Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 208-02-0014
Parish: ST LANDRY
Routes: LA 357
Description: 3.59 MILES SOUTH OF JCT US 190 - JCT US 190
Type Const: grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete overlay, and related work.
Estimated Construction Cost: $2,381,718.52
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $1,697,379.97
2 04089 H & S CONSTRUCTION CO., INC. $1,789,253.28
3 12312 GILCHRIST CONSTRUCTION CO. LLC $1,837,906.37
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,918,459.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
H & S CONSTRUCTION CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
401-02 aggregate surface course (adjusted vehicular
measurement)
2,258      CUYD 25.00 56,450.00 47.00 106,126.00 52.00 117,416.00 18.00 40,644.00
502-01 superpave asphaltic concrete 9,172.5    TON 91.00 834,697.50 95.00 871,387.50 95.00 871,387.50 97.00 889,732.50
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,847.6    TON 130.00 240,188.00 125.00 230,950.00 135.00 249,426.00 150.00 277,140.00
507-01-A asphaltic material (crs-2p emulsion) 32,616      GAL 4.00 130,464.00 4.03 131,442.48 4.15 135,356.40 3.76 122,636.16
507-02-B aggregate (s2) 47,965      SQYD 1.25 59,956.25 1.59 76,264.35 1.40 67,151.00 1.30 62,354.50
507-02-C aggregate (s3) 47,965      SQYD 1.25 59,956.25 1.39 66,671.35 1.25 59,956.25 1.20 57,558.00
509-01 cold planing asphaltic pavement 47,965      SQYD 1.70 81,540.50 1.25 59,956.25 1.40 67,151.00 1.75 83,938.75
509-02 contractor retained reclaimed asphaltic pavement - 2,130      CUYD 0.01 - 21.30 0.01 - 21.30 1.00 - 2,130.00 0.10 - 213.00
510-01-B pavement patching (12" minimum thickness) 1,000      SQYD 125.00 125,000.00 115.00 115,000.00 112.00 112,000.00 100.00 100,000.00
702-04-D adjusting water valves 5      EACH 200.00 1,000.00 115.00 575.00 300.00 1,500.00 1,550.00 7,750.00
706-02-C concrete drive (6" thick) 20.0    SQYD 110.00 2,200.00 153.00 3,060.00 140.00 2,800.00 92.00 1,840.00
712-02 sacked concrete revetment 10      SQYD 150.00 1,500.00 235.00 2,350.00 100.00 1,000.00 115.00 1,150.00
713-01 temporary signs & barricades lump      LUMP 13,000.00 13,000.00 30,000.00 30,000.00 10,000.00 10,000.00 15,900.00 15,900.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.174  MILE 2,400.00 17,217.60 485.00 3,479.39 400.00 2,869.60 160.00 1,147.84
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
5.567  MILE 0.01 0.06 348.00 1,937.32 400.00 2,226.80 300.00 1,670.10
713-04-A temporary pavement markings (solid line)(4" width) 21.006  MILE 0.01 0.21 500.00 10,503.00 200.00 4,201.20 300.00 6,301.80
713-06-A temporary reflectorized raised pavement markers (tabs) 948      EACH 2.50 2,370.00 1.77 1,677.96 1.50 1,422.00 2.25 2,133.00
727-01 mobilization lump      LUMP 30,000.00 30,000.00 25,000.00 25,000.00 80,000.00 80,000.00 190,000.00 190,000.00
729-16-B object marker assembly (type 2) 16      EACH 60.00 960.00 59.00 944.00 55.00 880.00 60.00 960.00
731-02 reflectorized raised pavement markers 475      EACH 5.00 2,375.00 6.00 2,850.00 5.50 2,612.50 5.00 2,375.00
732-02-A plastic pavement striping (solid line) (4" width) 10.503  MILE 2,600.00 27,307.80 3,169.00 33,284.01 3,000.00 31,509.00 2,650.00 27,832.95
732-03-A plastic pavement striping (broken line)(4" width) 2.783  MILE 700.00 1,948.10 677.00 1,884.09 640.00 1,781.12 650.00 1,808.95
735-01 mailboxes 66      EACH 5.00 330.00 1.18 77.88 10.00 660.00 1.05 69.30
735-02 mailbox supports (single) 74      EACH 110.00 8,140.00 118.00 8,732.00 110.00 8,140.00 110.00 8,140.00
735-03 mailbox supports (double) 2      EACH 200.00 400.00 178.00 356.00 170.00 340.00 170.00 340.00
735-04 mailbox supports (multiple) 1      EACH 300.00 300.00 266.00 266.00 250.00 250.00 250.00 250.00
740-01 construction layout lump      LUMP 100.00 100.00 4,500.00 4,500.00 8,000.00 8,000.00 15,000.00 15,000.00
                       
 CONTRACTOR TOTAL       1,697,379.97   1,789,253.28   1,837,906.37   1,918,459.85