Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 354-01-0007
Parish: CATAHOULA
Routes: LA 922
Description: USACE PARK - 1.75 MI. SE OF LA 8
Type Const: cold planing asphaltic concrete, class ii base course, lime treatment, superpave
asphaltic concrete overlay and related work.
Estimated Construction Cost: $1,175,436.26
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $955,716.20
2 12312 GILCHRIST CONSTRUCTION CO. LLC $976,628.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-G removal of surfacing & stabilized base 400.0    SQYD 9.00 3,600.00 5.00 2,000.00        
202-02-I removal of aggregate surface course (vehicular
measurement)
500      CUYD 40.00 20,000.00 10.00 5,000.00        
302-02-D class ii base course (8 1/2" thick) 5,339.0    SQYD 30.00 160,170.00 20.00 106,780.00        
304-01 lime 82.70   TON 180.00 14,886.00 160.00 13,232.00        
304-04-D lime treatment (type d) (12" thick) 5,250      SQYD 6.00 31,500.00 1.50 7,875.00        
308-02 removal of existing patches 100      SQYD 20.00 2,000.00 10.00 1,000.00        
401-01 aggregate surface course (net section) 166.7    CUYD 55.00 9,168.50 65.00 10,835.50        
401-02 aggregate surface course (adjusted vehicular
measurement)
913      CUYD 55.00 50,215.00 63.00 57,519.00        
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 20.00 10,000.00 5.00 2,500.00        
502-01 superpave asphaltic concrete 5,358.4    TON 90.00 482,256.00 115.00 616,216.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
52.7    TON 300.00 15,810.00 275.00 14,492.50        
509-01 cold planing asphaltic pavement 454      SQYD 20.00 9,080.00 30.00 13,620.00        
509-02 contractor retained reclaimed asphaltic pavement - 13      CUYD 1.00 - 13.00 1.00 - 13.00        
713-01 temporary signs & barricades lump      LUMP 28,000.00 28,000.00 12,000.00 12,000.00        
713-04-A temporary pavement markings (solid line)(4" width) 6.088  MILE 250.00 1,522.00 850.00 5,174.80        
713-06-A temporary reflectorized raised pavement markers (tabs) 537      EACH 1.50 805.50 6.00 3,222.00        
722-01 project site laboratory 1      EACH 2,000.00 2,000.00 6,000.00 6,000.00        
727-01 mobilization lump      LUMP 71,000.00 71,000.00 60,000.00 60,000.00        
731-02 reflectorized raised pavement markers 269      EACH 10.00 2,690.00 5.50 1,479.50        
732-02-A plastic pavement striping (solid line) (4" width) 4.059  MILE 3,300.00 13,394.70 2,500.00 10,147.50        
732-05 removal of existing markings 4.059  MILE 3,500.00 14,206.50 5,000.00 20,295.00        
735-01 mailboxes 3      EACH 25.00 75.00 1.00 3.00        
735-02 mailbox supports (single) 3      EACH 250.00 750.00 250.00 750.00        
740-01 construction layout lump      LUMP 12,600.00 12,600.00 6,500.00 6,500.00        
                       
 CONTRACTOR TOTAL       955,716.20   976,628.80        