| Lead Project: 089-04-0018 |
| Parish: BIENVILLE |
| Routes: LA 9 |
| Description: LA 517 TO LA 147 |
Type Const:
grading, drainage structures, cold planing asphaltic concrete, pavement patching,
superpave asphaltic concrete pavement and related work. |
| Estimated Construction Cost: $3,031,275.30 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
4   |
SQYD |
20.00 |
80.00 |
|
|
|
|
|
|
| 202-02-I |
removal of pipe headwalls
|
5   |
EACH |
750.00 |
3,750.00 |
|
|
|
|
|
|
| 202-02-J |
removal of culvert pipe
|
20   |
LNFT |
50.00 |
1,000.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
32,500.00 |
32,500.00 |
|
|
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
10,000   |
CUYD |
13.50 |
135,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
300   |
CUYD |
46.50 |
13,950.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
21,542.4 |
TON |
105.15 |
2,265,183.36 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
500.0 |
TON |
60.00 |
30,000.00 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,000   |
SQYD |
88.25 |
176,500.00 |
|
|
|
|
|
|
| 701-08 |
relaying pipe
|
4   |
LNFT |
150.00 |
600.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
48   |
LNFT |
200.00 |
9,600.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
500.00 |
1,000.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
600   |
SQYD |
67.50 |
40,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
85,000.00 |
85,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.451 |
MILE |
325.00 |
5,021.58 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.074 |
MILE |
1.00 |
4.07 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
57.630 |
MILE |
1.00 |
57.63 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
30.0 |
TON |
600.00 |
18,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
600   |
LB |
7.00 |
4,200.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
15,000   |
LB |
0.50 |
7,500.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,020   |
EACH |
4.50 |
4,590.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
3.00 |
66.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.815 |
MILE |
2,500.00 |
72,037.50 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.037 |
MILE |
600.00 |
1,222.20 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
400.00 |
400.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
14   |
EACH |
1.00 |
14.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
8   |
EACH |
200.00 |
1,600.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
175.00 |
525.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-001 |
sawing cutting concrete drives
|
30   |
LNFT |
33.33 |
999.90 |
|
|
|
|
|
|
| S-002 |
surface preparation
|
lump |
LUMP |
68,300.00 |
68,300.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,091,601.24 |
|
|
|
|
|
|
|