Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-22-0107
Parish: GRANT
Routes:
Description: MOCCASIN BRANCH & FRAZIER CEMETERY ROAD BRIDGES
Type Const: grading, drainage structures, class ii base course, superpav e asphaltic conc. pvmt,
portland cement concrete pavement, prestressed concrete girder spans bridge, and related work.
Estimated Construction Cost: $740,945.25
 
RankLicenseBidderConstruction Bid
1 18546 C W & W CONTRACTORS, INC. $582,550.50
2 09090 GUINN BROTHERS, LLC. $677,348.95
3 12312 GILCHRIST CONSTRUCTION CO. LLC $714,095.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
C W & W CONTRACTORS, INC.
- 2 -
GUINN BROTHERS, LLC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 7,500.00 7,500.00 30,000.00 30,000.00 25,000.00 25,000.00    
202-02-A-01 removal of bridge (sta. 333+07; 20.06' wide x 39.95'
long timber bridge wit h guard rail)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00 7,000.00 7,000.00    
202-02-A-02 removal of bridge (sta. 333+07; 20.45' wide x 39.15'
long timber bridge wit h guard rail)
1      EACH 5,000.00 5,000.00 10,000.00 10,000.00 7,000.00 7,000.00    
203-05 excavation & embankment lump      LUMP 15,000.00 15,000.00 12,500.00 12,500.00 45,000.00 45,000.00    
204-02 temporary hay or straw bales 30      EACH 15.00 450.00 10.00 300.00 15.00 450.00    
204-03 temporary slope drains 390      LNFT 20.00 7,800.00 10.00 3,900.00 40.00 15,600.00    
204-05-A temporary sediment check dams (hay) 18      EACH 150.00 2,700.00 175.00 3,150.00 225.00 4,050.00    
204-06 temporary silt fencing 2,708      LNFT 3.00 8,124.00 3.00 8,124.00 3.00 8,124.00    
302-01 class ii base course 305.8    CUYD 100.00 30,580.00 100.00 30,580.00 80.00 24,464.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
13      CUYD 100.00 1,300.00 100.00 1,300.00 80.00 1,040.00    
502-01 superpave asphaltic concrete 237.7    TON 250.00 59,425.00 275.00 65,367.50 200.00 47,540.00    
701-05-I side drain pipe (24") 50      LNFT 60.00 3,000.00 80.00 4,000.00 105.00 5,250.00    
701-05-I-01 side drain pipe (24")(erosion) 124      LNFT 60.00 7,440.00 80.00 9,920.00 90.00 11,160.00    
702-03-A catch basins (cb-01) 1      EACH 4,000.00 4,000.00 5,500.00 5,500.00 3,700.00 3,700.00    
705-01 barbed wire fence 50      LNFT 20.00 1,000.00 10.00 500.00 12.00 600.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 16,500.00 16,500.00 20,000.00 20,000.00    
716-01-A mulch (vegetative) 1.4    TON 2,500.00 3,500.00 1,000.00 1,400.00 550.00 770.00    
717-01 seeding 32      LB 75.00 2,400.00 25.00 800.00 11.00 352.00    
718-01 fertilizer 707      LB 2.00 1,414.00 0.50 353.50 0.55 388.85    
726-01 bedding material 1.7    CUYD 150.00 255.00 500.00 850.00 68.00 115.60    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 65,000.00 65,000.00 70,000.00 70,000.00    
729-16-C object marker assembly (type 3) 8      EACH 110.00 880.00 100.00 800.00 75.00 600.00    
740-01 construction layout lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 20,000.00 20,000.00    
804-01-F precast concrete piles (24") 600      LNFT 175.00 105,000.00 170.00 102,000.00 130.00 78,000.00    
804-12 loading permanent piles 2      EACH 1.00 2.00 1.00 2.00 10,000.00 20,000.00    
805-01-F class a concrete (bents) 50.33   CUYD 850.00 42,780.50 1,000.00 50,330.00 1,000.00 50,330.00    
805-03 class aa concrete 56.88   CUYD 800.00 45,504.00 1,000.00 56,880.00 1,900.00 108,072.00    
805-08-H precast-prestressed concrete girders (type quad beam) 434.7    LNFT 100.00 43,470.00 160.00 69,552.00 116.00 50,425.20    
806-01 deformed reinforcing steel 21,513      LB 2.00 43,026.00 1.15 24,739.95 1.10 23,664.30    
807-08 structural metalwork lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 13,000.00 13,000.00    
810-01 concrete railing (type) 160.00   LNFT 100.00 16,000.00 100.00 16,000.00 65.00 10,400.00    
S-101 concrete approach slab (24' clr. rdwy; 90 deg. xing
with tapered barrier ra ils)
2      EACH 7,500.00 15,000.00 12,500.00 25,000.00 10,500.00 21,000.00    
S-102 concrete approach slab (28' clr. rdwy; 90 deg. xing
with tapered barrier ra ils)
2      EACH 7,500.00 15,000.00 13,500.00 27,000.00 10,500.00 21,000.00    
                       
 CONTRACTOR TOTAL       582,550.50   677,348.95   714,095.95    