| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
61   |
SQYD |
10.00 |
610.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
2,500   |
CUYD |
10.00 |
25,000.00 |
|
|
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,966   |
CUYD |
10.00 |
19,660.00 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
25,505   |
SQYD |
8.30 |
211,691.50 |
|
|
|
|
|
|
| 308-02 |
removal of existing patches
|
100   |
SQYD |
1.00 |
100.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
32   |
CUYD |
50.00 |
1,600.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
479.1 |
CUYD |
1.00 |
479.10 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,805.6 |
TON |
108.50 |
304,407.60 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
148.1 |
TON |
65.00 |
9,626.50 |
|
|
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
7,907   |
GAL |
3.00 |
23,721.00 |
|
|
|
|
|
|
| 507-02-C |
aggregate (s3)
|
25,505   |
SQYD |
3.50 |
89,267.50 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
51.3 |
SQYD |
75.00 |
3,847.50 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,500.00 |
40,500.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.790 |
MILE |
400.00 |
716.00 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.580 |
MILE |
1.00 |
3.58 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
14.348 |
MILE |
1.00 |
14.35 |
|
|
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
474   |
EACH |
1.85 |
876.90 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
7.0 |
TON |
600.00 |
4,200.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
209   |
LB |
8.00 |
1,672.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
3,480   |
LB |
1.00 |
3,480.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,500.00 |
40,500.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
3   |
EACH |
100.00 |
300.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
238   |
EACH |
5.00 |
1,190.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.174 |
MILE |
2,500.00 |
17,935.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.900 |
MILE |
600.00 |
540.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
1.00 |
6.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
250.00 |
1,000.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
250.00 |
250.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
14,500.00 |
14,500.00 |
|
|
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| S-002 |
saw cutting concrete drives (6"depth)
|
22   |
LNFT |
15.00 |
330.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
835,524.53 |
|
|
|
|
|
|
|