| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - H & S CONSTRUCTION CO., INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-B |
removal of concrete box culverts
|
2   |
EACH |
1,100.00 |
2,200.00 |
1,080.00 |
2,160.00 |
1,200.00 |
2,400.00 |
1,200.00 |
2,400.00 |
| 202-02-D |
removal of concrete walks & drives
|
104   |
SQYD |
9.00 |
936.00 |
6.48 |
673.92 |
6.50 |
676.00 |
10.00 |
1,040.00 |
| 202-02-E |
removal of concrete curbs
|
200.0 |
LNFT |
8.00 |
1,600.00 |
3.08 |
616.00 |
3.10 |
620.00 |
10.00 |
2,000.00 |
| 202-02-I |
removal of existing cross drain pipe (24" equiv. cmpa)
|
36.0 |
LNFT |
10.00 |
360.00 |
32.40 |
1,166.40 |
32.00 |
1,152.00 |
12.00 |
432.00 |
| 202-02-J |
removal of existing cross drain pipe (36" rcp)
|
29.0 |
LNFT |
10.00 |
290.00 |
36.72 |
1,064.88 |
35.00 |
1,015.00 |
12.00 |
348.00 |
| 202-02-K |
removal of existing inlet
|
2   |
EACH |
500.00 |
1,000.00 |
270.00 |
540.00 |
265.00 |
530.00 |
500.00 |
1,000.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
7,500.00 |
7,500.00 |
3,300.00 |
3,300.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
| 203-07 |
borrow (vehicular measurement)
|
652   |
CUYD |
10.00 |
6,520.00 |
12.00 |
7,824.00 |
24.00 |
15,648.00 |
12.00 |
7,824.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,550   |
CUYD |
10.00 |
15,500.00 |
11.00 |
17,050.00 |
24.00 |
37,200.00 |
10.00 |
15,500.00 |
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
10.00 |
280.00 |
17.00 |
476.00 |
6.50 |
182.00 |
20.00 |
560.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
38   |
EACH |
250.00 |
9,500.00 |
150.00 |
5,700.00 |
160.00 |
6,080.00 |
200.00 |
7,600.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
107,223   |
SQYD |
6.10 |
654,060.30 |
5.24 |
561,848.52 |
7.35 |
788,089.05 |
7.00 |
750,561.00 |
| 303-02 |
removal of existing patches
|
400   |
SQYD |
15.00 |
6,000.00 |
15.00 |
6,000.00 |
16.00 |
6,400.00 |
20.00 |
8,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,842   |
CUYD |
0.01 |
28.42 |
18.00 |
51,156.00 |
67.00 |
190,414.00 |
25.50 |
72,471.00 |
| 502-01 |
superpave asphaltic concrete
|
21,181.4 |
TON |
90.50 |
1,916,916.70 |
95.00 |
2,012,233.00 |
83.00 |
1,758,056.20 |
96.00 |
2,033,414.40 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,592.3 |
TON |
127.00 |
329,222.10 |
125.00 |
324,037.50 |
145.00 |
375,883.50 |
127.00 |
329,222.10 |
| 509-01 |
cold planing asphaltic pavement
|
94,479   |
SQYD |
1.38 |
130,381.02 |
1.15 |
108,650.85 |
1.75 |
165,338.25 |
1.60 |
151,166.40 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,470   |
CUYD |
0.01 |
- 44.70 |
0.01 |
- 44.70 |
0.10 |
- 447.00 |
0.01 |
- 44.70 |
| 510-01-C |
pavement patching (10" minimum thickness)
|
116   |
SQYD |
120.00 |
13,920.00 |
108.00 |
12,528.00 |
125.00 |
14,500.00 |
120.00 |
13,920.00 |
| 510-01-D |
pavement patching (15" minimum thickness)
|
250   |
SQYD |
160.00 |
40,000.00 |
140.00 |
35,000.00 |
135.00 |
33,750.00 |
165.00 |
41,250.00 |
| 701-01-M |
cross drain pipe (36" rcp)
|
96   |
LNFT |
104.00 |
9,984.00 |
233.28 |
22,394.88 |
220.00 |
21,120.00 |
120.00 |
11,520.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
40   |
LNFT |
76.00 |
3,040.00 |
352.08 |
14,083.20 |
330.00 |
13,200.00 |
85.00 |
3,400.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
32   |
LNFT |
106.00 |
3,392.00 |
408.24 |
13,063.68 |
385.00 |
12,320.00 |
120.00 |
3,840.00 |
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
60.00 |
480.00 |
402.84 |
3,222.72 |
385.00 |
3,080.00 |
70.00 |
560.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
81.00 |
648.00 |
459.00 |
3,672.00 |
450.00 |
3,600.00 |
90.00 |
720.00 |
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
8   |
LNFT |
99.00 |
792.00 |
496.80 |
3,974.40 |
500.00 |
4,000.00 |
110.00 |
880.00 |
| 701-15 |
concrete collar
|
4   |
EACH |
