| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BYRON E. TALBOT CONTRACTOR, INC. |
- 2 - PHYLWAY CONSTRUCTION LLC |
- 3 - CYCLE CONSTRUCTION CO. L.L.C. |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
7,500.00 |
7,500.00 |
45,000.00 |
45,000.00 |
52,000.00 |
52,000.00 |
16,000.00 |
16,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
567   |
SQYD |
5.00 |
2,835.00 |
14.00 |
7,938.00 |
6.00 |
3,402.00 |
10.00 |
5,670.00 |
| 203-07 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
11.00 |
16,500.00 |
21.00 |
31,500.00 |
21.00 |
31,500.00 |
35.00 |
52,500.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
93   |
CUYD |
42.00 |
3,906.00 |
105.00 |
9,765.00 |
105.00 |
9,765.00 |
130.00 |
12,090.00 |
| 502-01 |
superpave asphaltic concrete
|
3,948.0 |
TON |
101.00 |
398,748.00 |
110.00 |
434,280.00 |
100.00 |
394,800.00 |
110.00 |
434,280.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
18.8 |
TON |
101.00 |
1,898.80 |
110.00 |
2,068.00 |
100.00 |
1,880.00 |
250.00 |
4,700.00 |
| 509-01 |
cold planing asphaltic pavement
|
10,272   |
SQYD |
1.06 |
10,888.32 |
1.10 |
11,299.20 |
1.25 |
12,840.00 |
3.00 |
30,816.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 571   |
CUYD |
1.00 |
- 571.00 |
1.00 |
- 571.00 |
1.00 |
- 571.00 |
15.00 |
- 8,565.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
630   |
SQYD |
86.00 |
54,180.00 |
90.00 |
56,700.00 |
90.00 |
56,700.00 |
125.00 |
78,750.00 |
| 510-02 |
pavement widening
|
1,236.0 |
SQYD |
64.00 |
79,104.00 |
65.00 |
80,340.00 |
65.00 |
80,340.00 |
70.00 |
86,520.00 |
| 701-03-I |
storm drain pipe (24" rcp)
|
1,584   |
LNFT |
66.00 |
104,544.00 |
78.00 |
123,552.00 |
90.00 |
142,560.00 |
125.00 |
198,000.00 |
| 701-03-O |
storm drain pipe (48" rcp)
|
1,048   |
LNFT |
139.00 |
145,672.00 |
180.00 |
188,640.00 |
300.00 |
314,400.00 |
250.00 |
262,000.00 |
| 701-05-E |
side drain pipe (12 inch)
|
50   |
LNFT |
41.00 |
2,050.00 |
35.00 |
1,750.00 |
88.00 |
4,400.00 |
70.00 |
3,500.00 |
| 701-05-G |
side drain pipe (18")
|
16   |
LNFT |
55.00 |
880.00 |
48.00 |
768.00 |
86.00 |
1,376.00 |
110.00 |
1,760.00 |
| 701-07-C |
yard drain pipe (8")
|
40   |
LNFT |
36.00 |
1,440.00 |
14.00 |
560.00 |
65.00 |
2,600.00 |
50.00 |
2,000.00 |
| 702-02-C |
manholes (r-cb-11 mod)
|
1   |
EACH |
3,500.00 |
3,500.00 |
5,200.00 |
5,200.00 |
8,500.00 |
8,500.00 |
6,000.00 |
6,000.00 |
| 702-03-A |
catch basins (cb-01)
|
16   |
EACH |
2,300.00 |
36,800.00 |
2,900.00 |
46,400.00 |
2,700.00 |
43,200.00 |
5,000.00 |
80,000.00 |
| 702-03-B |
catch basins (cb-02)
|
7   |
EACH |
3,200.00 |
22,400.00 |
4,300.00 |
30,100.00 |
3,500.00 |
24,500.00 |
5,000.00 |
35,000.00 |
| 702-03-H |
catch basins (cb-05)
|
5   |
EACH |
500.00 |
2,500.00 |
700.00 |
3,500.00 |
1,500.00 |
7,500.00 |
1,000.00 |
5,000.00 |
| 702-04-A |
adjusting manholes
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 702-04-C |
adjusting junction boxes
|
1   |
EACH |
4,000.00 |
4,000.00 |
2,200.00 |
2,200.00 |
16,000.00 |
16,000.00 |
3,000.00 |
3,000.00 |
| 706-01-C |
concrete walk (6" thick)
|
62.5 |
SQYD |
62.00 |
3,875.00 |
84.00 |
5,250.00 |
125.00 |
7,812.50 |
90.00 |
5,625.00 |
| 706-02-C |
concrete drive (6" thick)
|
504.5 |
SQYD |
62.00 |
31,279.00 |
84.00 |
42,378.00 |
70.00 |
35,315.00 |
100.00 |
50,450.00 |
| 707-03 |
combination concrete curb & gutter
|
215.0 |
LNFT |
30.00 |
6,450.00 |
35.00 |
7,525.00 |
34.00 |
7,310.00 |
50.00 |
10,750.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,000.00 |
17,000.00 |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| 713-02-C |
temporary pavement markings (8" width)
|
450   |
LNFT |
0.27 |
121.50 |
0.30 |
135.00 |
0.28 |
126.00 |
0.30 |
135.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
240   |
LNFT |
0.76 |
182.40 |
0.80 |
192.00 |
0.80 |
192.00 |
0.75 |
180.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.940 |
MILE |
550.00 |
2,167.00 |
220.00 |
866.80 |
625.00 |
2,462.50 |
500.00 |
1,970.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.370 |
