Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 713-26-0105
Parish: JEFFERSON
Routes:
Description: 26TH STREET BRIDGE OVER CANAL NO. 17 (BUTLER CANAL)
Type Const: grading, drainage structures, steel sheet piling, concrete slab span bridge, and
related work.
Estimated Construction Cost: $1,335,770.00
 
RankLicenseBidderConstruction Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $1,116,881.00
2 36827 SHAVERS-WHITTLE CONSTRUCTION INC $1,427,288.00
3 36961 CYCLE CONSTRUCTION CO. L.L.C. $1,898,949.00
4 00935 FLEMING CONSTRUCTION CO., INC. $2,047,710.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
SHAVERS-WHITTLE CONSTRUCTION INC
- 3 -
CYCLE CONSTRUCTION CO. L.L.C.
- 4 -
FLEMING CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,275.00 5,275.00 3,500.00 3,500.00 1,200.00 1,200.00 35,000.00 35,000.00
202-02-A-01 removal of bridge(sta.100+18.19;27.1'w x 57' l
concrete structure on wooden piling w/sidewalk)
1      EACH 50,000.00 50,000.00 45,000.00 45,000.00 44,000.00 44,000.00 80,000.00 80,000.00
202-02-C removal of portland cement concrete pavement 224      SQYD 77.00 17,248.00 95.00 21,280.00 15.00 3,360.00 80.00 17,920.00
203-05 excavation and embankment lump      LUMP 10,000.00 10,000.00 38,000.00 38,000.00 25,000.00 25,000.00 40,000.00 40,000.00
701-03-J storm drain pipe ( 27" cmp)(outfall) 22      LNFT 640.00 14,080.00 185.00 4,070.00 200.00 4,400.00 350.00 7,700.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 20,000.00 20,000.00 10,000.00 10,000.00 25,000.00 25,000.00
716-01-A mulch (vegetative) 0.4    TON 600.00 240.00 650.00 260.00 500.00 200.00 1,800.00 720.00
717-01 seeding 6      LB 6.00 36.00 12.00 72.00 60.00 360.00 60.00 360.00
718-01 fertilizer 200      LB 0.25 50.00 1.25 250.00 1.00 200.00 3.00 600.00
727-01 mobilization lump      LUMP 80,000.00 80,000.00 125,000.00 125,000.00 411,000.00 411,000.00 350,000.00 350,000.00
729-16-C object marker assembly (type 3) 8      EACH 600.00 4,800.00 95.00 760.00 86.00 688.00 145.00 1,160.00
740-01 construction layout lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 10,000.00 10,000.00 8,000.00 8,000.00
803-03 steel sheet pile wall 6,966      SQFT 65.00 452,790.00 53.00 369,198.00 60.00 417,960.00 70.00 487,620.00
804-01-D precast concrete piles (18") 2,218      LNFT 75.00 166,350.00 146.00 323,828.00 92.00 204,056.00 185.00 410,330.00
804-12 loading permanent piles 1      EACH 50,000.00 50,000.00 2,500.00 2,500.00 1,800.00 1,800.00 110,000.00 110,000.00
805-10-A bridge superstructure & substructure(minimum 28'clear
roadway @ 90 degree with special end
bents,cast-in-place)
3      SPAN 50,000.00 150,000.00 107,500.00 322,500.00 190,000.00 570,000.00 85,000.00 255,000.00
S-001 saw cutting concrete pavement (full depth) 115      lf 8.80 1,012.00 18.00 2,070.00 15.00 1,725.00 20.00 2,300.00
S-101 vibration monitoring lump      LUMP 5,000.00 5,000.00 14,000.00 14,000.00 18,000.00 18,000.00 8,000.00 8,000.00
S-102 concrete approach slab(28' clear roadway,with tapered
concrete barrier railing @ 90 degree
crossing(west side)
1      EACH 50,000.00 50,000.00 60,000.00 60,000.00 90,000.00 90,000.00 104,000.00 104,000.00
S-103 concrete approach slab(28' clear roadway,with tapered
concrete barrier railing @ 90 degree
crossing(east side)
1      EACH 45,000.00 45,000.00 50,000.00 50,000.00 85,000.00 85,000.00 104,000.00 104,000.00
    crossing(east side)                    
 CONTRACTOR TOTAL       1,116,881.00   1,427,288.00   1,898,949.00   2,047,710.00