450.00 |
1,800.00 |
567.00 |
2,268.00 |
550.00 |
2,200.00 |
500.00 |
2,000.00 |
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
4,850.00 |
29,100.00 |
3,402.00 |
20,412.00 |
3,250.00 |
19,500.00 |
6,000.00 |
36,000.00 |
| 702-04-D |
adjusting water valves
|
9   |
EACH |
225.00 |
2,025.00 |
150.00 |
1,350.00 |
1,200.00 |
10,800.00 |
250.00 |
2,250.00 |
| 706-02-C |
concrete drive (6" thick)
|
60.0 |
SQYD |
57.00 |
3,420.00 |
88.56 |
5,313.60 |
85.00 |
5,100.00 |
70.00 |
4,200.00 |
| 707-01 |
concrete curb
|
200.0 |
LNFT |
12.50 |
2,500.00 |
38.88 |
7,776.00 |
38.00 |
7,600.00 |
15.00 |
3,000.00 |
| 712-02 |
sacked concrete revetment
|
20   |
SQYD |
69.00 |
1,380.00 |
70.20 |
1,404.00 |
68.00 |
1,360.00 |
80.00 |
1,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
| 713-02-B |
temporary pavement markings (6" width)
|
488   |
LNFT |
0.20 |
97.60 |
0.81 |
395.28 |
0.21 |
102.48 |
0.01 |
4.88 |
| 713-02-C |
temporary pavement markings (8" width)
|
824   |
LNFT |
0.30 |
247.20 |
0.92 |
758.08 |
0.32 |
263.68 |
0.01 |
8.24 |
| 713-02-E |
temporary pavement markings (24" width)
|
344   |
LNFT |
0.50 |
172.00 |
2.16 |
743.04 |
0.52 |
178.88 |
0.01 |
3.44 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.707 |
MILE |
400.00 |
5,882.80 |
450.00 |
6,618.15 |
150.00 |
2,206.05 |
400.00 |
5,882.80 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.266 |
MILE |
295.00 |
2,733.47 |
486.00 |
4,503.28 |
200.00 |
1,853.20 |
0.01 |
0.09 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
48.317 |
MILE |
410.00 |
19,809.97 |
799.20 |
38,614.95 |
200.00 |
9,663.40 |
0.01 |
0.48 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
22   |
EACH |
25.00 |
550.00 |
108.00 |
2,376.00 |
26.00 |
572.00 |
0.01 |
0.22 |
| 713-05-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
50.00 |
300.00 |
108.00 |
648.00 |
52.00 |
312.00 |
0.01 |
0.06 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,000.00 |
6,000.00 |
9,200.00 |
9,200.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
| 726-01 |
bedding material
|
50.0 |
CUYD |
87.00 |
4,350.00 |
35.00 |
1,750.00 |
34.00 |
1,700.00 |
100.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
83,000.00 |
83,000.00 |
100,000.00 |
100,000.00 |
132,500.00 |
132,500.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
27   |
EACH |
85.00 |
2,295.00 |
54.00 |
1,458.00 |
52.00 |
1,404.00 |
60.00 |
1,620.00 |
| 731-02 |
reflectorized raised pavement markers
|
979   |
EACH |
5.10 |
4,992.90 |
5.94 |
5,815.26 |
5.50 |
5,384.50 |
6.00 |
5,874.00 |
| 732-01-B |
plastic pavement striping (6" width)
|
244   |
LNFT |
0.70 |
170.80 |
0.97 |
236.68 |
0.75 |
183.00 |
1.00 |
244.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
412   |
LNFT |
0.90 |
370.80 |
1.46 |
601.52 |
0.95 |
391.40 |
1.00 |
412.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
172   |
LNFT |
3.50 |
602.00 |
4.86 |
835.92 |
3.75 |
645.00 |
5.00 |
860.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
24.158 |
MILE |
2,610.00 |
63,052.38 |
2,430.00 |
58,703.94 |
2,750.00 |
66,434.50 |
2,700.00 |
65,226.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.633 |
MILE |
690.00 |
3,196.77 |
864.00 |
4,002.91 |
700.00 |
3,243.10 |
800.00 |
3,706.40 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
190.00 |
2,090.00 |
210.60 |
2,316.60 |
200.00 |
2,200.00 |
250.00 |
2,750.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
200.00 |
600.00 |
210.60 |
631.80 |
230.00 |
690.00 |
250.00 |
750.00 |
| 732-05 |
removal of existing markings
|
0.019 |
MILE |
2,500.00 |
47.50 |
7,020.00 |
133.38 |
2,650.00 |
50.35 |
3,000.00 |
57.00 |
| 735-01 |
mailboxes
|
62   |
EACH |
1.00 |
62.00 |
1.08 |
66.96 |
1.00 |
62.00 |
2.00 |
124.00 |
| 735-02 |
mailbox supports (single)
|
69   |
EACH |
119.00 |
8,211.00 |
108.00 |
7,452.00 |
110.00 |
7,590.00 |
125.00 |
8,625.00 |
