Letting of 11/12/2008 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 850-08-0009
Parish: ST MARTIN
Routes: LA 352
Description: JCT LA 347 - W END BAYOU MERSIER BRIDGE
Type Const: grading, in place cement stabilized base course, lime treatment, cold planing asphaltic
concrete, superpave asphaltic pavement, and related work.
Estimated Construction Cost: $2,386,435.84
 
RankLicenseBidderConstruction Bid
1 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $2,100,904.57
2 04089 H & S CONSTRUCTION CO., INC. $2,135,884.86
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,272,288.74
4 13086 M. MATT DURAND, LLC $2,428,653.53
 
Item Number Item Description Quantity Unit of Measure - 1 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 2 -
H & S CONSTRUCTION CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
M. MATT DURAND, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 360      SQYD 20.00 7,200.00 22.00 7,920.00 20.00 7,200.00 8.00 2,880.00
202-02-I removal of cross drains 448      LNFT 5.00 2,240.00 20.00 8,960.00 25.00 11,200.00 24.00 10,752.00
203-07 borrow (vehicular measurement) 250      CUYD 15.00 3,750.00 22.00 5,500.00 25.00 6,250.00 18.00 4,500.00
203-07-A borrow (vehicular meas.)(selected soils) 300      CUYD 15.00 4,500.00 22.00 6,600.00 25.00 7,500.00 18.00 5,400.00
204-05-A temporary sediment check dams (hay) 40      EACH 75.00 3,000.00 190.00 7,600.00 270.00 10,800.00 150.00 6,000.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 43,808      SQYD 9.00 394,272.00 9.05 396,462.40 9.75 427,128.00 9.80 429,318.40
303-02 removal of existing patches 200      SQYD 5.00 1,000.00 16.55 3,310.00 5.00 1,000.00 10.00 2,000.00
304-05 lime treatment (type e) 200.00   TON 200.00 40,000.00 469.00 93,800.00 400.00 80,000.00 391.50 78,300.00
401-02 aggregate surface course (adjusted vehicular
measurement)
200      CUYD 30.00 6,000.00 80.00 16,000.00 78.00 15,600.00 61.50 12,300.00
502-01 superpave asphaltic concrete 8,859.2    TON 87.00 770,750.40 105.00 930,216.00 108.00 956,793.60 119.00 1,054,244.80
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,300.0    TON 150.00 195,000.00 135.00 175,500.00 160.00 208,000.00 130.00 169,000.00
509-01 cold planing asphaltic pavement 39,281      SQYD 4.00 157,124.00 2.75 108,022.75 1.00 39,281.00 2.00 78,562.00
509-02 contractor retained reclaimed asphaltic pavement - 3,273      CUYD 0.01 - 32.73 0.01 - 32.73 1.00 - 3,273.00 2.00 - 6,546.00
701-01-I cross drain pipe (24" rcp/pcp) 128      LNFT 140.00 17,920.00 140.00 17,920.00 170.00 21,760.00 75.50 9,664.00
701-01-M cross drain pipe (36" rcp/pcp) 64      LNFT 170.00 10,880.00 160.00 10,240.00 195.00 12,480.00 154.00 9,856.00
701-01-N cross drain pipe (42" rcp/pcp) 48      LNFT 190.00 9,120.00 220.00 10,560.00 250.00 12,000.00 180.00 8,640.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 40      LNFT 150.00 6,000.00 150.00 6,000.00 155.00 6,200.00 155.00 6,200.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 112      LNFT 160.00 17,920.00 145.00 16,240.00 175.00 19,600.00 96.00 10,752.00
701-02-G cross drain pipe arch (42" equiv. rcpa) 56      LNFT 200.00 11,200.00 220.00 12,320.00 250.00 14,000.00 185.00 10,360.00
701-08 relaying pipe 8      LNFT 150.00 1,200.00 106.00 848.00 53.00 424.00 220.00 1,760.00
701-15 concrete collar 4      EACH 1,200.00 4,800.00 980.00 3,920.00 1,000.00 4,000.00 2,000.00 8,000.00
706-02-C concrete drive (6" thick) 20.0    SQYD 90.00 1,800.00 111.00 2,220.00 160.00 3,200.00 220.00 4,400.00
