Letting of 12/10/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 002-05-0031
Parish: MADISON
Routes: US 80
Description: JCT. LA 602 - JCT. LA 3218
Type Const: grading, cold planing asphaltic pavement, pavement patching, drainage structures,
superpave asphaltic concrete pavement and related work.
Estimated Construction Cost: $2,722,122.37
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,255,020.89
2 05789 D & J CONSTRUCTION CO., INC. $2,409,931.19
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 4,000.00 4,000.00 5,000.00 5,000.00        
202-02-D removal of concrete walks & drives 63      SQYD 21.00 1,323.00 22.00 1,386.00        
203-07 borrow (vehicular measurement) 1,419      CUYD 26.00 36,894.00 20.00 28,380.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
773      CUYD 27.00 20,871.00 30.00 23,190.00        
502-01 superpave asphaltic concrete 10,064.9    TON 110.00 1,107,139.00 112.00 1,127,268.80        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
204.3    TON 280.00 57,204.00 162.00 33,096.60        
507-01-A asphaltic material (crs-2p emulsion) 35,554      GAL 5.00 177,770.00 4.25 151,104.50        
507-02-B aggregate (s2) 52,285      SQYD 1.00 52,285.00 1.15 60,127.75        
507-02-C aggregate (s3) 52,285      SQYD 0.80 41,828.00 0.75 39,213.75        
509-01 cold planing asphaltic pavement 52,285      SQYD 2.00 104,570.00 2.50 130,712.50        
509-02 contractor retained reclaimed asphaltic pavement - 2,179      CUYD 0.10 - 217.90 0.10 - 217.90        
510-01-B pavement patching (12" minimum thickness) 2,903      SQYD 100.00 290,300.00 130.00 377,390.00        
510-03 pavement joint repair 175.8    TON 225.00 39,555.00 200.00 35,160.00        
706-02-C concrete drive (6" thick) 63.2    SQYD 75.00 4,740.00 75.00 4,740.00        
713-01 temporary signs & barricades lump      LUMP 30,000.00 30,000.00 125,000.00 125,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
11.139  MILE 180.00 2,005.02 250.00 2,784.75        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
11.139  MILE 300.00 3,341.70 200.00 2,227.80        
713-04-A temporary pavement markings (solid line)(4" width) 22.278  MILE 300.00 6,683.40 1.00 22.28        
713-06-A temporary reflectorized raised pavement markers (tabs) 981      EACH 2.00 1,962.00 2.00 1,962.00        
716-01-A mulch (vegetative) 8.1    TON 400.00 3,240.00 500.00 4,050.00        
717-01 seeding 162      LB 8.00 1,296.00 8.00 1,296.00        
718-01 fertilizer 5,401      LB 0.50 2,700.50 0.50 2,700.50        
726-01 bedding material 12.4    CUYD 100.00 1,240.00 100.00 1,240.00        
727-01 mobilization lump      LUMP 175,000.00 175,000.00 175,000.00 175,000.00        
731-02 reflectorized raised pavement markers 490      EACH 5.00 2,450.00 8.00 3,920.00        
732-02-A plastic pavement striping (solid line) (4" width) 7.667  MILE 2,600.00 19,934.20 3,000.00 23,001.00        
732-03-A plastic pavement striping (broken line)(4" width) 3.713  MILE 650.00 2,413.45 1,800.00 6,683.40        
735-01 mailboxes 6      EACH 1.00 6.00 25.00 150.00        
735-02 mailbox supports (single) 2      EACH 550.00 1,100.00 500.00 1,000.00        
735-03 mailbox supports (double) 2      EACH 550.00 1,100.00 500.00 1,000.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 11,000.00 11,000.00        
805-12-A reinforced concrete box culverts (4'x 3') 15.0    LNFT 550.00 8,250.00 600.00 9,000.00        
S-001 tree trimming lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
S-002 cleaning existing ditches 300      LNFT 12.00 3,600.00 15.00 4,500.00        
S-003 saw cutting concrete drives (6"depth) 60      LNFT 9.00 540.00 10.00 600.00        
S-004 saw cutting asphalt concrete patches 124,146      LNFT 0.12 14,897.52 0.01 1,241.46        
                       
 CONTRACTOR TOTAL       2,255,020.89   2,409,931.19        