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
175.00 |
700.00 |
172.80 |
691.20 |
165.00 |
660.00 |
200.00 |
800.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
325.00 |
325.00 |
270.00 |
270.00 |
255.00 |
255.00 |
300.00 |
300.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
12,500.00 |
12,500.00 |
32,000.00 |
32,000.00 |
100.00 |
100.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
11.64 |
CUYD |
950.00 |
11,058.00 |
1,242.00 |
14,456.88 |
1,250.00 |
14,550.00 |
1,100.00 |
12,804.00 |
| 806-01 |
deformed reinforcing steel
|
662   |
LB |
2.25 |
1,489.50 |
3.00 |
1,986.00 |
1.05 |
695.10 |
2.50 |
1,655.00 |
| S-001 |
cement treatment (10" thick)
|
88,241   |
SQYD |
4.60 |
405,908.60 |
4.65 |
410,320.65 |
4.25 |
375,024.25 |
5.00 |
441,205.00 |
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
2,207   |
INFT |
1.75 |
3,862.25 |
1.24 |
2,736.68 |
2.50 |
5,517.50 |
2.50 |
5,517.50 |
| S-003 |
cleaning curb gutters
|
3,054   |
LNFT |
0.01 |
30.54 |
1.20 |
3,664.80 |
1.50 |
4,581.00 |
2.00 |
6,108.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,848,938.92 |
|
4,025,402.81 |
|
4,222,279.39 |
|
4,299,272.91 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
- 6 - M. MATT DURAND, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-B |
removal of concrete box culverts
|
2   |
EACH |
6,000.00 |
12,000.00 |
4,830.00 |
9,660.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
104   |
SQYD |
30.00 |
3,120.00 |
23.00 |
2,392.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
200.0 |
LNFT |
18.00 |
3,600.00 |
6.00 |
1,200.00 |
|
|
|
|
| 202-02-I |
removal of existing cross drain pipe (24" equiv. cmpa)
|
36.0 |
LNFT |
35.00 |
1,260.00 |
43.00 |
1,548.00 |
|
|
|
|
| 202-02-J |
removal of existing cross drain pipe (36" rcp)
|
29.0 |
LNFT |
35.00 |
1,015.00 |
43.00 |
1,247.00 |
|
|
|
|
| 202-02-K |
removal of existing inlet
|
2   |
EACH |
800.00 |
1,600.00 |
500.00 |
1,000.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
652   |
CUYD |
28.00 |
18,256.00 |
23.00 |
14,996.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,550   |
CUYD |
28.00 |
43,400.00 |
24.00 |
37,200.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
25.00 |
700.00 |
60.00 |
1,680.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
38   |
EACH |
235.00 |
8,930.00 |
250.00 |
9,500.00 |
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
107,223   |
SQYD |
7.00 |
750,561.00 |
7.80 |
836,339.40 |
|
|
|
|
| 303-02 |
removal of existing patches
|
400   |
SQYD |
5.00 |
2,000.00 |
18.00 |
7,200.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,842   |
CUYD |
50.00 |
142,100.00 |
40.00 |
113,680.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
21,181.4 |
TON |
90.00 |
1,906,326.00 |
104.00 |
2,202,865.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,592.3 |
TON |
145.00 |
375,883.50 |
130.00 |
336,999.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
94,479   |
SQYD |
1.50 |
141,718.50 |
2.00 |
188,958.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,470   |
CUYD |
0.80 |
- 3,576.00 |
0.50 |
- 2,235.00 |
|
|
|
|
| 510-01-C |
pavement patching (10" minimum thickness)
|
116   |
SQYD |
125.00 |
14,500.00 |
94.00 |
10,904.00 |
|
|
|
|
| 510-01-D |
pavement patching (15" minimum thickness)
|
250   |
SQYD |
135.00 |
33,750.00 |
142.50 |
35,625.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp)
|
96   |
LNFT |
155.00 |
14,880.00 |
167.00 |
16,032.00 |
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
40   |
LNFT |
140.00 |
5,600.00 |
154.00 |
6,160.00 |
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
32   |
LNFT |
175.00 |
5,600.00 |
185.00 |
5,920.00 |
|
|
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
200.00 |
1,600.00 |
184.00 |
1,472.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
225.00 |
1,800.00 |