706-03-C incidental concrete paving (6" thick) 30.3    SQYD 90.00 2,727.00 88.00 2,666.40 160.00 4,848.00 162.00 4,908.60
707-01 concrete curb 72.4    LNFT 20.00 1,448.00 32.00 2,316.80 50.00 3,620.00 33.00 2,389.20
713-01 temporary signs & barricades lump      LUMP 119,000.00 119,000.00 38,000.00 38,000.00 20,000.00 20,000.00 150,000.00 150,000.00
713-02-C temporary pavement markings (8" width) 200      LNFT 0.25 50.00 0.39 78.00 2.00 400.00 0.40 80.00
713-02-E temporary pavement markings (24" width) 38      LNFT 0.50 19.00 0.99 37.62 2.00 76.00 1.00 38.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
7.869  MILE 600.00 4,721.40 385.00 3,029.57 450.00 3,541.05 1,900.00 14,951.10
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.403  MILE 250.00 600.75 414.00 994.84 525.00 1,261.58 450.00 1,081.35
713-04-A temporary pavement markings (solid line)(4" width) 6.879  MILE 250.00 1,719.75 546.00 3,755.93 790.00 5,434.41 600.00 4,127.40
713-05-A temporary pavement legends and symbols (arrow) 2      EACH 50.00 100.00 56.00 112.00 130.00 260.00 60.00 120.00
713-05-C temporary pavement legends and symbols (only) 2      EACH 50.00 100.00 56.00 112.00 130.00 260.00 60.00 120.00
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 7,000.00 7,000.00 9,500.00 9,500.00 18,000.00 18,000.00
726-01 bedding material 100      CUYD 0.00 0.00 85.00 8,500.00 115.00 11,500.00 99.48 9,948.00
727-01 mobilization lump      LUMP 130,000.00 130,000.00 95,000.00 95,000.00 200,000.00 200,000.00 75,000.00 75,000.00
729-16-B object marker assembly (type 2) 44      EACH 60.00 2,640.00 69.00 3,036.00 60.00 2,640.00 120.00 5,280.00
731-02 reflectorized raised pavement markers 625      EACH 6.00 3,750.00 6.00 3,750.00 6.50 4,062.50 6.00 3,750.00
732-01-C plastic pavement striping (8" width) 200      LNFT 1.25 250.00 1.05 210.00 1.30 260.00 1.10 220.00
732-01-E plastic pavement striping (24" width) 38      LNFT 5.00 190.00 4.15 157.70 5.25 199.50 4.51 171.38
732-02-A plastic pavement striping (solid line) (4" width) 6.879  MILE 3,000.00 20,637.00 3,200.00 22,012.80 2,900.00 19,949.10 3,400.00 23,388.60
732-03-A plastic pavement striping (broken line)(4" width) 2.403  MILE 1,000.00 2,403.00 828.00 1,989.68 1,000.00 2,403.00 900.00 2,162.70
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 225.00 450.00 216.00 432.00 240.00 480.00 234.00 468.00
732-04-C plastic pavement legends & symbols (only) 2      EACH 225.00 450.00 260.00 520.00 240.00 480.00 400.00 800.00
735-01 mailboxes 71      EACH 5.00 355.00 1.10 78.10 10.00 710.00 6.00 426.00
735-02 mailbox supports (single) 34      EACH 125.00 4,250.00 133.00 4,522.00 100.00 3,400.00 120.00 4,080.00
735-03 mailbox supports (double) 9      EACH 175.00 1,575.00 188.00 1,692.00 140.00 1,260.00 250.00 2,250.00
735-04 mailbox supports (multiple) 6      EACH 250.00 1,500.00 355.00 2,130.00 225.00 1,350.00 500.00 3,000.00
739-01 hydro-seeding 0.75   ACRE 2,500.00 1,875.00 2,900.00 2,175.00 3,000.00 2,250.00 2,400.00 1,800.00
740-01 construction layout lump      LUMP 35,700.00 35,700.00 6,000.00 6,000.00 11,000.00 11,000.00 75,000.00 75,000.00
S-001 cement treatment (12" thick) 10,000.0    SQYD 7.50 75,000.00 7.17 71,700.00 7.50 75,000.00 9.00 90,000.00
S-002 full depth sawcutting of existing portland cement
concrete drives
12,500      INFT 1.10 13,750.00 1.10 13,750.00 2.00 25,000.00 1.50 18,750.00
                       
 CONTRACTOR TOTAL       2,100,904.57   2,135,884.86   2,272,288.74   2,428,653.53