MILE |
340.00 |
465.80 |
340.00 |
465.80 |
350.00 |
479.50 |
400.00 |
548.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
1.816 |
MILE |
465.00 |
844.44 |
450.00 |
817.20 |
485.00 |
880.76 |
500.00 |
908.00 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
13   |
EACH |
27.50 |
357.50 |
27.00 |
351.00 |
30.00 |
390.00 |
25.00 |
325.00 |
| 713-05-C |
temporary pavement legends and symbols (only)
|
13   |
EACH |
27.50 |
357.50 |
27.00 |
351.00 |
30.00 |
390.00 |
25.00 |
325.00 |
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
12   |
EACH |
55.00 |
660.00 |
55.00 |
660.00 |
55.00 |
660.00 |
25.00 |
300.00 |
| 717-01 |
seeding
|
27   |
LB |
43.00 |
1,161.00 |
10.00 |
270.00 |
60.00 |
1,620.00 |
50.00 |
1,350.00 |
| 718-01 |
fertilizer
|
841   |
LB |
3.29 |
2,766.89 |
1.00 |
841.00 |
2.00 |
1,682.00 |
1.00 |
841.00 |
| 726-01 |
bedding material
|
732.0 |
CUYD |
63.00 |
46,116.00 |
64.00 |
46,848.00 |
48.00 |
35,136.00 |
30.00 |
21,960.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
92,000.00 |
92,000.00 |
154,000.00 |
154,000.00 |
120,000.00 |
120,000.00 |
175,000.00 |
175,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
689   |
EACH |
5.60 |
3,858.40 |
5.50 |
3,789.50 |
6.00 |
4,134.00 |
5.00 |
3,445.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
225   |
LNFT |
1.05 |
236.25 |
1.00 |
225.00 |
1.00 |
225.00 |
1.00 |
225.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
50   |
LNFT |
4.30 |
215.00 |
4.00 |
200.00 |
4.50 |
225.00 |
4.00 |
200.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
1.016 |
MILE |
3,900.00 |
3,962.40 |
3,800.00 |
3,860.80 |
4,000.00 |
4,064.00 |
3,500.00 |
3,556.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.820 |
MILE |
1,650.00 |
1,353.00 |
1,600.00 |
1,312.00 |
1,700.00 |
1,394.00 |
1,500.00 |
1,230.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
220.00 |
1,100.00 |
210.00 |
1,050.00 |
225.00 |
1,125.00 |
200.00 |
1,000.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
230.00 |
1,150.00 |
230.00 |
1,150.00 |
240.00 |
1,200.00 |
200.00 |
1,000.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
440.00 |
1,760.00 |
440.00 |
1,760.00 |
455.00 |
1,820.00 |
400.00 |
1,600.00 |
| 732-05 |
removal of existing markings
|
0.273 |
MILE |
6,400.00 |
1,747.20 |
3,500.00 |
955.50 |
6,500.00 |
1,774.50 |
6,000.00 |
1,638.00 |
| 735-01 |
mailboxes
|
25   |
EACH |
1.10 |
27.50 |
1.00 |
25.00 |
6.00 |
150.00 |
5.00 |
125.00 |
| 735-02 |
mailbox supports (single)
|
25   |
EACH |
105.00 |
2,625.00 |
100.00 |
2,500.00 |
100.00 |
2,500.00 |
130.00 |
3,250.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
7,000.00 |
7,000.00 |
| 741-01-A |
water main (4" ac)
|
780   |
LNFT |
54.00 |
42,120.00 |
52.00 |
40,560.00 |
48.00 |
37,440.00 |
50.00 |
39,000.00 |
| 741-01-B |
water main (6" ac)
|
300   |
LNFT |
63.00 |
18,900.00 |
61.00 |
18,300.00 |
85.00 |
25,500.00 |
80.00 |
24,000.00 |
| 741-06 |
relocating fire hydrant
|
2   |
EACH |
1,400.00 |
2,800.00 |
1,900.00 |
3,800.00 |
1,300.00 |
2,600.00 |
2,400.00 |
4,800.00 |
| 741-07 |
relocating water valve
|
4   |
EACH |
1,500.00 |
6,000.00 |
950.00 |
3,800.00 |
2,600.00 |
10,400.00 |
4,700.00 |
18,800.00 |
| 741-08 |
relocating water meter
|
10   |
EACH |
550.00 |
5,500.00 |
580.00 |
5,800.00 |
400.00 |
4,000.00 |
400.00 |
4,000.00 |
| 741-10 |
adjusting water service lines
|
50   |
LNFT |
60.00 |
3,000.00 |
14.00 |
700.00 |
75.00 |
3,750.00 |
30.00 |
1,500.00 |
| S-002 |
cleaning existing ditches
|
4,500   |
LNFT |
4.00 |
18,000.00 |
10.00 |
45,000.00 |
5.00 |
22,500.00 |
12.00 |
54,000.00 |
| S-003 |
saw cutting portland cement concrete pavement
|
678   |
INFT |
1.50 |
1,017.00 |
1.50 |
1,017.00 |
10.00 |
6,780.00 |
2.00 |
1,356.00 |
| S-004 |
saw cutting asphaltic concrete pavement
|
515   |
INFT |
1.50 |
772.50 |
1.25 |
643.75 |
7.00 |
3,605.00 |
1.00 |
515.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,233,923.40 |
|
1,537,588.55 |
|
1,599,334.76 |
|
1,773,928.00 |
|