Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-57-0105
Parish: VERMILION
Routes:
Description: BRIDGES IN VERMILLION PARISH
Type Const: drainage structures ,class ii base course, superpave asphaltic concrete pavement,
concrete slab span bridges, and related work.
Estimated Construction Cost: $1,648,889.85
 
RankLicenseBidderConstruction Bid
1 09090 GUINN BROTHERS, LLC. $1,706,345.10
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,718,363.95
3 25088 RCS CONTRACTORS, INC. $2,045,522.01
4 00060 F. MILLER CONSTRUCTION LLC $2,070,904.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUINN BROTHERS, LLC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
RCS CONTRACTORS, INC.
- 4 -
F. MILLER CONSTRUCTION LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      lump 15,000.00 15,000.00 25,000.00 25,000.00 50,000.00 50,000.00 14,500.00 14,500.00
202-02-A-01 removal of bridges (sta. 3+198.5, 5.8m x 11.7m timber
bridge)
1      ea 12,500.00 12,500.00 15,000.00 15,000.00 10,000.00 10,000.00 21,000.00 21,000.00
202-02-A-02 removal of bridges (sta. 3+160, 6.1m x 7.2m timber
bridge)
1      ea 16,000.00 16,000.00 15,000.00 15,000.00 10,000.00 10,000.00 25,000.00 25,000.00
202-02-A-03 removal of bridges (sta. 3+183.1, 6.2m x 16.6m timber
bridge)
1      ea 15,000.00 15,000.00 20,000.00 20,000.00 10,000.00 10,000.00 36,000.00 36,000.00
202-02-G removal of surfacing & stabilized base 1,024.6    sq m 5.00 5,123.00 10.00 10,246.00 6.00 6,147.60 11.50 11,782.90
203-04 nonplastic embankment 121      cu m 100.00 12,100.00 100.00 12,100.00 55.00 6,655.00 175.00 21,175.00
203-05 excavation and embankment lump      lump 45,000.00 45,000.00 100,000.00 100,000.00 135,000.00 135,000.00 55,000.00 55,000.00
204-02 temporary hay or straw bales 120      ea 10.00 1,200.00 10.00 1,200.00 16.50 1,980.00 15.50 1,860.00
204-03 temporary slope drains 60      ln m 1.00 60.00 150.00 9,000.00 50.00 3,000.00 90.00 5,400.00
204-05-A temporary sediment check dams (hay) 12      ea 100.00 1,200.00 225.00 2,700.00 198.00 2,376.00 185.00 2,220.00
204-06 temporary silt fencing 300      ln m 6.00 1,800.00 3.00 900.00 10.90 3,270.00 3.10 930.00
302-01 class ii base course 289.2    cu m 130.00 37,596.00 125.00 36,150.00 190.39 55,060.79 110.00 31,812.00
401-02 aggregate surface course (adjusted vehicular
measurement)
52      cu m 130.00 6,760.00 95.00 4,940.00 190.39 9,900.28 105.00 5,460.00
403-01 aggregate roadway surfacing (vehicular measurement) 77.8    cu m 130.00 10,114.00 95.00 7,391.00 175.00 13,615.00 165.00 12,837.00
502-01 superpave asphaltic concrete 266.6    Mg 275.00 73,315.00 250.00 66,650.00 250.00 66,650.00 340.00 90,644.00
701-05-G-01 side drain pipe (450 mm) (erosion) 12.0    ln m 175.00 2,100.00 200.00 2,400.00 254.10 3,049.20 170.00 2,040.00
701-05-M side drain pipe (900 mm) 2.0    ln m 405.00 810.00 500.00 1,000.00 316.80 633.60 305.00 610.00
701-05-M-01 side drain pipe (900 mm) (erosion) 145.0    ln m 465.00 67,425.00 350.00 50,750.00 316.80 45,936.00 255.00 36,975.00
701-05-N-01 side drain pipe (1050 mm) (erosion) 14.0    ln m 565.00 7,910.00 400.00 5,600.00 358.88 5,024.32 335.00 4,690.00
701-05-O-01 side drain pipe (1200 mm) (erosion) 30.0    ln m 670.00 20,100.00 450.00 13,500.00 433.00 12,990.00 175.00 5,250.00
701-05-Q side drain pipe (1500 mm) 26.6    ln m 1,375.00 36,575.00 750.00 19,950.00 753.00 20,029.80 720.00 19,152.00
701-05-Q-01 side drain pipe (1500 mm) (erosion) 40.2    ln m 1,375.00 55,275.00 750.00 30,150.00 753.00 30,270.60 600.00 24,120.00
702-03-A catch basins (cb-01) 2      ea 5,500.00 11,000.00 3,500.00 7,000.00 2,950.00 5,900.00 5,600.00 11,200.00
702-03-B catch basins (cb-02) 1      ea 6,000.00 6,000.00 4,000.00 4,000.00 4,800.00 4,800.00 6,100.00 6,100.00
704-01-A guard rail (single thrie beam)(950 mm post spacing) 17.14   ln m 400.00 6,856.00 235.00 4,027.90 187.00 3,205.18 226.00 3,873.64
