| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - HUEY STOCKSTILL, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
3,000.00 |
3,000.00 |
450.00 |
450.00 |
1,000.00 |
1,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
8,000.00 |
8,000.00 |
2,193.30 |
2,193.30 |
2,000.00 |
2,000.00 |
|
|
| 202-02-D |
removal of concrete walks and drives
|
330   |
SQYD |
14.00 |
4,620.00 |
8.00 |
2,640.00 |
30.00 |
9,900.00 |
|
|
| 202-02-G |
removal of surfacing and stabilized base
|
2,933.3 |
SQYD |
7.00 |
20,533.10 |
6.00 |
17,599.80 |
5.00 |
14,666.50 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
1,000   |
CUYD |
18.00 |
18,000.00 |
25.00 |
25,000.00 |
50.00 |
50,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
60   |
EACH |
11.00 |
660.00 |
10.00 |
600.00 |
15.00 |
900.00 |
|
|
| 204-06 |
temporary silt fencing
|
1,267   |
LNFT |
4.50 |
5,701.50 |
2.50 |
3,167.50 |
3.00 |
3,801.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
6,077.2 |
TON |
77.00 |
467,944.40 |
102.00 |
619,874.40 |
105.00 |
638,106.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
509.5 |
TON |
150.00 |
76,425.00 |
102.00 |
51,969.00 |
160.00 |
81,520.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
10,190   |
GAL |
4.50 |
45,855.00 |
5.00 |
50,950.00 |
4.50 |
45,855.00 |
|
|
| 507-02-C |
aggregate (s3)
|
17,568   |
SQYD |
2.70 |
47,433.60 |
3.00 |
52,704.00 |
3.25 |
57,096.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,648   |
SQYD |
3.60 |
5,932.80 |
6.50 |
10,712.00 |
5.00 |
8,240.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic concrete
pavement |
- 52   |
CUYD |
0.00 |
0.00 |
5.00 |
- 260.00 |
15.00 |
- 780.00 |
|
|
| 510-02 |
pavement widening
|
66.9 |
SQYD |
80.00 |
5,352.00 |
100.00 |
6,690.00 |
110.00 |
7,359.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
18   |
LNFT |
60.00 |
1,080.00 |
200.00 |
3,600.00 |
120.00 |
2,160.00 |
|
|
| 701-05-K |
side drain pipe (30")
|
16   |
LNFT |
100.00 |
1,600.00 |
225.00 |
3,600.00 |
180.00 |
2,880.00 |
|
|
| 701-11-E |
reinforced concrete pipe arch (extension)(36" x 22")
|
4   |
LNFT |
130.00 |
520.00 |
350.00 |
1,400.00 |
500.00 |
2,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,000.00 |
3,000.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
2,600.00 |
2,600.00 |
2,750.00 |
2,750.00 |
3,500.00 |
3,500.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
20   |
EACH |
2,100.00 |
42,000.00 |
2,600.00 |
52,000.00 |
3,000.00 |
60,000.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
13,200.0 |
LNFT |
16.00 |
211,200.00 |
20.00 |
264,000.00 |
27.00 |
356,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
58,000.00 |
58,000.00 |
16,000.00 |
16,000.00 |
20,000.00 |
20,000.00 |
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
496   |
LNFT |
0.15 |
74.40 |
0.10 |
49.60 |
1.00 |
496.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
1,560   |
LNFT |
0.30 |
468.00 |
0.10 |
156.00 |
1.50 |
2,340.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
206   |
LNFT |
1.00 |
206.00 |
0.10 |
20.60 |
2.00 |
412.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.432 |
MILE |
150.00 |
1,564.80 |
1.00 |
10.43 |
450.00 |
4,694.40 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.330 |
MILE |
400.00 |
1,732.00 |
1.00 |
4.33 |
475.00 |
2,056.75 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
10.036 |
MILE |
800.00 |
8,028.80 |
1.00 |
10.04 |
800.00 |
8,028.80 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
32   |
EACH |
130.00 |
4,160.00 |
1.00 |
32.00 |
100.00 |
3,200.00 |
|
|
| 713-05-B |
temporary pavement legends and symbols (double arrow)
|
8   |
EACH |
150.00 |
1,200.00 |
1.00 |
8.00 |
125.00 |
1,000.00 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
250.00 |
500.00 |
1.00 |
2.00 |
200.00 |
400.00 |
|
|
| 713-05-E |
temporary pavement legends and symbols (school
crossing) |
8   |
EACH |
200.00 |
1,600.00 |
1.00 |
8.00 |
200.00 |
1,600.00 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
330   |
EACH |
1.50 |
495.00 |
1.50 |
495.00 |
1.50 |
495.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
136,000.00 |
136,000.00 |
125,000.00 |
125,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
EACH |
60.00 |
480.00 |
65.00 |
520.00 |
50.00 |
400.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
522   |
EACH |
6.00 |
3,132.00 |
6.00 |
3,132.00 |
6.00 |
3,132.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
248   |
LNFT |
0.60 |
148.80 |
0.50 |
124.00 |
0.60 |
148.80 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
780   |
LNFT |
1.50 |
1,170.00 |
1.00 |
780.00 |
1.40 |
1,092.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
103   |
LNFT |
5.00 |
515.00 |
4.00 |
412.00 |
4.50 |
463.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.018 |
MILE |
2,600.00 |
13,046.80 |
3,000.00 |
15,054.00 |
2,500.00 |
12,545.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.165 |
MILE |
900.00 |
1,948.50 |
800.00 |
1,732.00 |
800.00 |
1,732.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
16   |
EACH |
230.00 |
3,680.00 |
225.00 |
3,600.00 |
200.00 |
3,200.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
4   |
EACH |
250.00 |
1,000.00 |
250.00 |
1,000.00 |
200.00 |
800.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
220.00 |
440.00 |
250.00 |
500.00 |
200.00 |
400.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
450.00 |
450.00 |
500.00 |
500.00 |
400.00 |
400.00 |
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
4   |
EACH |
450.00 |
1,800.00 |
500.00 |
2,000.00 |
400.00 |
1,600.00 |
|
|
| 735-01 |
mailboxes
|
21   |
EACH |
6.00 |
126.00 |
7.00 |
147.00 |
1.00 |
21.00 |
|
|
| 735-02 |
mailbox supports (single)
|
21   |
EACH |
125.00 |
2,625.00 |
150.00 |
3,150.00 |
100.00 |
2,100.00 |
|
|
| 736-09 |
loop detector
|
150   |
LNFT |
11.00 |
1,650.00 |
15.00 |
2,250.00 |
15.00 |
2,250.00 |
|
|
| 736-10 |
underground junction box
|
1   |
EACH |
300.00 |
300.00 |
275.00 |
275.00 |
250.00 |
250.00 |
|
|
| 739-01 |
hydro-seeding
|
1.52 |
ACRE |
2,400.00 |
3,648.00 |
1,500.00 |
2,280.00 |
1,400.00 |
2,128.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
18,000.00 |
18,000.00 |
|
|
| S-001 |
paved gutter drains
|
95   |
each |
280.00 |
26,600.00 |
200.00 |
19,000.00 |
400.00 |
38,000.00 |
|
|
| S-002 |
sawcutting of concrete/asphalt driveways and turnouts
(full depth) |
888   |
LNFT |
5.00 |
4,440.00 |
3.50 |
3,108.00 |
8.00 |
7,104.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,251,686.50 |
|
1,395,000.00 |
|
1,617,092.75 |
|
|
|