Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 210-01-0011
Parish: ACADIA
Routes: LA 91
Description: EGAN JCT. LOCAL RD. - N. JCT. LA 98
Type Const: cold planing asphaltic concrete, pavement patching, subgrade treatment, in-place
cement stabilized base course, superpave asphaltic concrete overlay, and related work.
Estimated Construction Cost: $6,342,920.05
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $3,848,938.92
2 04089 H & S CONSTRUCTION CO., INC. $4,025,402.81
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $4,222,279.39
4 34356 PRAIRIE CONTRACTORS INC. $4,299,272.91
5 12312 GILCHRIST CONSTRUCTION CO. LLC $4,496,843.55
6 13086 M. MATT DURAND, LLC $4,976,865.38
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
H & S CONSTRUCTION CO., INC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
PRAIRIE CONTRACTORS INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-B removal of concrete box culverts 2      EACH 1,100.00 2,200.00 1,080.00 2,160.00 1,200.00 2,400.00 1,200.00 2,400.00
202-02-D removal of concrete walks & drives 104      SQYD 9.00 936.00 6.48 673.92 6.50 676.00 10.00 1,040.00
202-02-E removal of concrete curbs 200.0    LNFT 8.00 1,600.00 3.08 616.00 3.10 620.00 10.00 2,000.00
202-02-I removal of existing cross drain pipe (24" equiv. cmpa) 36.0    LNFT 10.00 360.00 32.40 1,166.40 32.00 1,152.00 12.00 432.00
202-02-J removal of existing cross drain pipe (36" rcp) 29.0    LNFT 10.00 290.00 36.72 1,064.88 35.00 1,015.00 12.00 348.00
202-02-K removal of existing inlet 2      EACH 500.00 1,000.00 270.00 540.00 265.00 530.00 500.00 1,000.00
203-05 excavation and embankment lump      LUMP 7,500.00 7,500.00 3,300.00 3,300.00 20,000.00 20,000.00 15,000.00 15,000.00
203-07 borrow (vehicular measurement) 652      CUYD 10.00 6,520.00 12.00 7,824.00 24.00 15,648.00 12.00 7,824.00
203-07-A borrow (vehicular meas.)(selected soils) 1,550      CUYD 10.00 15,500.00 11.00 17,050.00 24.00 37,200.00 10.00 15,500.00
204-02 temporary hay or straw bales 28      EACH 10.00 280.00 17.00 476.00 6.50 182.00 20.00 560.00
204-05-A temporary sediment check dams (hay) 38      EACH 250.00 9,500.00 150.00 5,700.00 160.00 6,080.00 200.00 7,600.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 107,223      SQYD 6.10 654,060.30 5.24 561,848.52 7.35 788,089.05 7.00 750,561.00
303-02 removal of existing patches 400      SQYD 15.00 6,000.00 15.00 6,000.00 16.00 6,400.00 20.00 8,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,842      CUYD 0.01 28.42 18.00 51,156.00 67.00 190,414.00 25.50 72,471.00
502-01 superpave asphaltic concrete 21,181.4    TON 90.50 1,916,916.70 95.00 2,012,233.00 83.00 1,758,056.20 96.00 2,033,414.40
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,592.3    TON 127.00 329,222.10 125.00 324,037.50 145.00 375,883.50 127.00 329,222.10
509-01 cold planing asphaltic pavement 94,479      SQYD 1.38 130,381.02 1.15 108,650.85 1.75 165,338.25 1.60 151,166.40
509-02 contractor retained reclaimed asphaltic pavement - 4,470      CUYD 0.01 - 44.70 0.01 - 44.70 0.10 - 447.00 0.01 - 44.70
510-01-C pavement patching (10" minimum thickness) 116      SQYD 120.00 13,920.00 108.00 12,528.00 125.00 14,500.00 120.00 13,920.00
510-01-D pavement patching (15" minimum thickness) 250      SQYD 160.00 40,000.00 140.00 35,000.00 135.00 33,750.00 165.00 41,250.00
701-01-M cross drain pipe (36" rcp) 96      LNFT 104.00 9,984.00 233.28 22,394.88 220.00 21,120.00 120.00 11,520.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 40      LNFT 76.00 3,040.00 352.08 14,083.20 330.00 13,200.00 85.00 3,400.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 32      LNFT 106.00 3,392.00 408.24 13,063.68 385.00 12,320.00 120.00 3,840.00
