| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - C W & W CONTRACTORS, INC. |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
18,000.00 |
18,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
| 202-02-A-01 |
removal of bridge ((sta. 105+10; 23.8 ft. wide x
171.4 ft. long; timber pile, concrete slab span) |
1   |
EACH |
65,000.00 |
65,000.00 |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
70,000.00 |
70,000.00 |
| 203-05 |
excavation & embankment
|
lump |
LUMP |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
40,000.00 |
40,000.00 |
35,000.00 |
35,000.00 |
| 204-02 |
temporary hay or straw bales
|
6   |
EACH |
45.00 |
270.00 |
25.00 |
150.00 |
10.00 |
60.00 |
10.00 |
60.00 |
| 204-03 |
temporary slope drains
|
320   |
LNFT |
30.00 |
9,600.00 |
15.00 |
4,800.00 |
15.00 |
4,800.00 |
1.00 |
320.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
250.00 |
1,000.00 |
200.00 |
800.00 |
150.00 |
600.00 |
100.00 |
400.00 |
| 204-06 |
temporary silt fencing
|
875   |
LNFT |
2.00 |
1,750.00 |
2.50 |
2,187.50 |
3.00 |
2,625.00 |
3.00 |
2,625.00 |
| 302-01 |
class ii base course
|
193.1 |
CUYD |
150.00 |
28,965.00 |
125.00 |
24,137.50 |
100.00 |
19,310.00 |
100.00 |
19,310.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
17   |
CUYD |
100.00 |
1,700.00 |
100.00 |
1,700.00 |
100.00 |
1,700.00 |
100.00 |
1,700.00 |
| 502-01 |
superpave asphaltic concrete
|
169.2 |
TON |
210.00 |
35,532.00 |
185.00 |
31,302.00 |
250.00 |
42,300.00 |
375.00 |
63,450.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
65.00 |
6,500.00 |
60.00 |
6,000.00 |
75.00 |
7,500.00 |
75.00 |
7,500.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
45.00 |
4,500.00 |
55.00 |
5,500.00 |
55.00 |
5,500.00 |
| 705-02 |
combination mesh & barbed wire fence
|
30   |
LNFT |
35.00 |
1,050.00 |
6.00 |
180.00 |
50.00 |
1,500.00 |
50.00 |
1,500.00 |
| 711-01-D |
riprap (55 lb, 18"thick)
|
707   |
SQYD |
70.00 |
49,490.00 |
60.00 |
42,420.00 |
85.00 |
60,095.00 |
70.00 |
49,490.00 |
| 711-04 |
geotextile fabric
|
707   |
SQYD |
3.00 |
2,121.00 |
5.00 |
3,535.00 |
3.00 |
2,121.00 |
5.00 |
3,535.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.28 |
TON |
3,000.00 |
840.00 |
800.00 |
224.00 |
5,000.00 |
1,400.00 |
3,000.00 |
840.00 |
| 717-01 |
seeding
|
6   |
LB |
22.00 |
132.00 |
15.00 |
90.00 |
100.00 |
600.00 |
50.00 |
300.00 |
| 718-01 |
fertilizer
|
140   |
LB |
2.50 |
350.00 |
0.50 |
70.00 |
5.00 |
700.00 |
1.00 |
140.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
165,000.00 |
165,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
90.00 |
720.00 |
80.00 |
640.00 |
110.00 |
880.00 |
100.00 |
800.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
40,000.00 |
40,000.00 |
| 804-01-F |
precast concrete piles (24")
|
1,080   |
LNFT |
125.00 |
135,000.00 |
200.00 |
216,000.00 |
180.00 |
194,400.00 |
185.00 |
199,800.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
7,500.00 |
7,500.00 |
30,000.00 |
30,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 805-01-F |
class a concrete (bents)
|
60.72 |
CUYD |
1,200.00 |
72,864.00 |
1,000.00 |
60,720.00 |
1,000.00 |
60,720.00 |
1,200.00 |
72,864.00 |
| 805-03 |
class aa concrete
|
150.00 |
CUYD |
1,500.00 |
225,000.00 |
750.00 |
112,500.00 |
900.00 |
135,000.00 |
1,000.00 |
150,000.00 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,185.0 |
LNFT |
80.00 |
94,800.00 |
140.00 |
165,900.00 |
100.00 |
118,500.00 |
128.00 |
151,680.00 |
| 806-01 |
deformed reinforcing steel
|
45,093   |
LB |
1.00 |
45,093.00 |
1.25 |
56,366.25 |
3.00 |
135,279.00 |
1.15 |
51,856.95 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
17,000.00 |
17,000.00 |
22,500.00 |
22,500.00 |
25,000.00 |
25,000.00 |
17,000.00 |
17,000.00 |
| 810-01 |
concrete railing (barrier)
|
400.00 |
LNFT |
65.00 |
26,000.00 |
60.00 |
24,000.00 |
90.00 |
36,000.00 |
72.00 |
28,800.00 |
| S-101 |
concrete approach slabs (28'clear roadway; 90 deg.
