| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-02 |
temporary hay or straw bales
|
56   |
EACH |
20.00 |
1,120.00 |
30.00 |
1,680.00 |
10.00 |
560.00 |
|
|
| 204-06 |
temporary silt fencing
|
6,188   |
LNFT |
2.00 |
12,376.00 |
1.20 |
7,425.60 |
1.15 |
7,116.20 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,879   |
CUYD |
78.00 |
146,562.00 |
80.00 |
150,320.00 |
18.00 |
33,822.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
8,683.4 |
TON |
91.50 |
794,531.10 |
90.00 |
781,506.00 |
95.00 |
824,923.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,950.2 |
TON |
75.00 |
221,265.00 |
120.00 |
354,024.00 |
95.00 |
280,269.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
244   |
SQYD |
30.00 |
7,320.00 |
6.00 |
1,464.00 |
40.00 |
9,760.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 7   |
CUYD |
0.00 |
0.00 |
0.00 |
0.00 |
0.01 |
- 0.07 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
950   |
SQYD |
80.00 |
76,000.00 |
100.00 |
95,000.00 |
100.00 |
95,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
35,000.00 |
35,000.00 |
109,000.00 |
109,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.860 |
MILE |
400.00 |
2,344.00 |
500.00 |
2,930.00 |
600.00 |
3,516.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.180 |
MILE |
330.00 |
389.40 |
1.00 |
1.18 |
100.00 |
118.00 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
22.000 |
MILE |
660.00 |
14,520.00 |
1.00 |
22.00 |
100.00 |
2,200.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
36,000.00 |
36,000.00 |
105,000.00 |
105,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
55.00 |
550.00 |
60.00 |
600.00 |
60.00 |
600.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
90.00 |
360.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
783   |
EACH |
5.00 |
3,915.00 |
6.00 |
4,698.00 |
6.00 |
4,698.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
22.000 |
MILE |
2,750.00 |
60,500.00 |
3,000.00 |
66,000.00 |
2,900.00 |
63,800.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.180 |
MILE |
660.00 |
778.80 |
1,000.00 |
1,180.00 |
800.00 |
944.00 |
|
|
| 735-01 |
mailboxes
|
260   |
EACH |
1.00 |
260.00 |
2.00 |
520.00 |
5.00 |
1,300.00 |
|
|
| 735-02 |
mailbox supports (single)
|
203   |
EACH |
100.00 |
20,300.00 |
100.00 |
20,300.00 |
130.00 |
26,390.00 |
|
|
| 735-03 |
mailbox supports (double)
|
8   |
EACH |
150.00 |
1,200.00 |
150.00 |
1,200.00 |
165.00 |
1,320.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
13   |
EACH |
275.00 |
3,575.00 |
285.00 |
3,705.00 |
275.00 |
3,575.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
57,000.00 |
57,000.00 |
|
|
| S-001 |
saw cutting asphaltic concrete patches (12" deep)
|
2,150   |
LNFT |
6.00 |
12,900.00 |
5.00 |
10,750.00 |
6.00 |
12,900.00 |
|
|
| S-002 |
dynamic message sign unit
|
2   |
EACH |
2,000.00 |
4,000.00 |
8,000.00 |
16,000.00 |
10,000.00 |
20,000.00 |
|
|
| S-003 |
surface preparation
|
lump |
LUMP |
25,000.00 |
25,000.00 |
90,000.00 |
90,000.00 |
65,000.00 |
65,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,672,246.30 |
|
1,690,685.78 |
|
1,729,131.13 |
|
|
|