| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C W & W CONTRACTORS, INC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
7,500.00 |
7,500.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta. 333+07; 20.06' wide x 39.95'
long timber bridge wit h guard rail) |
1   |
EACH |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
|
|
| 202-02-A-02 |
removal of bridge (sta. 333+07; 20.45' wide x 39.15'
long timber bridge wit h guard rail) |
1   |
EACH |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
12,500.00 |
12,500.00 |
45,000.00 |
45,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
15.00 |
450.00 |
10.00 |
300.00 |
15.00 |
450.00 |
|
|
| 204-03 |
temporary slope drains
|
390   |
LNFT |
20.00 |
7,800.00 |
10.00 |
3,900.00 |
40.00 |
15,600.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
18   |
EACH |
150.00 |
2,700.00 |
175.00 |
3,150.00 |
225.00 |
4,050.00 |
|
|
| 204-06 |
temporary silt fencing
|
2,708   |
LNFT |
3.00 |
8,124.00 |
3.00 |
8,124.00 |
3.00 |
8,124.00 |
|
|
| 302-01 |
class ii base course
|
305.8 |
CUYD |
100.00 |
30,580.00 |
100.00 |
30,580.00 |
80.00 |
24,464.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
13   |
CUYD |
100.00 |
1,300.00 |
100.00 |
1,300.00 |
80.00 |
1,040.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
237.7 |
TON |
250.00 |
59,425.00 |
275.00 |
65,367.50 |
200.00 |
47,540.00 |
|
|
| 701-05-I |
side drain pipe (24")
|
50   |
LNFT |
60.00 |
3,000.00 |
80.00 |
4,000.00 |
105.00 |
5,250.00 |
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
124   |
LNFT |
60.00 |
7,440.00 |
80.00 |
9,920.00 |
90.00 |
11,160.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,000.00 |
4,000.00 |
5,500.00 |
5,500.00 |
3,700.00 |
3,700.00 |
|
|
| 705-01 |
barbed wire fence
|
50   |
LNFT |
20.00 |
1,000.00 |
10.00 |
500.00 |
12.00 |
600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
16,500.00 |
16,500.00 |
20,000.00 |
20,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
1.4 |
TON |
2,500.00 |
3,500.00 |
1,000.00 |
1,400.00 |
550.00 |
770.00 |
|
|
| 717-01 |
seeding
|
32   |
LB |
75.00 |
2,400.00 |
25.00 |
800.00 |
11.00 |
352.00 |
|
|
| 718-01 |
fertilizer
|
707   |
LB |
2.00 |
1,414.00 |
0.50 |
353.50 |
0.55 |
388.85 |
|
|
| 726-01 |
bedding material
|
1.7 |
CUYD |
150.00 |
255.00 |
500.00 |
850.00 |
68.00 |
115.60 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
70,000.00 |
70,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
110.00 |
880.00 |
100.00 |
800.00 |
75.00 |
600.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
600   |
LNFT |
175.00 |
105,000.00 |
170.00 |
102,000.00 |
130.00 |
78,000.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
1.00 |
2.00 |
1.00 |
2.00 |
10,000.00 |
20,000.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
50.33 |
CUYD |
850.00 |
42,780.50 |
1,000.00 |
50,330.00 |
1,000.00 |
50,330.00 |
|
|
| 805-03 |
class aa concrete
|
56.88 |
CUYD |
800.00 |
45,504.00 |
1,000.00 |
56,880.00 |
1,900.00 |
108,072.00 |
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
434.7 |
LNFT |
100.00 |
43,470.00 |
160.00 |
69,552.00 |
116.00 |
50,425.20 |
|
|
| 806-01 |
deformed reinforcing steel
|
21,513   |
LB |
2.00 |
43,026.00 |
1.15 |
24,739.95 |
1.10 |
23,664.30 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
13,000.00 |
13,000.00 |
|
|
| 810-01 |
concrete railing (type)
|
160.00 |
LNFT |
100.00 |
16,000.00 |
100.00 |
16,000.00 |
65.00 |
10,400.00 |
|
|
| S-101 |
concrete approach slab (24' clr. rdwy; 90 deg. xing
with tapered barrier ra ils) |
2   |
EACH |
7,500.00 |
15,000.00 |
12,500.00 |
25,000.00 |
10,500.00 |
21,000.00 |
|
|
| S-102 |
concrete approach slab (28' clr. rdwy; 90 deg. xing
with tapered barrier ra ils) |
2   |
EACH |
7,500.00 |
15,000.00 |
13,500.00 |
27,000.00 |
10,500.00 |
21,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
582,550.50 |
|
677,348.95 |
|
714,095.95 |
|
|
|