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 60.00 480.00 402.84 3,222.72 385.00 3,080.00 70.00 560.00
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 81.00 648.00 459.00 3,672.00 450.00 3,600.00 90.00 720.00
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 99.00 792.00 496.80 3,974.40 500.00 4,000.00 110.00 880.00
701-15 concrete collar 4      EACH 450.00 1,800.00 567.00 2,268.00 550.00 2,200.00 500.00 2,000.00
702-03-C catch basins (cb-06) 6      EACH 4,850.00 29,100.00 3,402.00 20,412.00 3,250.00 19,500.00 6,000.00 36,000.00
702-04-D adjusting water valves 9      EACH 225.00 2,025.00 150.00 1,350.00 1,200.00 10,800.00 250.00 2,250.00
706-02-C concrete drive (6" thick) 60.0    SQYD 57.00 3,420.00 88.56 5,313.60 85.00 5,100.00 70.00 4,200.00
707-01 concrete curb 200.0    LNFT 12.50 2,500.00 38.88 7,776.00 38.00 7,600.00 15.00 3,000.00
712-02 sacked concrete revetment 20      SQYD 69.00 1,380.00 70.20 1,404.00 68.00 1,360.00 80.00 1,600.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 80,000.00 80,000.00 20,000.00 20,000.00 100,000.00 100,000.00
713-02-B temporary pavement markings (6" width) 488      LNFT 0.20 97.60 0.81 395.28 0.21 102.48 0.01 4.88
713-02-C temporary pavement markings (8" width) 824      LNFT 0.30 247.20 0.92 758.08 0.32 263.68 0.01 8.24
713-02-E temporary pavement markings (24" width) 344      LNFT 0.50 172.00 2.16 743.04 0.52 178.88 0.01 3.44
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.707  MILE 400.00 5,882.80 450.00 6,618.15 150.00 2,206.05 400.00 5,882.80
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
9.266  MILE 295.00 2,733.47 486.00 4,503.28 200.00 1,853.20 0.01 0.09
713-04-A temporary pavement markings (solid line)(4" width) 48.317  MILE 410.00 19,809.97 799.20 38,614.95 200.00 9,663.40 0.01 0.48
713-05-A temporary pavement legends and symbols (arrow) 22      EACH 25.00 550.00 108.00 2,376.00 26.00 572.00 0.01 0.22
713-05-C temporary pavement legends and symbols (only) 6      EACH 50.00 300.00 108.00 648.00 52.00 312.00 0.01 0.06
722-02 project site laboratory (equipped) 1      EACH 6,000.00 6,000.00 9,200.00 9,200.00 10,000.00 10,000.00 6,000.00 6,000.00
726-01 bedding material 50.0    CUYD 87.00 4,350.00 35.00 1,750.00 34.00 1,700.00 100.00 5,000.00
727-01 mobilization lump      LUMP 83,000.00 83,000.00 100,000.00 100,000.00 132,500.00 132,500.00 100,000.00 100,000.00
729-16-B object marker assembly (type 2) 27      EACH 85.00 2,295.00 54.00 1,458.00 52.00 1,404.00 60.00 1,620.00
731-02 reflectorized raised pavement markers 979      EACH 5.10 4,992.90 5.94 5,815.26 5.50 5,384.50 6.00 5,874.00
732-01-B plastic pavement striping (6" width) 244      LNFT 0.70 170.80 0.97 236.68 0.75 183.00 1.00 244.00
732-01-C plastic pavement striping (8" width) 412      LNFT 0.90 370.80 1.46 601.52 0.95 391.40 1.00 412.00
732-01-E plastic pavement striping (24" width) 172      LNFT 3.50 602.00 4.86 835.92 3.75 645.00 5.00 860.00
732-02-A plastic pavement striping (solid line) (4" width) 24.158  MILE 2,610.00 63,052.38 2,430.00 58,703.94 2,750.00 66,434.50 2,700.00 65,226.60
732-03-A plastic pavement striping (broken line)(4" width) 4.633  MILE 690.00 3,196.77 864.00 4,002.91 700.00 3,243.10 800.00 3,706.40
732-04-A plastic pavement legends & symbols (arrow) 11      EACH 190.00 2,090.00 210.60 2,316.60 200.00 2,200.00 250.00 2,750.00
732-04-C plastic pavement legends & symbols (only) 3      EACH 200.00 600.00 210.60 631.80 230.00 690.00 250.00 750.00
732-05 removal of existing markings 0.019  MILE 2,500.00 47.50 7,020.00 133.38 2,650.00 50.35 3,000.00 57.00
735-01 mailboxes 62      EACH 1.00 62.00 1.08 66.96 1.00 62.00 2.00 124.00
