Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 152-02-0010
Parish: LASALLE
Routes: LA 8
Description: US 84 - MANIFEST
Type Const: grading, drainage structures, cold planing ashpaltic concrete, pavement patching,
asphaltic surface treatment, ultra-thin hmac wearing system and related work.
Estimated Construction Cost: $2,265,111.75
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $1,732,325.15
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,990,990.00
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,032,490.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 15,000.00 15,000.00 8,500.00 8,500.00 20,000.00 20,000.00    
202-02-H removal of guard rail 1,177      LNFT 8.00 9,416.00 9.00 10,593.00 15.00 17,655.00    
203-07 borrow (vehicular measurement) 938      CUYD 25.00 23,450.00 28.00 26,264.00 16.00 15,008.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
1,900      CUYD 30.00 57,000.00 95.00 180,500.00 85.00 161,500.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
423.6    TON 150.00 63,540.00 142.00 60,151.20 200.00 84,720.00    
507-01-A asphaltic material (crs-2p emulsion) 44,851      GAL 4.05 181,646.55 4.25 190,616.75 3.50 156,978.50    
507-02-B aggregate (s2) 109,393      SQYD 1.15 125,801.95 1.15 125,801.95 1.30 142,210.90    
509-01 cold planing asphaltic pavement 1,419      SQYD 7.00 9,933.00 19.00 26,961.00 15.00 21,285.00    
509-02 contractor retained reclaimed asphaltic pavement - 21      CUYD 0.10 - 2.10 0.10 - 2.10 1.00 - 21.00    
510-01-C pavement patching (14" minimum thickness) 648      SQYD 145.00 93,960.00 95.00 61,560.00 185.00 119,880.00    
701-05-K side drain pipe (30") 220      LNFT 85.00 18,700.00 135.00 29,700.00 75.00 16,500.00    
701-15 concrete collar 1      EACH 600.00 600.00 450.00 450.00 1,500.00 1,500.00    
704-03 blocked out guard rail 387.5    LNFT 23.00 8,912.50 24.00 9,300.00 23.00 8,912.50    
704-08-B guard rail transitions (double thrie beam) 300.0    LNFT 58.00 17,400.00 60.00 18,000.00 66.00 19,800.00    
704-10 guard rail anchor block 12      EACH 1,200.00 14,400.00 1,250.00 15,000.00 280.00 3,360.00    
704-11-B guard rail end treatment (tangent) 12      EACH 2,500.00 30,000.00 2,500.00 30,000.00 2,800.00 33,600.00    
707-01 concrete curb 8.0    LNFT 35.00 280.00 17.00 136.00 32.00 256.00    
707-04 asphaltic curb 217.0    LNFT 50.00 10,850.00 4.00 868.00 18.00 3,906.00    
711-01-C riprap (30 lb, 15" thick) 24      SQYD 85.00 2,040.00 135.00 3,240.00 100.00 2,400.00    
711-01-D riprap (55 lb, 18" thick) 24      SQYD 100.00 2,400.00 210.00 5,040.00 110.00 2,640.00    
711-04 geotextile fabric 74      SQYD 3.00 222.00 2.25 166.50 4.00 296.00    
712-01-A concrete cast-in-place revetment (4" thick) 58      SQYD 75.00 4,350.00 80.00 4,640.00 170.00 9,860.00    
713-01 temporary signs & barricades lump      LUMP 17,000.00 17,000.00 15,711.00 15,711.00 13,000.00 13,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
15.320  MILE 225.00 3,447.00 150.00 2,298.00 400.00 6,128.00    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
11.478  MILE 150.00 1,721.70 300.00 3,443.40 100.00 1,147.80    
713-04-A temporary pavement markings (solid line)(4" width) 44.600  MILE 1.00 44.60 300.00 13,380.00 100.00 4,460.00    
713-06-A temporary reflectorized raised pavement markers (tabs) 2,001      EACH 1.50 3,001.50 2.25 4,502.25 1.50 3,001.50    
716-01 mulch 0.5    TON 1,600.00 800.00 1,600.00 800.00 1,700.00 850.00    
717-01 seeding 14      LB 22.00 308.00 21.00 294.00 22.00 308.00    
718-01 fertilizer 320      LB 2.00 640.00 2.20 704.00 2.30 736.00    
720-01-B erosion control system, slope protection (type b) 320      SQYD 3.00 960.00 2.20 704.00 2.30 736.00    
726-01 bedding material 92.0    CUYD 100.00 9,200.00 135.00 12,420.00 86.00 7,912.00    
727-01 mobilization lump      LUMP 65,000.00 65,000.00 190,000.00 190,000.00 120,000.00 120,000.00    
729-16-C object marker assembly (type 3) 24      EACH 100.00 2,400.00 80.00 1,920.00 90.00 2,160.00    
731-02 reflectorized raised pavement markers 1,013      EACH 6.00 6,078.00 5.00 5,065.00 5.50 5,571.50    
732-02-A plastic pavement striping (solid line) (4" width) 22.298  MILE 2,400.00 53,515.20 2,600.00 57,974.80 2,500.00 55,745.00    
732-03-A plastic pavement striping (broken line)(4" width) 5.739  MILE 1,000.00 5,739.00 650.00 3,730.35 900.00 5,165.10    
732-05 removal of existing markings 7.660  MILE 3,600.00 27,576.00 4,500.00 34,470.00 6,200.00 47,492.00    
735-01 mailboxes 46      EACH 5.00 230.00 1.10 50.60 10.00 460.00    
735-02 mailbox supports (single) 29      EACH 125.00 3,625.00 115.00 3,335.00 125.00 3,625.00    
735-03 mailbox supports (double) 5      EACH 200.00 1,000.00 165.00 825.00 170.00 850.00    
735-04 mailbox supports (multiple) 2      EACH 350.00 700.00 325.00 650.00 340.00 680.00    
740-01 construction layout lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00 8,000.00 8,000.00    
S-001 ultra-thin hmac wearing course system (3/4" thick) 109,393      SQYD 7.25 793,099.25 7.10 776,690.30 8.00 875,144.00    
S-002 grinding isolated bumps lump      LUMP 25,000.00 25,000.00 35,000.00 35,000.00 18,000.00 18,000.00    
S-003 sawcuts for pavement patching 756      LNFT 15.00 11,340.00 6.00 4,536.00 12.00 9,072.00    
                       
 CONTRACTOR TOTAL       1,732,325.15   1,990,990.00   2,032,490.80    