704-03 blocked out guard rail 32.39   ln m 100.00 3,239.00 90.00 2,915.10 71.00 2,299.69 81.00 2,623.59
704-08-B guard rail transitions (double thrie beam) 45.72   ln m 230.00 10,515.60 230.00 10,515.60 200.00 9,144.00 226.00 10,332.72
704-09 guard rail anchor sections (turndown) 45.72   ln m 130.00 5,943.60 145.00 6,629.40 147.00 6,720.84 140.00 6,400.80
704-11-A guard rail end treatment (flared) 1      ea 2,650.00 2,650.00 2,200.00 2,200.00 2,700.00 2,700.00 2,160.00 2,160.00
705-01 barbed wire fence 318      ln m 20.00 6,360.00 20.00 6,360.00 63.35 20,145.30 18.50 5,883.00
705-09 rebuilt fence 60      ln m 40.00 2,400.00 85.00 5,100.00 63.35 3,801.00 85.00 5,100.00
711-01-C riprap (15 kg, 360 mm) 933      sq m 75.00 69,975.00 90.00 83,970.00 89.50 83,503.50 70.50 65,776.50
711-01-D riprap (25 kg, 460 mm) 734      sq m 80.00 58,720.00 90.00 66,060.00 97.00 71,198.00 88.50 64,959.00
711-04 geotextile fabric 1,667      sq m 5.00 8,335.00 4.00 6,668.00 5.50 9,168.50 3.10 5,167.70
713-01 temporary signs & barricades lump      lump 22,500.00 22,500.00 35,000.00 35,000.00 15,000.00 15,000.00 32,500.00 32,500.00
716-01-A mulch (vegetative) 2,533.9    kg 1.00 2,533.90 0.50 1,266.95 1.27 3,218.05 0.55 1,393.65
717-01 seeding 20      kg 70.00 1,400.00 20.00 400.00 24.00 480.00 20.00 400.00
718-01 fertilizer 512      kg 1.00 512.00 1.00 512.00 1.98 1,013.76 1.00 512.00
726-01 bedding material 101.4    cu m 130.00 13,182.00 125.00 12,675.00 10.00 1,014.00 275.00 27,885.00
727-01 mobilization lump      lump 170,000.00 170,000.00 166,000.00 166,000.00 195,000.00 195,000.00 186,750.00 186,750.00
729-16-B object marker assembly (type 2) 4      ea 100.00 400.00 55.00 220.00 70.00 280.00 51.50 206.00
729-16-C object marker assembly (type 3) 14      ea 100.00 1,400.00 85.00 1,190.00 82.00 1,148.00 82.50 1,155.00
740-01 construction layout lump      lump 12,000.00 12,000.00 33,000.00 33,000.00 30,000.00 30,000.00 25,000.00 25,000.00
803-03 steel sheet pile wall 288.0    sq m 835.00 240,480.00 460.00 132,480.00 808.00 232,704.00 780.00 224,640.00
804-01-B precast concrete piles (350 mm) 827.4    ln m 165.00 136,521.00 175.00 144,795.00 200.00 165,480.00 239.00 197,748.60
804-12 loading permanent piles 2      ea 1.00 2.00 10,000.00 20,000.00 1,100.00 2,200.00 3,790.00 7,580.00
805-01-B class a concrete (box culvert headwalls) 47.26   cu m 1,500.00 70,890.00 1,650.00 77,979.00 3,200.00 151,232.00 1,275.00 60,256.50
805-10-A bridge superstructure & substructure (75deg x-ing,
7.3m rdwy.)
4      span 28,750.00 115,000.00 33,000.00 132,000.00 48,825.00 195,300.00 49,000.00 196,000.00
805-10-B bridge superstructure & substructure (90deg x-ing,
8.5m rdwy. c.i.p)
3      span 30,000.00 90,000.00 37,000.00 111,000.00 52,500.00 157,500.00 52,900.00 158,700.00
805-10-C bridge superstructure & substructure (90deg x-ing,
8.5m rdwy cip, turnout)
1      span 31,500.00 31,500.00 42,500.00 42,500.00 59,000.00 59,000.00 82,250.00 82,250.00
805-12-S reinforced concrete box culverts (2400 mm x 2400 mm) 39.60   ln m 2,405.00 95,238.00 2,500.00 99,000.00 1,300.00 51,480.00 3,360.00 133,056.00
806-01 deformed reinforcing steel 3,124      kg 2.25 7,029.00 2.00 6,248.00 2.00 6,248.00 22.35 69,821.40
S-101 concrete approach slabs (75deg x-ing, 7.3m rdwy) 2      each 10,000.00 20,000.00 9,000.00 18,000.00 13,000.00 26,000.00 9,000.00 18,000.00
S-102 concrete approach slabs (90deg x-ing, 8.5m rdwy w/
tapered barrier rails)
2      each 13,000.00 26,000.00 9,500.00 19,000.00 2,000.00 4,000.00 9,500.00 19,000.00
S-103 guard rail special anchor section 1      each 1,800.00 1,800.00 525.00 525.00 1,050.00 1,050.00 515.00 515.00
S-105 concrete approach slab (90deg x-ing, roadway width
varies w/ tapered barrier rails)
1      each 13,000.00 13,000.00 9,500.00 9,500.00 22,000.00 22,000.00 9,500.00 9,500.00
                       
 CONTRACTOR TOTAL       1,706,345.10   1,718,363.95   2,045,522.01   2,070,904.00