| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEST-YET BUILDERS, LLC |
- 2 - BENTON & BROWN, LLC. |
- 3 - MADDEN CONTRACTING CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
60   |
SQYD |
10.00 |
600.00 |
50.00 |
3,000.00 |
55.00 |
3,300.00 |
|
|
| 202-02-I |
removal of culvert pipe
|
154   |
LNFT |
20.00 |
3,080.00 |
20.00 |
3,080.00 |
70.00 |
10,780.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
23,500.00 |
23,500.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
6,200   |
CUYD |
12.00 |
74,400.00 |
19.00 |
117,800.00 |
14.50 |
89,900.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
500   |
CUYD |
50.00 |
25,000.00 |
80.00 |
40,000.00 |
70.00 |
35,000.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
12.0 |
CUYD |
50.00 |
600.00 |
80.00 |
960.00 |
100.00 |
1,200.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
15,625.1 |
TON |
98.00 |
1,531,259.80 |
100.00 |
1,562,510.00 |
106.50 |
1,664,073.15 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,500.0 |
TON |
98.00 |
147,000.00 |
100.00 |
150,000.00 |
90.00 |
135,000.00 |
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
400   |
SQYD |
50.00 |
20,000.00 |
55.00 |
22,000.00 |
70.00 |
28,000.00 |
|
|
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
80   |
LNFT |
100.00 |
8,000.00 |
165.00 |
13,200.00 |
220.00 |
17,600.00 |
|
|
| 701-08 |
relaying pipe
|
16   |
LNFT |
100.00 |
1,600.00 |
130.00 |
2,080.00 |
175.00 |
2,800.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
60.00 |
480.00 |
175.00 |
1,400.00 |
190.00 |
1,520.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
62   |
LNFT |
90.00 |
5,580.00 |
185.00 |
11,470.00 |
205.00 |
12,710.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
42   |
LNFT |
120.00 |
5,040.00 |
190.00 |
7,980.00 |
215.00 |
9,030.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
36   |
LNFT |
160.00 |
5,760.00 |
230.00 |
8,280.00 |
240.00 |
8,640.00 |
|
|
| 701-15 |
concrete collar
|
12   |
EACH |
1,000.00 |
12,000.00 |
930.00 |
11,160.00 |
850.00 |
10,200.00 |
|
|
| 712-04 |
flexible revetment
|
428   |
SQYD |
100.00 |
42,800.00 |
75.00 |
32,100.00 |
80.00 |
34,240.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
55,000.00 |
55,000.00 |
95,400.00 |
95,400.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
60   |
LNFT |
0.75 |
45.00 |
1.20 |
72.00 |
1.00 |
60.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.580 |
MILE |
2,000.00 |
21,160.00 |
350.00 |
3,703.00 |
400.00 |
4,232.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.408 |
MILE |
200.00 |
81.60 |
300.00 |
122.40 |
1.00 |
0.41 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
14.611 |
MILE |
200.00 |
2,922.20 |
460.00 |
6,721.06 |
1.00 |
14.61 |
|
|
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
25.00 |
50.00 |
55.00 |
110.00 |
1.00 |
2.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
16.5 |
TON |
440.00 |
7,260.00 |
935.00 |
15,427.50 |
1,200.00 |
19,800.00 |
|
|
| 726-01 |
bedding material
|
12.0 |
CUYD |
75.00 |
900.00 |
80.00 |
960.00 |
110.00 |
1,320.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
55,000.00 |
55,000.00 |
95,400.00 |
95,400.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
100.00 |
200.00 |
115.00 |
230.00 |
100.00 |
200.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
894   |
EACH |
5.40 |
4,827.60 |
5.40 |
4,827.60 |
4.90 |
4,380.60 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
3.45 |
103.50 |
3.40 |
102.00 |
3.10 |
93.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
28.143 |
MILE |
2,400.00 |
67,543.20 |
2,400.00 |
67,543.20 |
2,190.00 |
61,633.17 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.408 |
MILE |
750.00 |
306.00 |
750.00 |
306.00 |
680.00 |
277.44 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
440.00 |
880.00 |
440.00 |
880.00 |
400.00 |
800.00 |
|
|
| 739-01 |
hydro-seeding
|
16.50 |
ACRE |
1,650.00 |
27,225.00 |
1,500.00 |
24,750.00 |
1,200.00 |
19,800.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
11,000.00 |
11,000.00 |
25,000.00 |
25,000.00 |
|
|
| S-001 |
saw cutting concrete drives
|
260   |
LNFT |
10.00 |
2,600.00 |
12.00 |
3,120.00 |
24.00 |
6,240.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,081,803.90 |
|
2,261,894.76 |
|
2,422,146.38 |
|
|
|