| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - RCS CONTRACTORS, INC. |
- 4 - F. MILLER CONSTRUCTION LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
14,500.00 |
14,500.00 |
| 202-02-A-01 |
removal of bridges (sta. 3+198.5, 5.8m x 11.7m timber
bridge) |
1   |
ea |
12,500.00 |
12,500.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
21,000.00 |
21,000.00 |
| 202-02-A-02 |
removal of bridges (sta. 3+160, 6.1m x 7.2m timber
bridge) |
1   |
ea |
16,000.00 |
16,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
| 202-02-A-03 |
removal of bridges (sta. 3+183.1, 6.2m x 16.6m timber
bridge) |
1   |
ea |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
36,000.00 |
36,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,024.6 |
sq m |
5.00 |
5,123.00 |
10.00 |
10,246.00 |
6.00 |
6,147.60 |
11.50 |
11,782.90 |
| 203-04 |
nonplastic embankment
|
121   |
cu m |
100.00 |
12,100.00 |
100.00 |
12,100.00 |
55.00 |
6,655.00 |
175.00 |
21,175.00 |
| 203-05 |
excavation and embankment
|
lump |
lump |
45,000.00 |
45,000.00 |
100,000.00 |
100,000.00 |
135,000.00 |
135,000.00 |
55,000.00 |
55,000.00 |
| 204-02 |
temporary hay or straw bales
|
120   |
ea |
10.00 |
1,200.00 |
10.00 |
1,200.00 |
16.50 |
1,980.00 |
15.50 |
1,860.00 |
| 204-03 |
temporary slope drains
|
60   |
ln m |
1.00 |
60.00 |
150.00 |
9,000.00 |
50.00 |
3,000.00 |
90.00 |
5,400.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
12   |
ea |
100.00 |
1,200.00 |
225.00 |
2,700.00 |
198.00 |
2,376.00 |
185.00 |
2,220.00 |
| 204-06 |
temporary silt fencing
|
300   |
ln m |
6.00 |
1,800.00 |
3.00 |
900.00 |
10.90 |
3,270.00 |
3.10 |
930.00 |
| 302-01 |
class ii base course
|
289.2 |
cu m |
130.00 |
37,596.00 |
125.00 |
36,150.00 |
190.39 |
55,060.79 |
110.00 |
31,812.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
52   |
cu m |
130.00 |
6,760.00 |
95.00 |
4,940.00 |
190.39 |
9,900.28 |
105.00 |
5,460.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
77.8 |
cu m |
130.00 |
10,114.00 |
95.00 |
7,391.00 |
175.00 |
13,615.00 |
165.00 |
12,837.00 |
| 502-01 |
superpave asphaltic concrete
|
266.6 |
Mg |
275.00 |
73,315.00 |
250.00 |
66,650.00 |
250.00 |
66,650.00 |
340.00 |
90,644.00 |
| 701-05-G-01 |
side drain pipe (450 mm) (erosion)
|
12.0 |
ln m |
175.00 |
2,100.00 |
200.00 |
2,400.00 |
254.10 |
3,049.20 |
170.00 |
2,040.00 |
| 701-05-M |
side drain pipe (900 mm)
|
2.0 |
ln m |
405.00 |
810.00 |
500.00 |
1,000.00 |
316.80 |
633.60 |
305.00 |
610.00 |
| 701-05-M-01 |
side drain pipe (900 mm) (erosion)
|
145.0 |
ln m |
465.00 |
67,425.00 |
350.00 |
50,750.00 |
316.80 |
45,936.00 |
255.00 |
36,975.00 |
| 701-05-N-01 |
side drain pipe (1050 mm) (erosion)
|
14.0 |
ln m |
565.00 |
7,910.00 |
400.00 |
5,600.00 |
358.88 |
5,024.32 |
335.00 |
