| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - KEY CONSTRUCTORS, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
50,000.00 |
50,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 3+008.19, 5.96m x 16.38m
4-span, treated timber) |
1   |
ea |
8,000.00 |
8,000.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
1   |
sq m |
500.00 |
500.00 |
500.00 |
500.00 |
450.00 |
450.00 |
1,200.00 |
1,200.00 |
| 203-05 |
excavation and embankment
|
lump |
lump |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
60,000.00 |
60,000.00 |
25,000.00 |
25,000.00 |
| 204-02 |
temporary hay or straw bales
|
15   |
ea |
10.00 |
150.00 |
10.00 |
150.00 |
12.00 |
180.00 |
15.00 |
225.00 |
| 204-06 |
temporary silt fencing
|
201   |
ln m |
5.00 |
1,005.00 |
10.00 |
2,010.00 |
5.00 |
1,005.00 |
15.00 |
3,015.00 |
| 302-01 |
class ii base course
|
130.3 |
cu m |
130.00 |
16,939.00 |
125.00 |
16,287.50 |
150.00 |
19,545.00 |
125.00 |
16,287.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3   |
cu m |
130.00 |
390.00 |
125.00 |
375.00 |
150.00 |
450.00 |
250.00 |
750.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
25.0 |
cu m |
50.00 |
1,250.00 |
125.00 |
3,125.00 |
100.00 |
2,500.00 |
115.00 |
2,875.00 |
| 502-01 |
superpave asphaltic concrete
|
102.7 |
Mg |
250.00 |
25,675.00 |
250.00 |
25,675.00 |
260.00 |
26,702.00 |
325.00 |
33,377.50 |
| 701-05-G-01 |
side drain pipe (450 mm) (erosion)
|
32.0 |
ln m |
158.00 |
5,056.00 |
120.00 |
3,840.00 |
135.00 |
4,320.00 |
195.00 |
6,240.00 |
| 701-05-K-01 |
side drain pipe (750 mm) (erosion)
|
41.0 |
ln m |
360.00 |
14,760.00 |
275.00 |
11,275.00 |
270.00 |
11,070.00 |
345.00 |
14,145.00 |
| 702-03-A |
catch basins (cb-01)
|
3   |
ea |
5,500.00 |
16,500.00 |
4,000.00 |
12,000.00 |
3,500.00 |
10,500.00 |
3,500.00 |
10,500.00 |
| 705-01 |
barbed wire fence
|
48   |
ln m |
20.00 |
960.00 |
40.00 |
1,920.00 |
11.00 |
528.00 |
25.00 |
1,200.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
44   |
ln m |
40.00 |
1,760.00 |
100.00 |
4,400.00 |
15.00 |
660.00 |
55.00 |
2,420.00 |
| 706-01-A |
concrete walk (100 mm thick)
|
4.0 |
sq m |
150.00 |
600.00 |
100.00 |
400.00 |
125.00 |
500.00 |
500.00 |
2,000.00 |
| 712-01-A |
concrete cast-in-place revetment (100 mm thick)
|
191.0 |
sq m |
150.00 |
28,650.00 |
85.00 |
16,235.00 |
115.00 |
21,965.00 |
90.00 |
17,190.00 |
| 712-04 |
flexible revetment
|
109   |
sq m |
100.00 |
10,900.00 |
100.00 |
10,900.00 |
85.00 |
9,265.00 |
95.00 |
10,355.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
12,500.00 |
12,500.00 |
15,000.00 |
15,000.00 |
13,500.00 |
13,500.00 |
15,000.00 |
15,000.00 |
| 716-01-A |
mulch (vegetative)
|
320.0 |
kg |
2.00 |
640.00 |
5.00 |
1,600.00 |
0.60 |
192.00 |
6.00 |
1,920.00 |
| 717-01 |
seeding
|
4   |
kg |
60.00 |
240.00 |
120.00 |
480.00 |
9.00 |
36.00 |
125.00 |
500.00 |
| 718-01 |
fertilizer
|
90   |
kg |
2.25 |
202.50 |
6.00 |
540.00 |
0.30 |
27.00 |
2.50 |
225.00 |
| 726-01 |
bedding material
|
3.0 |
cu m |
500.00 |
1,500.00 |
150.00 |
450.00 |
200.00 |
600.00 |
300.00 |
900.00 |
| 727-01 |
mobilization
|
lump |
lump |
38,000.00 |
38,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
100.00 |
400.00 |
110.00 |
440.00 |
80.00 |
320.00 |
100.00 |
400.00 |
| 740-01 |
construction layout
|
lump |
lump |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
22,000.00 |
22,000.00 |
25,000.00 |
25,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
307.5 |
ln m |
195.00 |
59,962.50 |
300.00 |
92,250.00 |
175.00 |
53,812.50 |
300.00 |
92,250.00 |
| 805-10-A |
bridge superstructure & substructure (7.3m clear rdwy.;
75deg crossing; curved; cip) |
4   |
span |
28,500.00 |
114,000.00 |
25,000.00 |
100,000.00 |
40,000.00 |
160,000.00 |
50,000.00 |
200,000.00 |
| S-101 |
vibration monitoring
|
lump |
lump |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
1,000.00 |
1,000.00 |
15,000.00 |
15,000.00 |
| S-102 |
concrete approach slab (7.3m clear rdwy; 75deg
crossing; curved; cip; tapered barrier rails) |
2   |
each |
11,500.00 |
23,000.00 |
10,000.00 |
20,000.00 |
6,500.00 |
13,000.00 |
10,000.00 |
20,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
418,540.00 |
|
447,352.50 |
|
511,627.50 |
|
657,975.00 |
|