Lead Project: 051-07-0020
Parish: W CARROLL
Routes: LA 17
Description: S. OAK GROVE C.L.-JCT. LA 2 AND JCT LA 2 - N. OAK GROVE CL
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete overlay, and related
work.
Estimated Construction Cost: $952,730.25
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $975,827.85
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $996,620.35
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 3,000.00 3,000.00 6,500.00 6,500.00        
502-01 superpave asphaltic concrete 4,294.4    TON 118.00 506,739.20 115.00 493,856.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
154.5    TON 200.00 30,900.00 275.00 42,487.50        
509-01 cold planing asphaltic pavement 40,445      SQYD 2.00 80,890.00 4.00 161,780.00        
509-02 contractor retained reclaimed asphaltic pavement - 2,191      CUYD 0.10 - 219.10 0.10 - 219.10        
510-01-B pavement patching (12" minimum thickness) 944      SQYD 125.00 118,000.00 110.00 103,840.00        
702-04-A adjusting manholes 2      EACH 1,400.00 2,800.00 2,500.00 5,000.00        
702-04-B adjusting catch basins 5      EACH 2,600.00 13,000.00 5,000.00 25,000.00        
713-01 temporary signs & barricades lump      LUMP 48,000.00 48,000.00 36,000.00 36,000.00        
713-02-C temporary pavement markings (8" width) 762      LNFT 1.50 1,143.00 0.25 190.50        
713-02-D temporary pavement markings (12" width) 554      LNFT 2.50 1,385.00 0.35 193.90        
713-02-E temporary pavement markings (24" width) 1,106      LNFT 3.00 3,318.00 0.70 774.20        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.850  MILE 225.00 1,091.25 132.00 640.20        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.850  MILE 200.00 970.00 300.00 1,455.00        
713-04-A temporary pavement markings (solid line)(4" width) 4.850  MILE 250.00 1,212.50 600.00 2,910.00        
713-05-A temporary pavement legends and symbols (arrow) 34      EACH 100.00 3,400.00 50.00 1,700.00        
727-01 mobilization lump      LUMP 95,000.00 95,000.00 70,000.00 70,000.00        
731-02 reflectorized raised pavement markers 1,268      EACH 8.00 10,144.00 5.00 6,340.00        
732-01-C plastic pavement striping (8" width) 381      LNFT 5.00 1,905.00 1.10 419.10        
732-01-D plastic pavement striping (12" width) 262      LNFT 6.00 1,572.00 1.65 432.30        
732-01-E plastic pavement striping (24" width) 553      LNFT 9.00 4,977.00 3.25 1,797.25        
732-02-A plastic pavement striping (solid line) (4" width) 4.850  MILE 3,200.00 15,520.00 2,600.00 12,610.00        
732-03-A plastic pavement striping (broken line)(4" width) 3.930  MILE 2,000.00 7,860.00 650.00 2,554.50        
732-04-A plastic pavement legends & symbols (arrow) 17      EACH 300.00 5,100.00 225.00 3,825.00        
740-01 construction layout lump      LUMP 3,000.00 3,000.00 10,000.00 10,000.00        
S-001 sawcutting asphaltic concrete patches (12 inch depth) 1,800      LNFT 8.40 15,120.00 3.63 6,534.00        
                       
 CONTRACTOR TOTAL       975,827.85   996,620.35        