February 06, 2014 Error processing SSI file

Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 287-04-0002
Parish: WEBSTER, BIENVILLE
Routes: LA 793
Description: BLACK LAKE BAYOU TO LA 154
Type Const: grading, drainage structures, pavement patching, in-place cement treated base course,
superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $1,745,745.70
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,831,684.74
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,659      LNFT 7.00 11,613.00            
202-02-J removal of asphaltic surfacing from bridge decks 1,537      SQYD 5.00 7,685.00            
203-07 borrow (vehicular measurement) 6,000      CUYD 10.00 60,000.00            
203-07-A borrow (vehicular meas.)(selected soils) 2,000      CUYD 10.00 20,000.00            
303-02 removal of existing patches 600      SQYD 1.00 600.00            
308-01-A in-place cement treated base course (12" thick) 62,378      SQYD 7.90 492,786.20            
401-02 aggregate surface course (adjusted vehicular
measurement)
81      CUYD 51.00 4,131.00            
502-01 superpave asphaltic concrete 7,387.4    TON 105.25 777,523.85            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
500.0    TON 60.00 30,000.00            
510-01-A pavement patching (6" minimum thickness) 20      SQYD 35.00 700.00            
701-08 relaying pipe 16      LNFT 200.00 3,200.00            
701-10-I reinforced concrete pipe (extension)(24") 12      LNFT 220.00 2,640.00            
701-15 concrete collar 4      EACH 750.00 3,000.00            
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 300.0    LNFT 50.00 15,000.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 994.0    LNFT 60.00 59,640.00            
704-03 blocked out guard rail 225.0    LNFT 22.00 4,950.00            
704-11-A guard rail end treatment (flared) 12      EACH 2,100.00 25,200.00            
712-02 sacked concrete revetment 68      SQYD 80.00 5,440.00            
713-01 temporary signs & barricades lump      LUMP 72,500.00 72,500.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.259  MILE 400.00 2,103.60            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
1.809  MILE 1.00 1.81            
713-04-A temporary pavement markings (solid line)(4" width) 14.880  MILE 1.00 14.88            
716-01-A mulch (vegetative) 12.3    TON 600.00 7,380.00            
717-01 seeding 247      LB 8.00 1,976.00            
718-01 fertilizer 6,160      LB 0.50 3,080.00            
722-02 project site laboratory (equipped) 1      EACH 8,500.00 8,500.00            
727-01 mobilization lump      LUMP 72,500.00 72,500.00            
729-16-B object marker assembly (type 2) 4      EACH 65.00 260.00            
729-16-C object marker assembly (type 3) 12      EACH 75.00 900.00            
731-02 reflectorized raised pavement markers 696      EACH 4.50 3,132.00            
732-01-E plastic pavement striping (24" width) 80      LNFT 3.00 240.00            
732-02-A plastic pavement striping (solid line) (4" width) 14.880  MILE 2,500.00 37,200.00            
732-03-A plastic pavement striping (broken line)(4" width) 1.809  MILE 600.00 1,085.40            
735-01 mailboxes 12      EACH 1.00 12.00            
735-02 mailbox supports (single) 10      EACH 170.00 1,700.00            
735-03 mailbox supports (double) 1      EACH 175.00 175.00            
740-01 construction layout lump      LUMP 15,000.00 15,000.00            
S-001 surface preparation lump      LUMP 79,815.00 79,815.00            
                       
 CONTRACTOR TOTAL       1,831,684.74            