| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 4 - BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,500.00 |
1,500.00 |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
25,000.00 |
25,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
370.0 |
SQYD |
10.00 |
3,700.00 |
25.00 |
9,250.00 |
15.00 |
5,550.00 |
100.00 |
37,000.00 |
| 202-02-I |
removal of asphalt drives
|
170   |
EACH |
1.00 |
170.00 |
255.00 |
43,350.00 |
50.00 |
8,500.00 |
350.00 |
59,500.00 |
| 203-07 |
borrow (vehicular measurement)
|
1,569   |
CUYD |
5.00 |
7,845.00 |
30.00 |
47,070.00 |
15.00 |
23,535.00 |
20.00 |
31,380.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
4,752   |
CUYD |
5.00 |
23,760.00 |
30.00 |
142,560.00 |
15.00 |
71,280.00 |
15.00 |
71,280.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
15.50 |
465.00 |
16.00 |
480.00 |
15.00 |
450.00 |
20.00 |
600.00 |
| 204-06 |
temporary silt fencing
|
8,237   |
LNFT |
1.40 |
11,531.80 |
2.00 |
16,474.00 |
1.25 |
10,296.25 |
1.50 |
12,355.50 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
85,536   |
SQYD |
5.00 |
427,680.00 |
6.00 |
513,216.00 |
8.00 |
684,288.00 |
7.00 |
598,752.00 |
| 308-02 |
removal of existing patches
|
150   |
SQYD |
50.00 |
7,500.00 |
15.00 |
2,250.00 |
15.00 |
2,250.00 |
35.00 |
5,250.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,154   |
CUYD |
25.00 |
53,850.00 |
26.00 |
56,004.00 |
20.00 |
43,080.00 |
80.00 |
172,320.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
20.0 |
CUYD |
1,000.00 |
20,000.00 |
60.00 |
1,200.00 |
35.00 |
700.00 |
120.00 |
2,400.00 |
| 502-01 |
superpave asphaltic concrete
|
22,656.5 |
TON |
80.00 |
1,812,520.00 |
75.00 |
1,699,237.50 |
100.00 |
2,265,650.00 |
95.00 |
2,152,367.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
5,747.0 |
TON |
1.00 |
5,747.00 |
1.00 |
5,747.00 |
75.00 |
431,025.00 |
125.00 |
718,375.00 |
| 509-01 |
cold planing asphaltic pavement
|
74,859   |
SQYD |
2.00 |
149,718.00 |
1.75 |
131,003.25 |
4.50 |
336,865.50 |
2.50 |
187,147.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,119   |
CUYD |
10.00 |
- 31,190.00 |
0.10 |
- 311.90 |
0.00 |
0.00 |
0.00 |
0.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
90.00 |
45,000.00 |
78.00 |
39,000.00 |
135.00 |
67,500.00 |
100.00 |
50,000.00 |
| 510-02 |
pavement widening
|
306.0 |
SQYD |
130.00 |
39,780.00 |
50.00 |
15,300.00 |
135.00 |
41,310.00 |
100.00 |
30,600.00 |
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
50   |
LNFT |
400.00 |
20,000.00 |
130.00 |
6,500.00 |
325.00 |
16,250.00 |
250.00 |
12,500.00 |
| 701-02-F/F |
cross drain pipe arch (36" equiv. rcpa or 36" equiv.
cmpa) |
102   |
LNFT |
400.00 |
40,800.00 |
165.00 |
16,830.00 |
350.00 |
35,700.00 |
275.00 |
28,050.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
13,000.00 |
13,000.00 |
125,000.00 |
125,000.00 |
50,000.00 |
50,000.00 |
| 713-02-E |
temporary pavement markings (24" width)
|
36   |
LNFT |
1.00 |
36.00 |
0.65 |
23.40 |
0.20 |
7.20 |
1.00 |
36.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
23.540 |
MILE |
160.00 |
3,766.40 |
150.00 |
3,531.00 |
650.00 |
15,301.00 |
300.00 |
7,062.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
27.100 |
MILE |
1.00 |
27.10 |
210.00 |
5,691.00 |
100.00 |
2,710.00 |
200.00 |
5,420.00 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
95.810 |
MILE |
1.00 |
95.81 |
210.00 |
20,120.10 |
100.00 |
9,581.00 |
200.00 |
19,162.00 |
| 717-01 |
seeding
|
323   |
LB |
8.00 |
2,584.00 |
8.50 |
2,745.50 |
12.00 |
3,876.00 |
12.00 |
3,876.00 |
| 718-01 |
fertilizer
|
10,751   |
LB |
0.40 |
4,300.40 |
0.42 |
4,515.42 |
0.50 |
5,375.50 |
0.50 |
5,375.50 |
| 726-01 |
bedding material
|
27.2 |
CUYD |
100.00 |
2,720.00 |
85.00 |
2,312.00 |
1.00 |
27.20 |
100.00 |
2,720.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
230,500.00 |
230,500.00 |
257,500.00 |
257,500.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
76   |
EACH |
76.00 |
5,776.00 |
85.00 |
6,460.00 |
85.00 |
6,460.00 |
75.00 |
5,700.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,870   |
EACH |
5.10 |
9,537.00 |
5.50 |
10,285.00 |
6.00 |
11,220.00 |
6.00 |
11,220.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
5.00 |
60.00 |
4.00 |
48.00 |
5.00 |
60.00 |
5.00 |
60.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
39.820 |
MILE |
2,700.00 |
107,514.00 |
2,750.00 |
109,505.00 |
2,900.00 |
115,478.00 |
3,000.00 |
119,460.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.400 |
MILE |
750.00 |
8,550.00 |
750.00 |
8,550.00 |
850.00 |
9,690.00 |
1,000.00 |
11,400.00 |
| 735-01 |
mailboxes
|
109   |
EACH |
1.10 |
119.90 |
5.00 |
545.00 |
5.00 |
545.00 |
7.00 |
763.00 |
| 735-02 |
mailbox supports (single)
|
109   |
EACH |
110.00 |
11,990.00 |
95.00 |
10,355.00 |
135.00 |
14,715.00 |
150.00 |
16,350.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| S-001 |
surface preparation
|
lump |
LUMP |
100,000.00 |
100,000.00 |
25,000.00 |
25,000.00 |
60,000.00 |
60,000.00 |
75,000.00 |
75,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,222,953.41 |
|
3,252,846.27 |
|
4,579,275.65 |
|
4,728,482.00 |
|