crossing)(w/out asphalt) |
2   |
EACH |
8,500.00 |
17,000.00 |
14,000.00 |
28,000.00 |
15,000.00 |
30,000.00 |
11,500.00 |
23,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,055,777.00 |
|
1,086,722.25 |
|
1,173,591.00 |
|
1,192,471.95 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - CECIL D. GASSIOTT LLC |
- 6 - KEY CONSTRUCTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge ((sta. 105+10; 23.8 ft. wide x
171.4 ft. long; timber pile, concrete slab span) |
1   |
EACH |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
34,330.00 |
34,330.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
6   |
EACH |
200.00 |
1,200.00 |
10.00 |
60.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
320   |
LNFT |
15.00 |
4,800.00 |
10.00 |
3,200.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
110.00 |
440.00 |
125.00 |
500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
875   |
LNFT |
5.00 |
4,375.00 |
5.00 |
4,375.00 |
|
|
|
|
| 302-01 |
class ii base course
|
193.1 |
CUYD |
110.00 |
21,241.00 |
125.00 |
24,137.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
17   |
CUYD |
110.00 |
1,870.00 |
145.00 |
2,465.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
169.2 |
TON |
215.00 |
36,378.00 |
300.00 |
50,760.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
60.00 |
6,000.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
85.00 |
8,500.00 |
70.00 |
7,000.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
30   |
LNFT |
10.00 |
300.00 |
15.00 |
450.00 |
|
|
|
|
| 711-01-D |
riprap (55 lb, 18"thick)
|
707   |
SQYD |
83.00 |
58,681.00 |
100.00 |
70,700.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
707   |
SQYD |
4.00 |
2,828.00 |
9.50 |
6,716.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.28 |
TON |
5,000.00 |
1,400.00 |
1,500.00 |
420.00 |
|
|
|
|
| 717-01 |
seeding
|
6   |
LB |
10.00 |
60.00 |
100.00 |
600.00 |
|
|
|
|
| 718-01 |
fertilizer
|
140   |
LB |
1.00 |
140.00 |
2.50 |
350.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
145,000.00 |
145,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
100.00 |
800.00 |
75.00 |
600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
1,080   |
LNFT |
300.00 |
324,000.00 |
235.00 |
253,800.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
60.72 |
CUYD |
550.00 |
33,396.00 |
1,400.00 |
85,008.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
150.00 |
CUYD |
900.00 |
135,000.00 |
1,100.00 |
165,000.00 |
|
|
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,185.0 |
LNFT |
200.00 |
237,000.00 |
115.00 |
136,275.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
45,093   |
LB |
3.00 |
135,279.00 |
1.25 |
56,366.25 |
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
5,000.00 |
5,000.00 |
23,500.00 |
23,500.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
400.00 |
LNFT |
77.00 |
30,800.00 |
65.00 |
26,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs (28'clear roadway; 90 deg.
crossing)(w/out asphalt) |
2   |
EACH |
12,000.00 |
24,000.00 |
10,000.00 |
20,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,392,818.00 |
|
1,484,283.25 |
|
|
|
|
|