| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
88   |
SQYD |
10.00 |
880.00 |
25.00 |
2,200.00 |
20.00 |
1,760.00 |
|
|
| 202-02-H |
removal of guard rail
|
404   |
LNFT |
8.00 |
3,232.00 |
13.00 |
5,252.00 |
17.00 |
6,868.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
4,300   |
CUYD |
15.00 |
64,500.00 |
12.00 |
51,600.00 |
16.50 |
70,950.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
926   |
CUYD |
10.00 |
9,260.00 |
13.00 |
12,038.00 |
16.50 |
15,279.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
42,315   |
SQYD |
8.75 |
370,256.25 |
8.00 |
338,520.00 |
9.70 |
410,455.50 |
|
|
| 308-02 |
removal of existing patches
|
100   |
SQYD |
20.00 |
2,000.00 |
5.00 |
500.00 |
27.00 |
2,700.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
154   |
CUYD |
50.00 |
7,700.00 |
85.00 |
13,090.00 |
34.00 |
5,236.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
231.7 |
CUYD |
6.00 |
1,390.20 |
50.00 |
11,585.00 |
21.00 |
4,865.70 |
|
|
| 502-01 |
superpave asphaltic concrete
|
7,793.7 |
TON |
98.00 |
763,782.60 |
92.00 |
717,020.40 |
88.00 |
685,845.60 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
550.8 |
TON |
125.00 |
68,850.00 |
175.00 |
96,390.00 |
145.00 |
79,866.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
12,551   |
GAL |
4.05 |
50,831.55 |
4.80 |
60,244.80 |
4.50 |
56,479.50 |
|
|
| 507-02-C |
aggregate (s3)
|
40,486   |
SQYD |
1.05 |
42,510.30 |
1.30 |
52,631.80 |
2.00 |
80,972.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
36,833   |
SQYD |
1.10 |
40,516.30 |
0.50 |
18,416.50 |
2.75 |
101,290.75 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,067   |
CUYD |
0.10 |
- 306.70 |
1.00 |
- 3,067.00 |
0.10 |
- 306.70 |
|
|
| 701-08 |
relaying pipe
|
3   |
LNFT |
125.00 |
375.00 |
800.00 |
2,400.00 |
110.00 |
330.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
130.00 |
1,040.00 |
400.00 |
3,200.00 |
160.00 |
1,280.00 |
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
600.00 |
1,200.00 |
1,500.00 |
3,000.00 |
650.00 |
1,300.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
50.00 |
5,000.00 |
55.00 |
5,500.00 |
51.00 |
5,100.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
190.0 |
LNFT |
60.00 |
11,400.00 |
65.00 |
12,350.00 |
62.00 |
11,780.00 |
|
|
| 704-03 |
blocked out guard rail
|
75.0 |
LNFT |
25.00 |
1,875.00 |
25.00 |
1,875.00 |
27.00 |
2,025.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,400.00 |
9,600.00 |
2,200.00 |
8,800.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
66.3 |
SQYD |
65.00 |
4,309.50 |
85.00 |
5,635.50 |
62.00 |
4,110.60 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,000.00 |
7,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.300 |
MILE |
225.00 |
2,092.50 |
400.00 |
3,720.00 |
150.00 |
1,395.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.300 |
MILE |
200.00 |
1,860.00 |
450.00 |
4,185.00 |
300.00 |
2,790.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
37.300 |
MILE |
1.00 |
37.30 |
400.00 |
14,920.00 |
300.00 |
11,190.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
412   |
EACH |
1.50 |
618.00 |
2.50 |
1,030.00 |
2.50 |
1,030.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
12.1 |
TON |
500.00 |
6,050.00 |
500.00 |
6,050.00 |
500.00 |
6,050.00 |
|
|
| 717-01 |
seeding
|
360   |
LB |
8.00 |
2,880.00 |
10.00 |
3,600.00 |
8.50 |
3,060.00 |
|
|
| 718-01 |
fertilizer
|
6,033   |
LB |
0.45 |
2,714.85 |
0.50 |
3,016.50 |
0.50 |
3,016.50 |
|
|
| 726-01 |
bedding material
|
22.0 |
CUYD |
100.00 |
2,200.00 |
150.00 |
3,300.00 |
110.00 |
2,420.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
85,000.00 |
85,000.00 |
100,000.00 |
100,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
100.00 |
800.00 |
80.00 |
640.00 |
75.00 |
600.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
100.00 |
800.00 |
85.00 |
680.00 |
80.00 |
640.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
412   |
EACH |
8.00 |
3,296.00 |
6.00 |
2,472.00 |
5.00 |
2,060.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.057 |
MILE |
2,800.00 |
30,959.60 |
2,400.00 |
26,536.80 |
2,750.00 |
30,406.75 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.055 |
MILE |
1,600.00 |
1,688.00 |
900.00 |
949.50 |
320.00 |
337.60 |
|
|
| 735-01 |
mailboxes
|
46   |
EACH |
25.00 |
1,150.00 |
10.00 |
460.00 |
1.00 |
46.00 |
|
|
| 735-02 |
mailbox supports (single)
|
38   |
EACH |
125.00 |
4,750.00 |
125.00 |
4,750.00 |
110.00 |
4,180.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
200.00 |
400.00 |
175.00 |
350.00 |
165.00 |
330.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
285.00 |
285.00 |
275.00 |
275.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
15,000.00 |
15,000.00 |
12,000.00 |
12,000.00 |
|
|
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
12.0 |
LNFT |
450.00 |
5,400.00 |
1,200.00 |
14,400.00 |
650.00 |
7,800.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
8.0 |
LNFT |
475.00 |
3,800.00 |
1,400.00 |
11,200.00 |
650.00 |
5,200.00 |
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
18,000.00 |
18,000.00 |
5,000.00 |
5,000.00 |
14,000.00 |
14,000.00 |
|
|
| S-002 |
cleaning existing ditches
|
4,050   |
LNFT |
6.50 |
26,325.00 |
7.80 |
31,590.00 |
10.00 |
40,500.00 |
|
|
| S-003 |
saw cutting concrete drives (6" depth)
|
50   |
LNFT |
9.00 |
450.00 |
15.00 |
750.00 |
10.00 |
500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,629,523.25 |
|
1,699,866.80 |
|
1,839,313.80 |
|
|
|