Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-19-0107
Parish: E FELICIANA
Routes:
Description: THOMPSON CREEK ROAD BRIDGE OVER THOMPSON CREEK
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, precast prestressed
concrete girder spans bridge and related work.
Estimated Construction Cost: $2,400,000.00
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,933,107.75
2 00481 COASTAL BRIDGE CO., L.L.C. $1,988,483.50
3 09090 GUINN BROTHERS, LLC. $2,430,360.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
GUINN BROTHERS, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 42,500.00 42,500.00 120,000.00 120,000.00 85,000.00 85,000.00    
202-02-A-01 removal of bridge(sta. 10+00; 18.1' wide x 101.5' long
steel truss and timber bridge approaches)
1      EACH 60,000.00 60,000.00 82,000.00 82,000.00 100,000.00 100,000.00    
203-05 excavation & embankment lump      LUMP 160,000.00 160,000.00 150,000.00 150,000.00 225,000.00 225,000.00    
204-02 temporary hay or straw bales 70      EACH 50.00 3,500.00 15.00 1,050.00 10.00 700.00    
204-03 temporary slope drains 200      LNFT 11.50 2,300.00 50.00 10,000.00 10.00 2,000.00    
204-05-A temporary sediment check dams (hay) 8      EACH 300.00 2,400.00 300.00 2,400.00 100.00 800.00    
204-06 temporary silt fencing 1,600      LNFT 3.00 4,800.00 4.00 6,400.00 3.00 4,800.00    
302-01 class ii base course 375.3    CUYD 110.00 41,283.00 100.00 37,530.00 100.00 37,530.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
38      CUYD 85.00 3,230.00 100.00 3,800.00 100.00 3,800.00    
502-01 superpave asphaltic concrete 291.6    TON 200.00 58,320.00 170.00 49,572.00 285.00 83,106.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 62.00 6,200.00 100.00 10,000.00 75.00 7,500.00    
704-09 guard rail anchor sections (turndown) 100.0    LNFT 45.00 4,500.00 50.00 5,000.00 70.00 7,000.00    
705-01 barbed wire fence 878      LNFT 7.50 6,585.00 15.00 13,170.00 8.00 7,024.00    
711-01-F riprap (250 lb,30" thick ) 1,759      SQYD 92.00 161,828.00 100.00 175,900.00 135.00 237,465.00    
711-04 geotextile fabric 1,759      SQYD 1.20 2,110.80 3.00 5,277.00 5.00 8,795.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 25,000.00 25,000.00 18,000.00 18,000.00    
716-01-A mulch (vegetative) 1.7    TON 1,350.00 2,295.00 1,000.00 1,700.00 2,500.00 4,250.00    
717-01 seeding 25      LB 22.50 562.50 25.00 625.00 25.00 625.00    
718-01 fertilizer 833      LB 1.15 957.95 2.00 1,666.00 1.00 833.00    
727-01 mobilization lump      LUMP 399,000.00 399,000.00 190,000.00 190,000.00 305,000.00 305,000.00    
729-16-C object marker assembly (type 3) 8      EACH 95.00 760.00 100.00 800.00 100.00 800.00    
740-01 construction layout lump      LUMP 40,000.00 40,000.00 50,000.00 50,000.00 100,000.00 100,000.00    
804-01-C precast concrete piles (16") 900      LNFT 65.00 58,500.00 90.00 81,000.00 90.00 81,000.00    
804-01-F precast concrete piles (24") 1,628      LNFT 142.00 231,176.00 135.00 219,780.00 195.00 317,460.00    
804-12 loading permanent piles 1      EACH 25,000.00 25,000.00 1,000.00 1,000.00 1.00 1.00    
805-01-F class a concrete (bents) 135.36   CUYD 770.00 104,227.20 1,200.00 162,432.00 1,200.00 162,432.00    
805-03 class aa concrete 239.90   CUYD 800.00 191,920.00 1,050.00 251,895.00 1,000.00 239,900.00    
805-08-B precast-prestressed concrete girders (type ii) 1,183.8    LNFT 100.00 118,380.00 105.00 124,299.00 153.00 181,121.40    
806-01 deformed reinforcing steel 92,910      LB 1.00 92,910.00 1.10 102,201.00 1.20 111,492.00    
807-08 structural metalwork lump      LUMP 20,000.00 20,000.00 20,000.00 20,000.00 15,000.00 15,000.00    
810-01 concrete railing (barrier) 660.00   LNFT 55.00 36,300.00 85.00 56,100.00 80.00 52,800.00    
813-01 concrete approach slabs 123.94   SQYD 295.00 36,562.30 225.00 27,886.50 235.00 29,125.90    
                       
 CONTRACTOR TOTAL       1,933,107.75   1,988,483.50   2,430,360.30    