| Lead Project: 713-17-0041 |
| Parish: E BATON ROUGE |
| Routes: |
| Description: OLD BAKER ROAD BRIDGE OVER DRAINAGE BAYOU |
Type Const:
grading, drainage structures, class ii base course, superpav e asphaltic concrete,
and related work. |
| Estimated Construction Cost: $270,707.00 |
|
| |
| Rank | License | Bidder | Construction Bid |
| 1 | 25088 |
RCS CONTRACTORS, INC. | $199,404.28 |
| 2 | 27634 |
PHYLWAY CONSTRUCTION LLC | $216,004.00 |
| 3 | 12198 |
BYRON E. TALBOT CONTRACTOR, INC. | $234,554.24 |
| 4 | 02109 |
CHAMBERS CONSTRUCTION CO., INC. | $249,687.00 |
| 5 | 06276 |
BARRIERE CONSTRUCTION CO., LLC. | $277,541.50 |
| 6 | 09090 |
GUINN BROTHERS, LLC. | $280,508.00 |
| 7 | 32044 |
QUALITY DESIGN & CONSTRUCTION, LLC. | $295,609.60 |
| 8 | 02179 |
BOH BROS. CONSTRUCTION CO., LLC. | $338,258.55 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RCS CONTRACTORS, INC. |
- 2 - PHYLWAY CONSTRUCTION LLC |
- 3 - BYRON E. TALBOT CONTRACTOR, INC. |
- 4 - CHAMBERS CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
5,500.00 |
5,500.00 |
4,230.00 |
4,230.00 |
| 202-02-A-01 |
removal of bridge(25' wide x 39.4' long)
|
1   |
EACH |
17,850.00 |
17,850.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
7,600.00 |
7,600.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
162.6 |
SQYD |
5.50 |
894.30 |
20.00 |
3,252.00 |
11.15 |
1,812.99 |
25.10 |
4,081.26 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
11,000.00 |
11,000.00 |
28,000.00 |
28,000.00 |
10,000.00 |
10,000.00 |
20,560.00 |
20,560.00 |
| 204-02 |
temporary hay or straw bales
|
3   |
EACH |
22.00 |
66.00 |
12.00 |
36.00 |
25.00 |
75.00 |
140.00 |
420.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
220.00 |
880.00 |
120.00 |
480.00 |
150.00 |
600.00 |
346.00 |
1,384.00 |
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
3.30 |
660.00 |
4.00 |
800.00 |
5.00 |
1,000.00 |
4.00 |
800.00 |
| 302-01 |
class ii base course
|
61.5 |
CUYD |
198.00 |
12,177.00 |
150.00 |
9,225.00 |
90.00 |
5,535.00 |
183.40 |
11,279.10 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
16   |
CUYD |
198.00 |
3,168.00 |
125.00 |
2,000.00 |
60.00 |
960.00 |
131.00 |
2,096.00 |
| 502-01 |
superpave asphaltic concrete
|
48.1 |
TON |
250.00 |
12,025.00 |
200.00 |
9,620.00 |
500.00 |
24,050.00 |
334.00 |
16,065.40 |
| 701-05-I |
side drain pipe (24")
|
112   |
LNFT |
35.06 |
3,926.72 |
54.00 |
6,048.00 |
47.25 |
5,292.00 |
90.00 |
10,080.00 |
| 701-05-K |
side drain pipe (30")
|
40   |
LNFT |
40.02 |
1,600.80 |
80.00 |
3,200.00 |
56.00 |
2,240.00 |
117.00 |
4,680.00 |
| 705-01 |
barbed wire fence
|
80   |
LNFT |
17.49 |
1,399.20 |
20.00 |
1,600.00 |
17.50 |
1,400.00 |
13.00 |
1,040.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
17,000.00 |
17,000.00 |
9,500.00 |
9,500.00 |
| 716-01-A |
mulch (vegetative)
|
0.12 |
TON |
5,500.00 |
660.00 |
4,000.00 |
480.00 |
5,500.00 |
660.00 |
4,580.00 |
549.60 |
| 717-01 |
seeding
|
3   |
LB |
110.00 |
330.00 |
100.00 |
300.00 |
110.00 |
330.00 |
52.00 |
156.00 |
| 718-01 |
fertilizer
|
60   |
LB |
5.50 |
330.00 |
4.00 |
240.00 |
5.50 |
330.00 |
7.10 |
426.00 |
| 726-01 |
bedding material
|
55.5 |
CUYD |
65.00 |
3,607.50 |
150.00 |
8,325.00 |
100.00 |
5,550.00 |
71.00 |
3,940.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
9,500.00 |
9,500.00 |
10,000.00 |
10,000.00 |
23,000.00 |
23,000.00 |
14,970.00 |
14,970.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
75.00 |
300.00 |
100.00 |
400.00 |
177.00 |
708.00 |
| 731-02 |
reflectorized raised pavement markers
|
4   |
EACH |
56.00 |
224.00 |
55.00 |
220.00 |
5.75 |
23.00 |
32.50 |
130.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.077 |
MILE |
31,900.00 |
2,456.30 |
30,000.00 |
2,310.00 |
2,650.00 |
204.05 |
42,200.00 |
3,249.40 |
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
5,600.00 |
5,600.00 |
4,700.00 |
4,700.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
19.10 |
CUYD |
1,570.00 |
29,987.00 |
1,400.00 |
26,740.00 |
1,240.00 |
23,684.00 |
1,475.00 |
28,172.50 |
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
