| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-02 |
temporary hay or straw bales
|
20   |
EACH |
8.00 |
160.00 |
30.00 |
600.00 |
15.00 |
300.00 |
20.00 |
400.00 |
| 204-06 |
temporary silt fencing
|
2,875   |
LNFT |
1.25 |
3,593.75 |
1.50 |
4,312.50 |
2.00 |
5,750.00 |
1.75 |
5,031.25 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,499   |
CUYD |
20.00 |
69,980.00 |
75.00 |
262,425.00 |
77.85 |
272,397.15 |
80.00 |
279,920.00 |
| 502-01 |
superpave asphaltic concrete
|
9,915.9 |
TON |
100.00 |
991,590.00 |
105.00 |
1,041,169.50 |
84.00 |
832,935.60 |
110.00 |
1,090,749.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
781.6 |
TON |
150.00 |
117,240.00 |
115.00 |
89,884.00 |
125.00 |
97,700.00 |
165.00 |
128,964.00 |
| 509-01 |
cold planing asphaltic pavement
|
1,155   |
SQYD |
20.00 |
23,100.00 |
10.00 |
11,550.00 |
5.00 |
5,775.00 |
10.00 |
11,550.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 33   |
CUYD |
0.01 |
- 0.33 |
0.00 |
0.00 |
0.00 |
0.00 |
1.00 |
- 33.00 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
5,000   |
SQYD |
75.00 |
375,000.00 |
75.00 |
375,000.00 |
100.00 |
500,000.00 |
123.00 |
615,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
85,000.00 |
85,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
6.920 |
MILE |
600.00 |
4,152.00 |
260.00 |
1,799.20 |
400.00 |
2,768.00 |
400.00 |
2,768.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.165 |
MILE |
50.00 |
308.25 |
1.00 |
6.17 |
300.00 |
1,849.50 |
100.00 |
616.50 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
17.700 |
MILE |
50.00 |
885.00 |
1.00 |
17.70 |
450.00 |
7,965.00 |
100.00 |
1,770.00 |
| 713-05-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
25.00 |
50.00 |
1.00 |
2.00 |
75.00 |
150.00 |
50.00 |
100.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
90,000.00 |
90,000.00 |
48,000.00 |
48,000.00 |
210,000.00 |
210,000.00 |
80,000.00 |
80,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
70.00 |
280.00 |
70.00 |
280.00 |
75.00 |
300.00 |
55.00 |
220.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
90.00 |
1,800.00 |
95.00 |
1,900.00 |
85.00 |
1,700.00 |
85.00 |
1,700.00 |
| 731-02 |
reflectorized raised pavement markers
|
916   |
EACH |
6.00 |
5,496.00 |
7.00 |
6,412.00 |
5.50 |
5,038.00 |
5.50 |
5,038.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.700 |
MILE |
2,800.00 |
49,560.00 |
2,900.00 |
51,330.00 |
2,750.00 |
48,675.00 |
2,800.00 |
49,560.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.165 |
MILE |
1,000.00 |
6,165.00 |
675.00 |
4,161.38 |
650.00 |
4,007.25 |
650.00 |
4,007.25 |
| 732-04-D |
plastic pavement legends and symbols (rr crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
500.00 |
1,000.00 |
450.00 |
900.00 |
450.00 |
900.00 |
| 735-01 |
mailboxes
|
148   |
EACH |
5.00 |
740.00 |
6.00 |
888.00 |
1.00 |
148.00 |
5.00 |
740.00 |
| 735-02 |
mailbox supports (single)
|
102   |
EACH |
125.00 |
12,750.00 |
105.00 |
10,710.00 |
125.00 |
12,750.00 |
100.00 |
10,200.00 |
| 735-03 |
mailbox supports (double)
|
21   |
EACH |
150.00 |
3,150.00 |
250.00 |
5,250.00 |
225.00 |
4,725.00 |
135.00 |
2,835.00 |
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
275.00 |
550.00 |
300.00 |
600.00 |
350.00 |
700.00 |
215.00 |
430.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
3,000.00 |
3,000.00 |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
| S-001 |
surface preparation
|
lump |
LUMP |
47,000.00 |
47,000.00 |
58,000.00 |
58,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
19,000   |
LNFT |
5.00 |
95,000.00 |
5.00 |
95,000.00 |
5.00 |
95,000.00 |
3.25 |
61,750.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,994,549.67 |
|
2,158,297.45 |
|
2,179,033.50 |
|
2,444,216.00 |
|