4,690.00 |
| 701-05-O-01 |
side drain pipe (1200 mm) (erosion)
|
30.0 |
ln m |
670.00 |
20,100.00 |
450.00 |
13,500.00 |
433.00 |
12,990.00 |
175.00 |
5,250.00 |
| 701-05-Q |
side drain pipe (1500 mm)
|
26.6 |
ln m |
1,375.00 |
36,575.00 |
750.00 |
19,950.00 |
753.00 |
20,029.80 |
720.00 |
19,152.00 |
| 701-05-Q-01 |
side drain pipe (1500 mm) (erosion)
|
40.2 |
ln m |
1,375.00 |
55,275.00 |
750.00 |
30,150.00 |
753.00 |
30,270.60 |
600.00 |
24,120.00 |
| 702-03-A |
catch basins (cb-01)
|
2   |
ea |
5,500.00 |
11,000.00 |
3,500.00 |
7,000.00 |
2,950.00 |
5,900.00 |
5,600.00 |
11,200.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
ea |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
4,800.00 |
4,800.00 |
6,100.00 |
6,100.00 |
| 704-01-A |
guard rail (single thrie beam)(950 mm post spacing)
|
17.14 |
ln m |
400.00 |
6,856.00 |
235.00 |
4,027.90 |
187.00 |
3,205.18 |
226.00 |
3,873.64 |
| 704-03 |
blocked out guard rail
|
32.39 |
ln m |
100.00 |
3,239.00 |
90.00 |
2,915.10 |
71.00 |
2,299.69 |
81.00 |
2,623.59 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
45.72 |
ln m |
230.00 |
10,515.60 |
230.00 |
10,515.60 |
200.00 |
9,144.00 |
226.00 |
10,332.72 |
| 704-09 |
guard rail anchor sections (turndown)
|
45.72 |
ln m |
130.00 |
5,943.60 |
145.00 |
6,629.40 |
147.00 |
6,720.84 |
140.00 |
6,400.80 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
ea |
2,650.00 |
2,650.00 |
2,200.00 |
2,200.00 |
2,700.00 |
2,700.00 |
2,160.00 |
2,160.00 |
| 705-01 |
barbed wire fence
|
318   |
ln m |
20.00 |
6,360.00 |
20.00 |
6,360.00 |
63.35 |
20,145.30 |
18.50 |
5,883.00 |
| 705-09 |
rebuilt fence
|
60   |
ln m |
40.00 |
2,400.00 |
85.00 |
5,100.00 |
63.35 |
3,801.00 |
85.00 |
5,100.00 |
| 711-01-C |
riprap (15 kg, 360 mm)
|
933   |
sq m |
75.00 |
69,975.00 |
90.00 |
83,970.00 |
89.50 |
83,503.50 |
70.50 |
65,776.50 |
| 711-01-D |
riprap (25 kg, 460 mm)
|
734   |
sq m |
80.00 |
58,720.00 |
90.00 |
66,060.00 |
97.00 |
71,198.00 |
88.50 |
64,959.00 |
| 711-04 |
geotextile fabric
|
1,667   |
sq m |
5.00 |
8,335.00 |
4.00 |
6,668.00 |
5.50 |
9,168.50 |
3.10 |
5,167.70 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
22,500.00 |
22,500.00 |
35,000.00 |
35,000.00 |
15,000.00 |
15,000.00 |
32,500.00 |
32,500.00 |
| 716-01-A |
mulch (vegetative)
|
2,533.9 |
kg |
1.00 |
2,533.90 |
0.50 |
1,266.95 |
1.27 |
3,218.05 |
0.55 |
1,393.65 |
| 717-01 |
seeding
|
20   |
kg |
70.00 |
1,400.00 |
20.00 |
400.00 |
24.00 |
480.00 |
20.00 |
400.00 |
| 718-01 |
fertilizer
|
512   |
kg |
1.00 |
512.00 |
1.00 |
512.00 |
1.98 |
1,013.76 |
1.00 |
512.00 |
| 726-01 |
bedding material
|
101.4 |
cu m |
130.00 |
13,182.00 |
125.00 |
12,675.00 |
10.00 |
1,014.00 |
275.00 |
27,885.00 |
| 727-01 |
mobilization
|
lump |
lump |