735-02 mailbox supports (single) 69      EACH 119.00 8,211.00 108.00 7,452.00 110.00 7,590.00 125.00 8,625.00
735-03 mailbox supports (double) 4      EACH 175.00 700.00 172.80 691.20 165.00 660.00 200.00 800.00
735-04 mailbox supports (multiple) 1      EACH 325.00 325.00 270.00 270.00 255.00 255.00 300.00 300.00
740-01 construction layout lump      LUMP 12,000.00 12,000.00 12,500.00 12,500.00 32,000.00 32,000.00 100.00 100.00
805-01-A class a concrete (pipe headwalls) 11.64   CUYD 950.00 11,058.00 1,242.00 14,456.88 1,250.00 14,550.00 1,100.00 12,804.00
806-01 deformed reinforcing steel 662      LB 2.25 1,489.50 3.00 1,986.00 1.05 695.10 2.50 1,655.00
S-001 cement treatment (10" thick) 88,241      SQYD 4.60 405,908.60 4.65 410,320.65 4.25 375,024.25 5.00 441,205.00
S-002 full depth sawcutting of existing portland cement
concrete drives
2,207      INFT 1.75 3,862.25 1.24 2,736.68 2.50 5,517.50 2.50 5,517.50
S-003 cleaning curb gutters 3,054      LNFT 0.01 30.54 1.20 3,664.80 1.50 4,581.00 2.00 6,108.00
                       
 CONTRACTOR TOTAL       3,848,938.92   4,025,402.81   4,222,279.39   4,299,272.91
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC
- 6 -
M. MATT DURAND, LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-B removal of concrete box culverts 2      EACH 6,000.00 12,000.00 4,830.00 9,660.00        
202-02-D removal of concrete walks & drives 104      SQYD 30.00 3,120.00 23.00 2,392.00        
202-02-E removal of concrete curbs 200.0    LNFT 18.00 3,600.00 6.00 1,200.00        
202-02-I removal of existing cross drain pipe (24" equiv. cmpa) 36.0    LNFT 35.00 1,260.00 43.00 1,548.00        
202-02-J removal of existing cross drain pipe (36" rcp) 29.0    LNFT 35.00 1,015.00 43.00 1,247.00        
202-02-K removal of existing inlet 2      EACH 800.00 1,600.00 500.00 1,000.00        
203-05 excavation and embankment lump      LUMP 15,000.00 15,000.00 65,000.00 65,000.00        
203-07 borrow (vehicular measurement) 652      CUYD 28.00 18,256.00 23.00 14,996.00        
203-07-A borrow (vehicular meas.)(selected soils) 1,550      CUYD 28.00 43,400.00 24.00 37,200.00        
204-02 temporary hay or straw bales 28      EACH 25.00 700.00 60.00 1,680.00        
204-05-A temporary sediment check dams (hay) 38      EACH 235.00 8,930.00 250.00 9,500.00        
303-01-B in-place cement stabilized base course (8 1/2" thick) 107,223      SQYD 7.00 750,561.00 7.80 836,339.40        
303-02 removal of existing patches 400      SQYD 5.00 2,000.00 18.00 7,200.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
2,842      CUYD 50.00 142,100.00 40.00 113,680.00        
502-01 superpave asphaltic concrete 21,181.4    TON 90.00 1,906,326.00 104.00 2,202,865.60        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,592.3    TON 145.00 375,883.50 130.00 336,999.00        
509-01 cold planing asphaltic pavement 94,479      SQYD 1.50 141,718.50 2.00 188,958.00        
509-02 contractor retained reclaimed asphaltic pavement - 4,470      CUYD 0.80 - 3,576.00 0.50 - 2,235.00        
510-01-C pavement patching (10" minimum thickness) 116      SQYD 125.00 14,500.00 94.00 10,904.00        
510-01-D pavement patching (15" minimum thickness) 250      SQYD 135.00 33,750.00 142.50 35,625.00        
701-01-M cross drain pipe (36" rcp) 96      LNFT 155.00 14,880.00 167.00 16,032.00        
701-02-D cross drain pipe arch (24" equiv. rcpa) 40      LNFT 140.00 5,600.00 154.00 6,160.00        
701-02-F cross drain pipe arch (36" equiv. rcpa) 32      LNFT 175.00 5,600.00 185.00 5,920.00        
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 200.00 1,600.00 184.00 1,472.00        
701-10-I reinforced concrete pipe (extension)(24") 8      LNFT 225.00 1,800.00 198.00 1,584.00        
