| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
15,000.00 |
15,000.00 |
8,500.00 |
8,500.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
1,177   |
LNFT |
8.00 |
9,416.00 |
9.00 |
10,593.00 |
15.00 |
17,655.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
938   |
CUYD |
25.00 |
23,450.00 |
28.00 |
26,264.00 |
16.00 |
15,008.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,900   |
CUYD |
30.00 |
57,000.00 |
95.00 |
180,500.00 |
85.00 |
161,500.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
423.6 |
TON |
150.00 |
63,540.00 |
142.00 |
60,151.20 |
200.00 |
84,720.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
44,851   |
GAL |
4.05 |
181,646.55 |
4.25 |
190,616.75 |
3.50 |
156,978.50 |
|
|
| 507-02-B |
aggregate (s2)
|
109,393   |
SQYD |
1.15 |
125,801.95 |
1.15 |
125,801.95 |
1.30 |
142,210.90 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,419   |
SQYD |
7.00 |
9,933.00 |
19.00 |
26,961.00 |
15.00 |
21,285.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 21   |
CUYD |
0.10 |
- 2.10 |
0.10 |
- 2.10 |
1.00 |
- 21.00 |
|
|
| 510-01-C |
pavement patching (14" minimum thickness)
|
648   |
SQYD |
145.00 |
93,960.00 |
95.00 |
61,560.00 |
185.00 |
119,880.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
220   |
LNFT |
85.00 |
18,700.00 |
135.00 |
29,700.00 |
75.00 |
16,500.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
600.00 |
600.00 |
450.00 |
450.00 |
1,500.00 |
1,500.00 |
|
|
| 704-03 |
blocked out guard rail
|
387.5 |
LNFT |
23.00 |
8,912.50 |
24.00 |
9,300.00 |
23.00 |
8,912.50 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
300.0 |
LNFT |
58.00 |
17,400.00 |
60.00 |
18,000.00 |
66.00 |
19,800.00 |
|
|
| 704-10 |
guard rail anchor block
|
12   |
EACH |
1,200.00 |
14,400.00 |
1,250.00 |
15,000.00 |
280.00 |
3,360.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
12   |
EACH |
2,500.00 |
30,000.00 |
2,500.00 |
30,000.00 |
2,800.00 |
33,600.00 |
|
|
| 707-01 |
concrete curb
|
8.0 |
LNFT |
35.00 |
280.00 |
17.00 |
136.00 |
32.00 |
256.00 |
|
|
| 707-04 |
asphaltic curb
|
217.0 |
LNFT |
50.00 |
10,850.00 |
4.00 |
868.00 |
18.00 |
3,906.00 |
|
|
| 711-01-C |
riprap (30 lb, 15" thick)
|
24   |
SQYD |
85.00 |
2,040.00 |
135.00 |
3,240.00 |
100.00 |
2,400.00 |
|
|
| 711-01-D |
riprap (55 lb, 18" thick)
|
24   |
SQYD |
100.00 |
2,400.00 |
210.00 |
5,040.00 |
110.00 |
2,640.00 |
|
|
| 711-04 |
geotextile fabric
|
74   |
SQYD |
3.00 |
222.00 |
2.25 |
166.50 |
4.00 |
296.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
58   |
SQYD |
75.00 |
4,350.00 |
80.00 |
4,640.00 |
170.00 |
9,860.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,000.00 |
17,000.00 |
15,711.00 |
15,711.00 |
13,000.00 |
13,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.320 |
MILE |
225.00 |
3,447.00 |
150.00 |
2,298.00 |
400.00 |
6,128.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.478 |
MILE |
150.00 |
1,721.70 |
300.00 |
3,443.40 |
100.00 |
1,147.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
44.600 |
MILE |
1.00 |
44.60 |
300.00 |
13,380.00 |
100.00 |
4,460.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
2,001   |
EACH |
1.50 |
3,001.50 |
2.25 |
4,502.25 |
1.50 |
3,001.50 |
|
|
| 716-01 |
mulch
|
0.5 |
TON |
1,600.00 |
800.00 |
1,600.00 |
800.00 |
1,700.00 |
850.00 |
|
|
| 717-01 |
seeding
|
14   |
LB |
22.00 |
308.00 |
21.00 |
294.00 |
22.00 |
308.00 |
|
|
| 718-01 |
fertilizer
|
320   |
LB |
2.00 |
640.00 |
2.20 |
704.00 |
2.30 |
736.00 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
320   |
SQYD |
3.00 |
960.00 |
2.20 |
704.00 |
2.30 |
736.00 |
|
|
| 726-01 |
bedding material
|
92.0 |
CUYD |
100.00 |
9,200.00 |
135.00 |
12,420.00 |
86.00 |
7,912.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
65,000.00 |
65,000.00 |
190,000.00 |
190,000.00 |
120,000.00 |
120,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
24   |
EACH |
100.00 |
2,400.00 |
80.00 |
1,920.00 |
90.00 |
2,160.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,013   |
EACH |
6.00 |
6,078.00 |
5.00 |
5,065.00 |
5.50 |
5,571.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
22.298 |
MILE |
2,400.00 |
53,515.20 |
2,600.00 |
57,974.80 |
2,500.00 |
55,745.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.739 |
MILE |
1,000.00 |
5,739.00 |
650.00 |
3,730.35 |
900.00 |
5,165.10 |
|
|
| 732-05 |
removal of existing markings
|
7.660 |
MILE |
3,600.00 |
27,576.00 |
4,500.00 |
34,470.00 |
6,200.00 |
47,492.00 |
|
|
| 735-01 |
mailboxes
|
46   |
EACH |
5.00 |
230.00 |
1.10 |
50.60 |
10.00 |
460.00 |
|
|
| 735-02 |
mailbox supports (single)
|
29   |
EACH |
125.00 |
3,625.00 |
115.00 |
3,335.00 |
125.00 |
3,625.00 |
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
200.00 |
1,000.00 |
165.00 |
825.00 |
170.00 |
850.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
350.00 |
700.00 |
325.00 |
650.00 |
340.00 |
680.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
8,000.00 |
8,000.00 |
|
|
| S-001 |
ultra-thin hmac wearing course system (3/4" thick)
|
109,393   |
SQYD |
7.25 |
793,099.25 |
7.10 |
776,690.30 |
8.00 |
875,144.00 |
|
|
| S-002 |
grinding isolated bumps
|
lump |
LUMP |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
18,000.00 |
18,000.00 |
|
|
| S-003 |
sawcuts for pavement patching
|
756   |
LNFT |
15.00 |
11,340.00 |
6.00 |
4,536.00 |
12.00 |
9,072.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,732,325.15 |
|
1,990,990.00 |
|
2,032,490.80 |
|
|
|