170,000.00 |
170,000.00 |
166,000.00 |
166,000.00 |
195,000.00 |
195,000.00 |
186,750.00 |
186,750.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
100.00 |
400.00 |
55.00 |
220.00 |
70.00 |
280.00 |
51.50 |
206.00 |
| 729-16-C |
object marker assembly (type 3)
|
14   |
ea |
100.00 |
1,400.00 |
85.00 |
1,190.00 |
82.00 |
1,148.00 |
82.50 |
1,155.00 |
| 740-01 |
construction layout
|
lump |
lump |
12,000.00 |
12,000.00 |
33,000.00 |
33,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
| 803-03 |
steel sheet pile wall
|
288.0 |
sq m |
835.00 |
240,480.00 |
460.00 |
132,480.00 |
808.00 |
232,704.00 |
780.00 |
224,640.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
827.4 |
ln m |
165.00 |
136,521.00 |
175.00 |
144,795.00 |
200.00 |
165,480.00 |
239.00 |
197,748.60 |
| 804-12 |
loading permanent piles
|
2   |
ea |
1.00 |
2.00 |
10,000.00 |
20,000.00 |
1,100.00 |
2,200.00 |
3,790.00 |
7,580.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
47.26 |
cu m |
1,500.00 |
70,890.00 |
1,650.00 |
77,979.00 |
3,200.00 |
151,232.00 |
1,275.00 |
60,256.50 |
| 805-10-A |
bridge superstructure & substructure (75deg x-ing,
7.3m rdwy.) |
4   |
span |
28,750.00 |
115,000.00 |
33,000.00 |
132,000.00 |
48,825.00 |
195,300.00 |
49,000.00 |
196,000.00 |
| 805-10-B |
bridge superstructure & substructure (90deg x-ing,
8.5m rdwy. c.i.p) |
3   |
span |
30,000.00 |
90,000.00 |
37,000.00 |
111,000.00 |
52,500.00 |
157,500.00 |
52,900.00 |
158,700.00 |
| 805-10-C |
bridge superstructure & substructure (90deg x-ing,
8.5m rdwy cip, turnout) |
1   |
span |
31,500.00 |
31,500.00 |
42,500.00 |
42,500.00 |
59,000.00 |
59,000.00 |
82,250.00 |
82,250.00 |
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
39.60 |
ln m |
2,405.00 |
95,238.00 |
2,500.00 |
99,000.00 |
1,300.00 |
51,480.00 |
3,360.00 |
133,056.00 |
| 806-01 |
deformed reinforcing steel
|
3,124   |
kg |
2.25 |
7,029.00 |
2.00 |
6,248.00 |
2.00 |
6,248.00 |
22.35 |
69,821.40 |
| S-101 |
concrete approach slabs (75deg x-ing, 7.3m rdwy)
|
2   |
each |
10,000.00 |
20,000.00 |
9,000.00 |
18,000.00 |
13,000.00 |
26,000.00 |
9,000.00 |
18,000.00 |
| S-102 |
concrete approach slabs (90deg x-ing, 8.5m rdwy w/
tapered barrier rails) |
2   |
each |
13,000.00 |
26,000.00 |
9,500.00 |
19,000.00 |
2,000.00 |
4,000.00 |
9,500.00 |
19,000.00 |
| S-103 |
guard rail special anchor section
|
1   |
each |
1,800.00 |
1,800.00 |
525.00 |
525.00 |
1,050.00 |
1,050.00 |
515.00 |
515.00 |
| S-105 |
concrete approach slab (90deg x-ing, roadway width
varies w/ tapered barrier rails) |
1   |
each |
13,000.00 |
13,000.00 |
9,500.00 |
9,500.00 |
22,000.00 |
22,000.00 |
9,500.00 |
9,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,706,345.10 |
|
1,718,363.95 |
|
2,045,522.01 |
|
2,070,904.00 |
|