| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
42,500.00 |
42,500.00 |
120,000.00 |
120,000.00 |
85,000.00 |
85,000.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 10+00; 18.1' wide x 101.5' long
steel truss and timber bridge approaches) |
1   |
EACH |
60,000.00 |
60,000.00 |
82,000.00 |
82,000.00 |
100,000.00 |
100,000.00 |
|
|
| 203-05 |
excavation & embankment
|
lump |
LUMP |
160,000.00 |
160,000.00 |
150,000.00 |
150,000.00 |
225,000.00 |
225,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
70   |
EACH |
50.00 |
3,500.00 |
15.00 |
1,050.00 |
10.00 |
700.00 |
|
|
| 204-03 |
temporary slope drains
|
200   |
LNFT |
11.50 |
2,300.00 |
50.00 |
10,000.00 |
10.00 |
2,000.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
300.00 |
2,400.00 |
300.00 |
2,400.00 |
100.00 |
800.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,600   |
LNFT |
3.00 |
4,800.00 |
4.00 |
6,400.00 |
3.00 |
4,800.00 |
|
|
| 302-01 |
class ii base course
|
375.3 |
CUYD |
110.00 |
41,283.00 |
100.00 |
37,530.00 |
100.00 |
37,530.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
38   |
CUYD |
85.00 |
3,230.00 |
100.00 |
3,800.00 |
100.00 |
3,800.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
291.6 |
TON |
200.00 |
58,320.00 |
170.00 |
49,572.00 |
285.00 |
83,106.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
62.00 |
6,200.00 |
100.00 |
10,000.00 |
75.00 |
7,500.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
50.00 |
5,000.00 |
70.00 |
7,000.00 |
|
|
| 705-01 |
barbed wire fence
|
878   |
LNFT |
7.50 |
6,585.00 |
15.00 |
13,170.00 |
8.00 |
7,024.00 |
|
|
| 711-01-F |
riprap (250 lb,30" thick )
|
1,759   |
SQYD |
92.00 |
161,828.00 |
100.00 |
175,900.00 |
135.00 |
237,465.00 |
|
|
| 711-04 |
geotextile fabric
|
1,759   |
SQYD |
1.20 |
2,110.80 |
3.00 |
5,277.00 |
5.00 |
8,795.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
1.7 |
TON |
1,350.00 |
2,295.00 |
1,000.00 |
1,700.00 |
2,500.00 |
4,250.00 |
|
|
| 717-01 |
seeding
|
25   |
LB |
22.50 |
562.50 |
25.00 |
625.00 |
25.00 |
625.00 |
|
|
| 718-01 |
fertilizer
|
833   |
LB |
1.15 |
957.95 |
2.00 |
1,666.00 |
1.00 |
833.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
399,000.00 |
399,000.00 |
190,000.00 |
190,000.00 |
305,000.00 |
305,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
95.00 |
760.00 |
100.00 |
800.00 |
100.00 |
800.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
|
|
| 804-01-C |
precast concrete piles (16")
|
900   |
LNFT |
65.00 |
58,500.00 |
90.00 |
81,000.00 |
90.00 |
81,000.00 |
|
|
| 804-01-F |
precast concrete piles (24")
|
1,628   |
LNFT |
142.00 |
231,176.00 |
135.00 |
219,780.00 |
195.00 |
317,460.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
1,000.00 |
1,000.00 |
1.00 |
1.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
135.36 |
CUYD |
770.00 |
104,227.20 |
1,200.00 |
162,432.00 |
1,200.00 |
162,432.00 |
|
|
| 805-03 |
class aa concrete
|
239.90 |
CUYD |
800.00 |
191,920.00 |
1,050.00 |
251,895.00 |
1,000.00 |
239,900.00 |
|
|
| 805-08-B |
precast-prestressed concrete girders (type ii)
|
1,183.8 |
LNFT |
100.00 |
118,380.00 |
105.00 |
124,299.00 |
153.00 |
181,121.40 |
|
|
| 806-01 |
deformed reinforcing steel
|
92,910   |
LB |
1.00 |
92,910.00 |
1.10 |
102,201.00 |
1.20 |
111,492.00 |
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
660.00 |
LNFT |
55.00 |
36,300.00 |
85.00 |
56,100.00 |
80.00 |
52,800.00 |
|
|
| 813-01 |
concrete approach slabs
|
123.94 |
SQYD |
295.00 |
36,562.30 |
225.00 |
27,886.50 |
235.00 |
29,125.90 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,933,107.75 |
|
1,988,483.50 |
|
2,430,360.30 |
|
|
|