Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 393-01-0006
Parish: VERMILION
Routes: LA 343
Description: JCT LA 14 TO JCT LA 699
Type Const: grading, in-place cement stabil. base course, lime treatment cold planing asphaltic
concrete, superpave asphaltic concrete pavement, and related work.
Estimated Construction Cost: $4,947,881.35
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $3,145,080.33
2 08815 W. E. MCDONALD & SON, LLC. $3,495,969.53
3 13086 M. MATT DURAND, LLC $3,568,680.28
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,629,111.00
5 12312 GILCHRIST CONSTRUCTION CO. LLC $3,772,863.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
M. MATT DURAND, LLC
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 43      SQYD 18.00 774.00 20.00 860.00 32.50 1,397.50 100.00 4,300.00
204-02 temporary hay or straw bales 20      EACH 17.00 340.00 5.00 100.00 58.00 1,160.00 70.00 1,400.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 84,610      SQYD 4.26 360,438.60 5.35 452,663.50 5.30 448,433.00 5.25 444,202.50
304-05 lime treatment (type e) 80.00   TON 374.00 29,920.00 450.00 36,000.00 290.00 23,200.00 506.00 40,480.00
401-02 aggregate surface course (adjusted vehicular
measurement)
4,123      CUYD 28.80 118,742.40 1.00 4,123.00 80.00 329,840.00 78.00 321,594.00
502-01 superpave asphaltic concrete 17,402.4    TON 90.00 1,566,216.00 103.00 1,792,447.20 91.00 1,583,618.40 88.00 1,531,411.20
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,816.6    TON 120.00 337,992.00 128.00 360,524.80 115.00 323,909.00 150.00 422,490.00
507-01-A asphaltic material (crs-2p emulsion) 55,090      GAL 3.93 216,503.70 4.25 234,132.50 4.80 264,432.00 4.50 247,905.00
507-02-B aggregate (s2) 81,014      SQYD 1.25 101,267.50 1.30 105,318.20 1.45 117,470.30 1.35 109,368.90
507-02-C aggregate (s3) 81,014      SQYD 1.13 91,545.82 1.05 85,064.70 1.15 93,166.10 1.15 93,166.10
509-01 cold planing asphaltic pavement 73,823      SQYD 1.14 84,158.22 1.15 84,896.45 1.10 81,205.30 1.45 107,043.35
509-02 contractor retained reclaimed asphaltic pavement - 2,692      CUYD 0.01 - 26.92 0.01 - 26.92 0.50 - 1,346.00 0.10 - 269.20
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 6,150.00 6,150.00 65,000.00 65,000.00 11,500.00 11,500.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
12.077  MILE 388.00 4,685.88 400.00 4,830.80 670.00 8,091.59 150.00 1,811.55
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.039  MILE 351.00 2,119.69 300.00 1,811.70 370.00 2,234.43 300.00 1,811.70
713-04-A temporary pavement markings (solid line)(4" width) 13.642  MILE 513.00 6,998.35 600.00 8,185.20 530.00 7,230.26 300.00 4,092.60
713-06-A temporary reflectorized raised pavement markers (tabs) 1,620      EACH 1.08 1,749.60 2.00 3,240.00 1.15 1,863.00 2.10 3,402.00
722-02 project site laboratory (equipped) 1      EACH 11,000.00 11,000.00 6,000.00 6,000.00 10,300.00 10,300.00 7,000.00 7,000.00
727-01 mobilization lump      LUMP 55,000.00 55,000.00 165,000.00 165,000.00 40,000.00 40,000.00 139,000.00 139,000.00
729-16-B object marker assembly (type 2) 14      EACH 54.00 756.00 85.00 1,190.00 75.00 1,050.00 55.00 770.00
731-02 reflectorized raised pavement markers 810      EACH 5.51 4,463.10 4.50 3,645.00 5.80 4,698.00 5.00 4,050.00
732-02-A plastic pavement striping (solid line) (4" width) 13.642  MILE 2,819.00 38,456.80 2,500.00 34,105.00 2,850.00 38,879.70 2,600.00 35,469.20
732-03-A plastic pavement striping (broken line)(4" width) 6.039  MILE 767.00 4,631.91 600.00 3,623.40 805.00 4,861.40 650.00 3,925.35
735-01 mailboxes 143      EACH 1.08 154.44 1.00 143.00 20.00 2,860.00 1.00 143.00
735-02 mailbox supports (single) 152      EACH 114.00 17,328.00 119.00 18,088.00 75.00 11,400.00 110.00 16,720.00
740-01 construction layout lump      LUMP 5,200.00 5,200.00 6,000.00 6,000.00 35,000.00 35,000.00 7,500.00 7,500.00
S-001 cement treatment (12" thick)(4% by volume) 12,691      SQYD 5.00 63,455.00 6.00 76,146.00 5.30 67,262.30 5.25 66,627.75
S-002 full depth sawcutting of existing portland cement
concrete drives
976      INFT 1.24 1,210.24 1.75 1,708.00 1.50 1,464.00 2.25 2,196.00
                       
 CONTRACTOR TOTAL       3,145,080.33   3,495,969.53   3,568,680.28   3,629,111.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 43      SQYD 25.00 1,075.00            
204-02 temporary hay or straw bales 20      EACH 20.00 400.00            
303-01-B in-place cement stabilized base course (8 1/2" thick) 84,610      SQYD 4.60 389,206.00            
304-05 lime treatment (type e) 80.00   TON 450.00 36,000.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
4,123      CUYD 75.00 309,225.00            
502-01 superpave asphaltic concrete 17,402.4    TON 95.00 1,653,228.00            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,816.6    TON 145.00 408,407.00            
507-01-A asphaltic material (crs-2p emulsion) 55,090      GAL 4.50 247,905.00            
507-02-B aggregate (s2) 81,014      SQYD 1.50 121,521.00            
507-02-C aggregate (s3) 81,014      SQYD 1.20 97,216.80            
509-01 cold planing asphaltic pavement 73,823      SQYD 0.55 40,602.65            
509-02 contractor retained reclaimed asphaltic pavement - 2,692      CUYD 0.80 - 2,153.60            
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
12.077  MILE 450.00 5,434.65            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
6.039  MILE 450.00 2,717.55            
713-04-A temporary pavement markings (solid line)(4" width) 13.642  MILE 200.00 2,728.40            
713-06-A temporary reflectorized raised pavement markers (tabs) 1,620      EACH 1.00 1,620.00            
722-02 project site laboratory (equipped) 1      EACH 14,000.00 14,000.00            
727-01 mobilization lump      LUMP 275,000.00 275,000.00            
729-16-B object marker assembly (type 2) 14      EACH 55.00 770.00            
731-02 reflectorized raised pavement markers 810      EACH 5.80 4,698.00            
732-02-A plastic pavement striping (solid line) (4" width) 13.642  MILE 2,800.00 38,197.60            
732-03-A plastic pavement striping (broken line)(4" width) 6.039  MILE 800.00 4,831.20            
735-01 mailboxes 143      EACH 1.15 164.45            
735-02 mailbox supports (single) 152      EACH 120.00 18,240.00            
740-01 construction layout lump      LUMP 15,000.00 15,000.00            
S-001 cement treatment (12" thick)(4% by volume) 12,691      SQYD 5.75 72,973.25            
S-002 full depth sawcutting of existing portland cement
concrete drives
976      INFT 6.00 5,856.00            
                       
 CONTRACTOR TOTAL       3,772,863.95            