156.0 |
LNFT |
435.38 |
67,919.28 |
440.00 |
68,640.00 |
496.50 |
77,454.00 |
613.75 |
95,745.00 |
| 806-01 |
deformed reinforcing steel
|
1,594   |
LB |
1.47 |
2,343.18 |
2.00 |
3,188.00 |
4.30 |
6,854.20 |
1.96 |
3,124.24 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
199,404.28 |
|
216,004.00 |
|
234,554.24 |
|
249,687.00 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BARRIERE CONSTRUCTION CO., LLC. |
- 6 - GUINN BROTHERS, LLC. |
- 7 - QUALITY DESIGN & CONSTRUCTION, LLC. |
- 8 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,250.00 |
10,250.00 |
10,000.00 |
10,000.00 |
9,400.00 |
9,400.00 |
6,000.00 |
6,000.00 |
| 202-02-A-01 |
removal of bridge(25' wide x 39.4' long)
|
1   |
EACH |
19,000.00 |
19,000.00 |
23,000.00 |
23,000.00 |
8,900.00 |
8,900.00 |
4,930.00 |
4,930.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
162.6 |
SQYD |
19.00 |
3,089.40 |
10.00 |
1,626.00 |
18.00 |
2,926.80 |
20.00 |
3,252.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
27,850.00 |
27,850.00 |
15,000.00 |
15,000.00 |
47,600.00 |
47,600.00 |
29,500.00 |
29,500.00 |
| 204-02 |
temporary hay or straw bales
|
3   |
EACH |
23.00 |
69.00 |
10.00 |
30.00 |
14.00 |
42.00 |
30.00 |
90.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
231.00 |
924.00 |
100.00 |
400.00 |
220.00 |
880.00 |
280.00 |
1,120.00 |
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
3.50 |
700.00 |
3.00 |
600.00 |
2.00 |
400.00 |
3.40 |
680.00 |
| 302-01 |
class ii base course
|
61.5 |
CUYD |
173.00 |
10,639.50 |
100.00 |
6,150.00 |
133.00 |
8,179.50 |
141.00 |
8,671.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
16   |
CUYD |
100.00 |
1,600.00 |
100.00 |
1,600.00 |
108.00 |
1,728.00 |
141.00 |
2,256.00 |
| 502-01 |
superpave asphaltic concrete
|
48.1 |
TON |
350.00 |
16,835.00 |
500.00 |
24,050.00 |
224.00 |
10,774.40 |
225.00 |
10,822.50 |
| 701-05-I |
side drain pipe (24")
|
112   |
LNFT |
65.00 |
7,280.00 |
112.00 |
12,544.00 |
45.00 |
5,040.00 |
76.50 |
8,568.00 |
| 701-05-K |
side drain pipe (30")
|
40   |
LNFT |
85.00 |
3,400.00 |
160.00 |
6,400.00 |
59.00 |
2,360.00 |
104.90 |
4,196.00 |
| 705-01 |
barbed wire fence
|
80   |
LNFT |
18.00 |
1,440.00 |
15.00 |
1,200.00 |
25.00 |
2,000.00 |
17.90 |
1,432.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
22,000.00 |
22,000.00 |
17,500.00 |
17,500.00 |
11,100.00 |
11,100.00 |
5,600.00 |
5,600.00 |
| 716-01-A |
mulch (vegetative)
|
0.12 |
TON |
9,000.00 |
1,080.00 |
4,000.00 |
480.00 |
8,200.00 |
984.00 |
4,700.00 |
564.00 |
| 717-01 |
seeding
|
3   |
LB |
116.00 |
348.00 |
100.00 |
300.00 |
10.50 |
31.50 |
28.00 |
84.00 |
| 718-01 |
fertilizer
|
60   |
LB |
6.00 |
360.00 |
10.00 |
600.00 |
3.20 |
192.00 |
1.12 |
67.20 |
| 726-01 |
bedding material
|
55.5 |
CUYD |
72.00 |
3,996.00 |
100.00 |
5,550.00 |
140.00 |
7,770.00 |
87.10 |
4,834.05 |
| 727-01 |
mobilization
|
lump |
LUMP |
28,700.00 |
28,700.00 |
31,500.00 |
31,500.00 |
29,200.00 |
29,200.00 |
48,600.00 |
48,600.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
37.00 |
148.00 |
100.00 |
400.00 |
95.00 |
380.00 |
90.00 |
360.00 |
| 731-02 |
reflectorized raised pavement markers
|
4   |
EACH |
59.00 |
236.00 |
100.00 |
400.00 |
116.00 |
464.00 |
56.00 |
224.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.077 |
MILE |
34,000.00 |
2,618.00 |
40,000.00 |
3,080.00 |
15,000.00 |
1,155.00 |
32,500.00 |
2,502.50 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
14,300.00 |
14,300.00 |
14,430.00 |
14,430.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
19.10 |
CUYD |
1,226.00 |
23,416.60 |
1,600.00 |
30,560.00 |
1,310.00 |
25,021.00 |
1,772.00 |
33,845.20 |
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
156.0 |
LNFT |
505.00 |
78,780.00 |
478.00 |
74,568.00 |
640.00 |
99,840.00 |
909.00 |
141,804.00 |
| 806-01 |
deformed reinforcing steel
|
1,594   |
LB |
3.00 |
4,782.00 |
5.00 |
7,970.00 |
3.10 |
4,941.40 |
2.40 |
3,825.60 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
277,541.50 |
|
280,508.00 |
|
295,609.60 |
|
338,258.55 |
|