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 270.00 2,160.00 240.00 1,920.00        
701-15 concrete collar 4      EACH 1,200.00 4,800.00 1,100.00 4,400.00        
702-03-C catch basins (cb-06) 6      EACH 3,800.00 22,800.00 3,600.00 21,600.00        
702-04-D adjusting water valves 9      EACH 300.00 2,700.00 227.00 2,043.00        
706-02-C concrete drive (6" thick) 60.0    SQYD 92.00 5,520.00 92.00 5,520.00        
707-01 concrete curb 200.0    LNFT 50.00 10,000.00 30.00 6,000.00        
712-02 sacked concrete revetment 20      SQYD 78.00 1,560.00 120.00 2,400.00        
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 85,000.00 85,000.00        
713-02-B temporary pavement markings (6" width) 488      LNFT 0.25 122.00 0.24 117.12        
713-02-C temporary pavement markings (8" width) 824      LNFT 0.35 288.40 0.36 296.64        
713-02-E temporary pavement markings (24" width) 344      LNFT 0.55 189.20 0.60 206.40        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
14.707  MILE 350.00 5,147.45 601.00 8,838.91        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
9.266  MILE 350.00 3,243.10 355.00 3,289.43        
713-04-A temporary pavement markings (solid line)(4" width) 48.317  MILE 200.00 9,663.40 493.00 23,820.28        
713-05-A temporary pavement legends and symbols (arrow) 22      EACH 30.00 660.00 30.00 660.00        
713-05-C temporary pavement legends and symbols (only) 6      EACH 50.00 300.00 60.00 360.00        
722-02 project site laboratory (equipped) 1      EACH 12,000.00 12,000.00 16,000.00 16,000.00        
726-01 bedding material 50.0    CUYD 100.00 5,000.00 98.00 4,900.00        
727-01 mobilization lump      LUMP 375,000.00 375,000.00 155,000.00 155,000.00        
729-16-B object marker assembly (type 2) 27      EACH 58.00 1,566.00 59.00 1,593.00        
731-02 reflectorized raised pavement markers 979      EACH 5.90 5,776.10 6.25 6,118.75        
732-01-B plastic pavement striping (6" width) 244      LNFT 0.85 207.40 1.00 244.00        
732-01-C plastic pavement striping (8" width) 412      LNFT 1.00 412.00 1.10 453.20        
732-01-E plastic pavement striping (24" width) 172      LNFT 4.00 688.00 4.20 722.40        
732-02-A plastic pavement striping (solid line) (4" width) 24.158  MILE 3,000.00 72,474.00 3,200.00 77,305.60        
732-03-A plastic pavement striping (broken line)(4" width) 4.633  MILE 750.00 3,474.75 850.00 3,938.05        
732-04-A plastic pavement legends & symbols (arrow) 11      EACH 200.00 2,200.00 229.00 2,519.00        
732-04-C plastic pavement legends & symbols (only) 3      EACH 250.00 750.00 265.00 795.00        
732-05 removal of existing markings 0.019  MILE 3,000.00 57.00 3,200.00 60.80        
735-01 mailboxes 62      EACH 10.00 620.00 15.00 930.00        
735-02 mailbox supports (single) 69      EACH 115.00 7,935.00 120.00 8,280.00        
735-03 mailbox supports (double) 4      EACH 185.00 740.00 240.00 960.00        
735-04 mailbox supports (multiple) 1      EACH 285.00 285.00 300.00 300.00        
740-01 construction layout lump      LUMP 25,000.00 25,000.00 55,000.00 55,000.00        
805-01-A class a concrete (pipe headwalls) 11.64   CUYD 2,000.00 23,280.00 1,000.00 11,640.00        
806-01 deformed reinforcing steel 662      LB 1.00 662.00 3.60 2,383.20        
S-001 cement treatment (10" thick) 88,241      SQYD 4.00 352,964.00 6.20 547,094.20        
S-002 full depth sawcutting of existing portland cement
concrete drives
2,207      INFT 1.25 2,758.75 1.20 2,648.40        
S-003 cleaning curb gutters 3,054      LNFT 4.00 12,216.00 1.50 4,581.00        
                       
 CONTRACTOR TOTAL       4,496,843.55   4,976,865.38        