198.00 |
1,584.00 |
|
|
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
8   |
LNFT |
270.00 |
2,160.00 |
240.00 |
1,920.00 |
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
1,200.00 |
4,800.00 |
1,100.00 |
4,400.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
6   |
EACH |
3,800.00 |
22,800.00 |
3,600.00 |
21,600.00 |
|
|
|
|
| 702-04-D |
adjusting water valves
|
9   |
EACH |
300.00 |
2,700.00 |
227.00 |
2,043.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
60.0 |
SQYD |
92.00 |
5,520.00 |
92.00 |
5,520.00 |
|
|
|
|
| 707-01 |
concrete curb
|
200.0 |
LNFT |
50.00 |
10,000.00 |
30.00 |
6,000.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
20   |
SQYD |
78.00 |
1,560.00 |
120.00 |
2,400.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| 713-02-B |
temporary pavement markings (6" width)
|
488   |
LNFT |
0.25 |
122.00 |
0.24 |
117.12 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
824   |
LNFT |
0.35 |
288.40 |
0.36 |
296.64 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
344   |
LNFT |
0.55 |
189.20 |
0.60 |
206.40 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.707 |
MILE |
350.00 |
5,147.45 |
601.00 |
8,838.91 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
9.266 |
MILE |
350.00 |
3,243.10 |
355.00 |
3,289.43 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
48.317 |
MILE |
200.00 |
9,663.40 |
493.00 |
23,820.28 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
22   |
EACH |
30.00 |
660.00 |
30.00 |
660.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
50.00 |
300.00 |
60.00 |
360.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
12,000.00 |
12,000.00 |
16,000.00 |
16,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
50.0 |
CUYD |
100.00 |
5,000.00 |
98.00 |
4,900.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
375,000.00 |
375,000.00 |
155,000.00 |
155,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
27   |
EACH |
58.00 |
1,566.00 |
59.00 |
1,593.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
979   |
EACH |
5.90 |
5,776.10 |
6.25 |
6,118.75 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
244   |
LNFT |
0.85 |
207.40 |
1.00 |
244.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
412   |
LNFT |
1.00 |
412.00 |
1.10 |
453.20 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
172   |
LNFT |
4.00 |
688.00 |
4.20 |
722.40 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
24.158 |
MILE |
3,000.00 |
72,474.00 |
3,200.00 |
77,305.60 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.633 |
MILE |
750.00 |
3,474.75 |
850.00 |
3,938.05 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
200.00 |
2,200.00 |
229.00 |
2,519.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
250.00 |
750.00 |
265.00 |
795.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.019 |
MILE |
3,000.00 |
57.00 |
3,200.00 |
60.80 |
|
|
|
|
| 735-01 |
mailboxes
|
62   |
EACH |
10.00 |
620.00 |
15.00 |
930.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
69   |
EACH |
115.00 |
7,935.00 |
120.00 |
8,280.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
185.00 |
740.00 |
240.00 |
960.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
285.00 |
285.00 |
300.00 |
300.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
11.64 |
CUYD |
2,000.00 |
23,280.00 |
1,000.00 |
11,640.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
662   |
LB |
1.00 |
662.00 |
3.60 |
2,383.20 |
|
|
|
|
| S-001 |
cement treatment (10" thick)
|
88,241   |
SQYD |
4.00 |
352,964.00 |
6.20 |
547,094.20 |
|
|
|
|
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
2,207   |
INFT |
1.25 |
2,758.75 |
1.20 |
2,648.40 |
|
|
|
|
| S-003 |
cleaning curb gutters
|
3,054   |
LNFT |
4.00 |
12,216.00 |
1.50 |
4,581.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,496,843.55 |
|
4,976,865.38 |
|
|
|
|
|