| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BENTON & BROWN, LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-E |
removal of concrete curbs
|
50.0 |
LNFT |
9.00 |
450.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,076.0 |
TON |
105.00 |
637,980.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
15.0 |
TON |
150.00 |
2,250.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
55,236   |
SQYD |
3.50 |
193,326.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,615   |
CUYD |
0.10 |
- 261.50 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
103   |
SQYD |
150.00 |
15,450.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
14   |
EACH |
1,200.00 |
16,800.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
50.0 |
LNFT |
50.00 |
2,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
94,500.00 |
94,500.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.738 |
MILE |
330.00 |
4,863.54 |
|
|
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
11.684 |
MILE |
360.00 |
4,206.24 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
16.018 |
MILE |
545.00 |
8,729.81 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
94,500.00 |
94,500.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,266   |
EACH |
5.60 |
7,089.60 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,270   |
LNFT |
1.00 |
1,270.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
609   |
LNFT |
3.60 |
2,192.40 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.339 |
MILE |
2,750.00 |
14,682.25 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.445 |
MILE |
700.00 |
3,111.50 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
36   |
EACH |
215.00 |
7,740.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
32   |
EACH |
240.00 |
7,680.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-001 |
high strain asphalt mixture-reflective crack relief
interlayer |
30,130   |
SQYD |
10.00 |
301,300.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,445,359.84 |
|
|
|
|
|
|
|