles 2      EACH 3,300.00 6,600.00 2,000.00 4,000.00 1,000.00 2,000.00 2,800.00 5,600.00
804-11 redriving test piles 2      EACH 4,380.00 8,760.00 2,000.00 4,000.00 1,500.00 3,000.00 100.00 200.00
804-12 loading permanent piles 2      EACH 5,000.00 10,000.00 2,000.00 4,000.00 50,000.00 100,000.00 100.00 200.00
804-17 dynamic monitoring 2      EACH 5,155.00 10,310.00 2,500.00 5,000.00 4,900.00 9,800.00 1,000.00 2,000.00
805-01-F class a concrete (bents) 1,056.00   CUYD 677.00 714,912.00 640.00 675,840.00 935.00 987,360.00 810.00 855,360.00
805-03 class aa concrete 4,181.81   CUYD 646.00 2,701,449.26 575.00 2,404,540.75 730.00 3,052,721.30 968.00 4,047,992.08
805-08-C precast-prestressed concrete girders (type iii) 18,850.1    LNFT 96.53 1,819,600.15 120.00 2,262,012.00 125.00 2,356,262.50 145.00 2,733,264.50
805-08-J precast-prestressed concrete girders (type bt-63) 1,314.0    LNFT 166.43 218,689.02 200.00 262,800.00 330.00 433,620.00 350.00 459,900.00
805-11 strip seal joints 336.00   LNFT 167.60 56,313.60 180.00 60,480.00 200.00 67,200.00 275.00 92,400.00
806-01 deformed reinforcing steel 1,255,640      LB 0.90 1,130,076.00 0.95 1,192,858.00 1.00 1,255,640.00 0.90 1,130,076.00
807-08 structural metalwork lump      LUMP 115,660.00 115,660.00 65,000.00 65,000.00 60,000.00 60,000.00 95,000.00 95,000.00
810-01-A concrete railing (barrier) 3,814.00   LNFT 68.00 259,352.00 65.00 247,910.00 75.00 286,050.00 55.00 209,770.00
810-01-B concrete railing (median barrier) 1,835.00   LNFT 93.00 170,655.00 105.00 192,675.00 85.00 155,975.00 75.00 137,625.00
813-01 concrete approach slabs 1,493.34   SQYD 233.00 347,948.22 225.00 336,001.50 275.00 410,668.50 220.00 328,534.80
S-101 kinetic impact attenuators 4      EACH 16,200.00 64,800.00 16,000.00 64,000.00 12,000.00 48,000.00 13,000.00 52,000.00
S-102 dynamic analysis 2      EACH 1,800.00 3,600.00 1,500.00 3,000.00 1,800.00 3,600.00 1,600.00 3,200.00
                       
 CONTRACTOR TOTAL       10,793,330.25   11,326,587.25   13,544,954.30   13,999,882.38